You are on page 1of 30

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Check by
Location Date

Specific of gravity (Gs)

No. Sample 1
Location
No. 28 3 25
Wt of picnometer 35.06 35.44 32.54
Wt of picnometer + dry soil 43.18 44.95 43.79
Wt of picnometer + soil + water 90.91 91.89 89.17
Wt of picnometer + water 86 86.11 82.33
Wt of dry soil 8.12 9.51 11.25
Spasific of gravity 2.530 2.550 2.551
Average 2.543
Temperature 26
Corection 0.9983
Average of Gs 2.539

0.020 0.021
-0.001
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Fasilitas Tambang Batubara Check by : Sri W.
Location : Muara Kaman - Kaltim Date : Nov. 2006
Bor location : Kalimatnan Timur No. Bor : BH - 3

Atterberg Limits
No. Sample : UDS 1 UDS 2

Depth : 5.50 - 6.00 11.50 - 12.00


Testing Liquid Limit (LL) Plastic Limit (PL) Liquid Limit (LL) Plastic Limit (PL)
No. 1 2 3 4 1 2 1 2 3 4 1

Wt of can 15.76 15.72 15.79 15.51 15.69 15.44 15.59 15.66 15.60 15.52 15.54

Wt of wet soil + can 31.26 39.56 28.11 30.23 24.40 24.32 33.95 30.79 35.55 39.96 22.18

Wt of dry soil + can 26.14 31.75 24.20 25.60 22.64 22.49 27.31 25.55 28.79 31.93 20.69

Wt of moisting 5.12 7.81 3.91 4.63 1.76 1.83 6.64 5.24 6.76 8.03 1.49

Wt. of dry soil 10.38 16.03 8.41 10.09 6.95 7.05 11.72 9.89 13.19 16.41 5.15

Water content 49.33 48.72 46.49 45.89 25.32 25.96 56.66 52.98 51.25 48.93 28.93

Average 25.64 29.18

Number of blow 11 15 30 35 9 19 29 39

Limit value LL = 47.00 PL = 25.64 LL = NP PL =

UDS 1 5.50 - 6.00 UDS 2 11.50 - 12.00


Water content [% ]
Water content [%]

Flow Curve Flow Curve


50.00
49.50
49.00
48.50
48.00
47.50
47.00
46.50
46.00
45.50
45.00
10 100 1 10 100

Number of Blow Number of Blow

Plastic Limit (PL) = 25.64 % Plastic Limit (PL) = NP %


Liquid Limit (LL) = 47.00 % Liquid Limit (LL) = NP %
Plastic lndex (PI) = 15.61 % Plastic lndex (PI) = NP %
DEPARTMENT
Y
83
: Sri W.
: Nov. 2006
: BH - 3

DS 2

- 12.00

Plastic Limit (PL)

15.61

22.91

21.25

1.66

5.64

29.43

29.18

29.18

100

Blow
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Check by
Location Date

Grain Size Analysis

No. Sample : Sieve W total : 3000 gram

Sieve No. Diametre [mm] Wt. retained [gram] % Retained % passing

1.5 37.500 507.61 16.92 83.08


1" 25.000 419.19 13.97 69.11
3/8" 9.500 443.86 14.80 54.31
4 4.750 430.00 14.33 39.98
10 2.000 292.27 9.74 30.24
40 0.425 403.98 13.47 16.77
200 0.074 259.31 8.64 8.13
2756.22 91.87 100.00

No. Sample : 0 0 Hydrometre Wd = 40.00

Date Time Rh T C Rh + C Zr M D N N'


12/12/11 0 0.0 26 -1 -1.0 17.789 0.0130

0.5 0 -1 -1.0 17.789 0.0130 0.0774 -4.10 -0.33


1 0 -1 -1.0 17.789 0.0130 0.0547 -4.10 -0.33
2 0 -1 -1.0 17.789 0.0130 0.0387 -4.10 -0.33
5 0 -1 -1.0 17.789 0.0130 0.0245 -4.10 -0.33
10 0 -1 -1.0 17.789 0.0130 0.0173 -4.10 -0.33
15 0 -1 -1.0 17.789 0.0130 0.0141 -4.10 -0.33
30 0 -1 -1.0 17.789 0.0130 0.0100 -4.10 -0.33
60 0 -1 -1.0 17.789 0.0130 0.0071 -4.10 -0.33
180 0 -1 -1.0 17.789 0.0130 0.0041 -4.10 -0.33
1140 0 -1 -1.0 16.278 0.0130 0.0015 -4.10 -0.33

