PROJECT TOWER FOUNDATION CONSTRUCTION DESIGNED BY PANKAJ SHERWAL

M/S ATC INDIA INFRASTRUCTURE PVT.


CLIENT CHECKED BY AMIT SHARMA
LTD.
DESIGN OF PILE FOUNDATION FOR
JOB NAME DATE 28-02-2020
NNBT TOWER

INTRODUCTION
This report is showing calculation of pile foundation Design of monopole
Design is Carried out as Per IS:Codes. As mentioned below

Codes Refrence
1.) IS:2911-1 SEC-2
2.) IS:6403
3.) IS:456
Design Parameter
I) Monopole Height = 30 M
II) Wind Speed = 170 Kmph
III) Monopole Type = NNBT
IV) Maximum Foundation forces (Unfactored)
a.) Vertical = 50.5 kN
b.) Moment = 877 kN-M
b.) Shear = 52.5 kN
V) Pile Detail
a.) Type of pile = Bored Cast in situ
b.) Diameter of pile = 500 mm
c.) length of pile = 9000 mm

e.) Nos. of pile = 4 Nos.


f.) Safe Load carying capacity (Unfactored)
i) Pile Compression capacity = 116.64 Ton
j) Pile Uplift capacity = 56.97 Ton
k) Pile Leteral capcity = 4.41 Ton
VI) Design Stadard = IS:456 & IS:2911
VII) Matrial specification
Concrete = 25 N/mm2
Concrete = 415 N/mm2
Geometry Calculation
L 3.1
0.5Dia w 3.1
D 0.8
0.400
(P)Dia 0.5
(P)L 9
2.300 3.1 Area 9.61
5
3.2
y
0.400

x 0.400 2.300 0.400

3.100

a) Max. Unfactored Foundation forces


Axial load (P) = 51 kN
Moment (M) = 877 kN-M
Shear (S) = 53 kN
PROJECT TOWER FOUNDATION CONSTRUCTION DESIGNED BY PANKAJ SHERWAL

M/S ATC INDIA INFRASTRUCTURE PVT.


CLIENT CHECKED BY AMIT SHARMA
LTD.
DESIGN OF PILE FOUNDATION FOR
JOB NAME DATE 28-02-2020
NNBT TOWER

b) Pile Capacities
Group Efficiency = 0.9
Ultimate capcity of pile in Comression = 1166 kN
Ultimate capcity of pile in Tention = 570 kN
Leteral capcity of pile = 44 kN

c) Geometry of foundation

Diameter of pile = 0.5 m


length of pile cap = 3.10 m
width of pile cap = 3.10 m
thickness of pile cap = 0.8 m
length of pile = 9 m
Number of pile = 4 Nos

Unit weight of Concrete = 25 kN/m^3


d) Total Moment at base of pile
a) From Base Moment = 877 kN-m
b) From Shear Force = 53 kN
Moment Compression/Uplift Load on pile = 270 kN
e) Material Properties
Grade of concrete = 25 N/mm^2
Grade of Steel = 415 N/mm^2
Clear Cover = 75 mm

Design of pile

h) Check For Diagonal Loading for Bearing


Comression Load Due to Moment on Pile = 270 kN
Self weight of foundation = 48 kN
Self weight of Column+OD Slab = 23 kN
Total Load on Pile = 340 kN
Load Carrying capacity of pile in bearing = 1166 kN
Hence = Safe
= 3.4 >2.5
i) Check For Diagonal Loading for Uplift
Uplift Load Due to Moment on Pile = 270 kN
Self weight of foundation (DL) = 192 kN
Weight Due to Axial Forces (AL) = 51 kN
Self Weight of Column (CL) = 45 kN
Self Weight of OD (OL) = 46 kN
Self weight of on Each pile (DL+AL+CL+OL)/4 = 83 kN
Total Uplift Load on Each pile = 186 kN
Load Carrying capacity of pile in Uplift = 570 kN
Hence = Safe
3.06 >3
PROJECT TOWER FOUNDATION CONSTRUCTION DESIGNED BY PANKAJ SHERWAL
M/S ATC INDIA INFRASTRUCTURE PVT.
CLIENT CHECKED BY AMIT SHARMA
LTD.
DESIGN OF PILE FOUNDATION FOR
JOB NAME DATE 28-02-2020
NNBT TOWER

j) Checking For Sliding Single Pile


Self weight of (foundation Excluding wt. of piles) = 192 kN
Friction Resistance = 0.25
Lateral Resistance due to self weight
Frictional Resistance x Self weight of pile foundation = 48.1 kN
Lateral Capacity of pile = 52.5 kN
Total shear capacity = 100.55 kN
Actual shear force = 52.5 kN
Hence = Safe
1.9 >1.5
k) Design of pile cap
Number of piles = 4 Nos.
length = 3.10 m
thickness = 0.8 m
Number of pile per raw = 2 Nos.
Diameter of bar considered = 16 mm
l) Load on Each pile
In Compression = 270 kN
In tension = 270 kN
Max load taken by each pile = 297 kN-m
Factored Design moment = 445 kN-m
Effective Depth Required (d. eff. Req) = 237 mm
Effective Depth Provided (d. eff. Req) = 684 mm
Sufficient depth Provided
At X-direction
Mu/bd² = 0.31 N/mm²
Percentage of steel (From sp 16) Fe415 = 0.084
Ast. Required = 1787 mm²
Min Area of steel as pe IS:456-2000 = 2544 mm²
Ast to be provided = 2544 mm²
Spacing required using 16mm dia Bars = 245 mm
Spacing Provided using 16mm dia Bars = 200 mm

At Y-direction
Mu/bd² = 0.31 N/mm²
Percentage of steel (From sp 16) Fe415 = 0.084
Ast. Required = 1787 mm²
Min Area of steek as pe IS:456-2000 = 2544 mm²
Ast to be provided = 2544 mm²
Spacing required using 16mm dia Bars = 245 mm
Spacing Provided using 16mm dia Bars = 200 mm
PROJECT TOWER FOUNDATION CONSTRUCTION DESIGNED BY PANKAJ SHERWAL

M/S ATC INDIA INFRASTRUCTURE PVT.


CLIENT CHECKED BY AMIT SHARMA
LTD.
DESIGN OF PILE FOUNDATION FOR
JOB NAME DATE 28-02-2020
NNBT TOWER

m) Check for Two way shear (around the pile )


Pile Group Characteristics
Max.Pressure = 2069400 N/mm^2
Factored .Forces = 3104100 N/mm^2
Depth of Critical section Provided (D.eff = 684 mm
Actual shear stress (Tv) 1.82 N/mm^2
Permissible shear stress (as per IS 456) = 1.25 N/mm^2
Ksx0.25xSqrt(FCK)

n) Pile Reinforcement in Tention


Permissible Tensile Stress of Reinforcement = 228.25 N/Sq mm
Tension on Pile Each Pile = 270 kN
Dia. Of Pile bars = 16 mm
Area of one bar = 201 mm
Capacity of one bar = 45.87 kN
Nos. of bar Required = 5.88 Nos.
Nos. Of bar Provided = 10 Nos.