Sand
Grav

Clay Silt
el

F M C
100.00
% Finer

90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.000 0.001 0.010 Diametre
0.100 [mm]1.000 10.000 100.000
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project PELATIHAN LAB UJI TANAH Hammer weight 4.5 Check by


Location POLBAN Number of Layer 5 Date
Type MATERIAL KLAS C Blows perlayer 56 DIameter4"

PEMADATAN BERAT SNI 1743


Water content calculation
Location
Add. of water 200% 250% 300% 350%
No. 1a 1b 1c 2a 2b 2c 3a 3b 3c 4a 4b 4c
Weight of can 15.70 15.63 15.58 15.00 15.02 15.00 15.57 15.72 15.70 16.85 15.72 15.53
Weight of wet soil + can 103.69 131.18 117.78 83.43 66.06 80.18 84.27 96.14 93.65 77.48 72.24 82.64
Weight of dry soil + can 101.22 127.62 114.04 80.67 63.56 76.69 79.56 91.55 88.95 72.46 67.30 77.43
Weight of moisting 2.47 3.56 3.74 2.76 2.50 3.49 4.71 4.59 4.70 5.02 4.94 5.21
Weight of dry soil 85.52 111.99 98.46 65.67 48.54 61.69 63.99 75.83 73.25 55.61 51.58 61.90
Water content 2.89 3.18 3.80 4.20 5.15 5.66 7.36 6.05 6.42 9.03 9.58 8.42
Average 3.29 5.00 6.61 9.01

Density calculation
Sample No. 1 2 3 4
Add. of water 200% 250% 300% 350%
Water content, w (%) 3.29 5.00 6.61 9.01
Weight of soil + Muolder ( 11115 11430 11198 11131
Weight of Muolder (gr) 6854 6854 6581 6254
Diametre of Moulder (cm) 15.55 15.55 15.55 15.55
Height of Moulder (cm) 11.855 11.855 11.15 11.8
Volume of soil (cm 3) 2250.26 2250.26 2116.44 2239.82
Weight of soil (gr) 4261 4576 4617 4877
Density (g) (gr/cm 3 ) 1.894 2.034 2.181 2.177
Dry density (g d ) gr/cm 3 1.833 1.937 2.046 1.997
g zav 2.293 2.206 2.131 2.027

3.29 1.833
2.300 Compaction curve 5.00 1.937
Dry Density [gr/cm3]

2.250 6.61 2.046


9.01 1.997
2.200
0.00 0.000
2.150

2.100
Column N
2.050 Polynomial (Column N)

2.000
Column O
Polynomial (Column O)
1.950

1.900
MDD = 2.070
1.850 1.967

1.800
OMC = 7.50
3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 kadar air lapangan
Water content [%]
1.900

1.850

1.800

3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

Water content [%]


ARTMENT

Gs = 2.48

2.293
2.206
2.131
2.027
0.000

gr/cm 3 100 %
95 %
%
5,5 sd 9,5 %
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Hammer weight 4.5 kg OMC : 13.00 %


Location Number of Layer 5 lapis Check by
Type Blows perlayer : 10x / 35/65 Date

CBR Unsoaked
Blows perlayer 10 x 35 x 65 x
t Penetration Ring Load Ring Load Ring Load
menit inch div kg div kg div kg
0.00 0.0000 0 0.0 0 0.0 0 0.0
0.25 0.0125 2 20.0 8 80.0 20 200.0
0.50 0.025 5 50.0 12 120.0 29 290.0
1.00 0.050 8 80.0 25 250.0 45 450.0
1.50 0.075 13 130.0 31 310.0 60 600.0
2.00 0.100 20 200.0 45 450.0 76 760.0
3.00 0.150 36 360.0 62 620.0 94 940.0
4.00 0.200 52 520.0 81 810.0 108 1080.0
6.00 0.300 84 840.0 120 1200.0 145 1450.0
8.00 0.400 105 1050.0 145 1450.0 180 1800.0
10.00 0.500 120
52.0 1200.0
121.16 165 1650.0 200
200.0 2000.0
466

CBR Curve
CBR Value
2250.0
0.1 "
2050.0
63 10 x = 6.67 %
1850.0 1 112 35 x = 15.00 %
0
Load [kg]

x 287 56 x = 25.33 %
1650.0 2
5
x
1450.0 0.2 "
91 10 x = 11.56 %
1250.0
166 25 x = 18.00 %
1050.0 287 56 x = 24.00 %

850.0

650.0

450.0

250.0

50.0
0.0000 0.1000 0.2000 0.3000 0.4000 0.5000 0.6000
Penetration [inch]
450.0

250.0

50.0
0.0000 0.1000 0.2000 0.3000 0.4000 0.5000 0.6000
Penetration [inch]

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT


SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Hammer weight : 4,5 kg OMC : 13.00 %


Location Number of Layer : 5 lapis Check by
Type Blows perlayer : 10x / 25x / 56x Date

CBR Unsoaked
Water content calculation
Number of Blows 10 x 35 x 65 x
No. 1 2 1 2 1 2
Weight of can 4.55 4.67 4.50 4.61 5.30 10.00
Weight of can + wet soil 45.92 45.31 24.90 24.49 24.26 31.79
Weight of can + dry soil 43.05 43.01 23.85 23.26 23.00 30.56
Weight of water 2.87 2.30 1.05 1.23 1.26 1.23
Weight of dry soil 38.50 38.34 19.35 18.65 17.70 20.56
Water content 7.45 6.00 5.43 6.60 7.12 5.98
Average 6.73 6.01 6.55
Dry Density calculation
Number of Blows 10 x 35 x 65 x
Opt.moisture content / OMC 6.73 6.73 6.73
Water content, w (%) 6.73 6.73 6.73
Weight of soil + muolder(gr) 19188 19590 20180
Weight of moulder (gr) 14289 14962 14920
Diametre of moulder (cm) 15.25 15.30 15.15
Height of moulder (cm) 12.73 11.48 12.90
Volume of soil (cm ) 3
2324.3 2110.6 2325.4
Weight of soil (gr) 4899 4628 5260
Density (g) (gr/cm ) 3
2.11 2.19 2.26
Dry density (g d) (gr/cm 3) 1.97 2.05 2.12
Dry Density [gr/cm3]

2.100
Compaction curve
Density Vs CBR
Deg/cm3nsity

2.050
6.67 1.97
2.09
2.000 ### 2.05
Column N 2.07
Polynomial
### 2.12
1.950 2.05
(Column N)
Column O 2.03
1.900 Polynomial
(Column O) 2.01

1.850
1.99
1.97
1.800
1.95
5.00 7.00 9.00 11.00 13.00 15.00

Water content [%]


5.00 10.00 15.00 20.00 25.00 30.00
CBR %
1.900 Polynomial
(Column O) 2.01

1.850 1.99
1.97
1.800
1.95
5.00 7.00 9.00 11.00 13.00 15.00

Water content [%]


5.00 10.00 15.00 20.00 25.00 30.00
CBR %

MDD = 1.950 gr/cm3 OMC = 8.0 % CBR design = 22.0 %


A= 4.7357
D= 6.0273 cm kalibrasi = 0.3 kg/div
0.845 tegangan Normal 2 =
delt. D A Ring div Ph kuat geser Ring div
0.000 28.5437 0 0.00 0.000 0
0.015 28.4727 3.5 1.05 0.037 3
0.030 28.4016 4.9 1.47 0.052 4.5
0.060 28.2596 8 2.40 0.085 7
0.090 28.1175 9.9 2.97 0.106 8.5
0.120 27.9754 10.1 3.03 0.108 9
0.150 27.8333 10.2 3.06 0.110 10.5
0.180 27.6913 10.2 3.06 0.111 12
0.240 27.4071 10.2 3.06 0.112 14
0.300 27.1230 10.2 3.06 0.113 15
0.360 26.8388 11 3.30 0.123 17
0.420 26.5547 12.8 3.84 0.145 18.5
0.480 26.2705 13 3.90 0.148 19
0.540 25.9864 13.5 4.05 0.156 19.5
0.600 25.7023 14 4.20 0.163 20
max= 0,163
1.689 tegangan Normal 2 = 2.534
Ph kuat geser Ring div Ph kuat geser
0 0.000 0 0 0.000
0.9 0.032 5 1.5 0.053
1.35 0.048 10 3 0.106
2.1 0.074 14 4.2 0.149
2.55 0.091 17 5.1 0.181
2.7 0.097 20 6 0.214
3.15 0.113 21.5 6.45 0.232
3.6 0.130 24 7.2 0.260
4.2 0.153 26 7.8 0.285
4.5 0.166 29 8.7 0.321
5.1 0.190 29.5 8.85 0.330
5.55 0.209 31 9.3 0.350
5.7 0.217 31.5 9.45 0.360
5.85 0.225 31.5 9.45 0.364
6 0.233 30 9 0.350
max = 0,233 max = 0,364
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMEN
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Hammer weight 4.5 kg OMC : 12.00 %


Location Number of Layer 5 lapis Check by
Type Blows perlayer : 10x / 25x / 56x Date

CBR soaked
Blows perlayer 10 x 25 x 56 x
t Penetration Ring Load Ring Load Ring Load
menit inch div kg div kg div kg
0.00 0.0000 0 0 0 0.0
0.25 0.0125 25 5 8 64.0
0.50 0.025 5 10 16 128.0
1.00 0.050 7 19 24 192.0
1.50 0.075 95 25 38 304.0
2.00 0.100 11 31 45 360.0
3.00 0.150 13 36 53 424.0
4.00 0.200 15 41 62 496.0
6.00 0.300 17 42 68 544.0
8.00 0.400 19 455 25 200.0
10.00 0.500 26
52.0 121.16 65 94
200.0 752.0
466

CBR Curve
CBR Value
.0
00
36 .0 0.1 "
00
34 .0 63 10 x = 0.00 %
00
32 .0
00 112 25 x = 0.00 %
30 .0 5
Load [kg]

00 6 287 56 x = 12.00 %
28 .0
00 x
26 .0
00 0.2 "
24 .0
00 91 10 x = 0.00 %
22 .0
00
20 .0 166 25 x = 0.00 %
00
18 .0 287 56 x = 11.02 %
00
16 .0
00
14 .0
00
12 .0
00
10 .0
0
80
0
0.
60
0
0.
40
.0 0
20
0.0
0.0000 0.1000 0.2000 0.3000 0.4000 0.5000 0.6000
Penetration [inch]
penetrasi 10x 25x 56x
0.0000 0.0 0.0 0.0
0.0125 0.0 0.0 64.0
0.0250 0.0 0.0 128.0
0.0500 0.0 0.0 192.0
0.0750 0.0 0.0 304.0
0.1000 0.0 0.0 360.0
0.1500 0.0 0.0 424.0
0.2000 0.0 0.0 496.0
0.3000 0.0 0.0 544.0
0.4000 0.0 0.0 200.0
0.5000 0.0 0.0 752.0
0.
80
0
0.
60
0
0.
40
0
0.
20
0.0
0.0000 0.1000 0.2000 0.3000 0.4000 0.5000 0.6000
Penetration [inch]

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMEN


SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Hammer weight : 2.5 kg OMC : 12.00 %


Location Number of Layer : 3 lapis Check by
Type Blows perlayer : 10x / 25x / 56x Date

CBR soaked
Water content calculation
Number of Blows 10 x 25 x 56 x
No. 1 2 1 2 1 2
Weight of can 22.02 21.99 21.82 22.39 22.08 22.04
Weight of can + wet soil 41.81 46.79 46.02 42.96 47.29 40.62
Weight of can + dry soil 39.77 44.23 43.53 40.85 44.69 38.72
Weight of water 2.04 2.56 2.49 2.11 2.60 1.90
Weight of dry soil 17.75 22.24 21.71 18.46 22.61 16.68
Water content 11.49 11.51 11.47 11.43 11.50 11.39
Average 11.50 11.45 11.45
Dry Density calculation
Number of Blows 10 x 25 x 56 x
Opt.moisture content / OMC 12.00 12.00 12.00
Water content, w (%) 17705.00 11.45 11.45
Weight of soil + muolder(gr) 13970 19250 19525
Weight of moulder (gr) 1539 14646 14459
Diametre of moulder (cm) 1250.00 15.24 15.24
Height of moulder (cm) 2313.22 12.68 12.69
Volume of soil (cm )
3
3735.0 2312.1 2313.3
Weight of soil (gr) 12431 4604 5066
Density (g) (gr/cm ) 3
3.33 1.99 2.19
Dry density (g d) (gr/cm 3) 0.02 1.79 1.97

0.00 0.02
0.00 1.79
11.02 1.97
MDD = ### gr/cm3 OMC = 12.0 % CBR design = 35.0 %

6.196 1.806 0.02 0.000


9.309 1.898 1.79 0.000
12.636 1.882 1.97 ###

16.313 1.811

0.000 0.000 MDD = 1.900 gr/cm3


95% M 1.805
OMC = ### %
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Dinamic Cone Penetrometer


Nama Proyek : Dikerjakan: Nama Proyek : Dikerjakan
Lokasi : Tanggal: Lokasi : Tanggal :
STA : 0 + 000 STA : 0 + 100
Lp Hrs 0 cm Lp 0 cm
LPA Klass A 0 cm LPA 0 cm
LPB KlassB 0 cm LPB 0 cm
SG Klass C 0 cm SG 0 cm

P=D/N CBR h v(cbr) hv(cbr) cbr P=D/N CBR h Ö(cbr) hÖ(cbr) cbr
N D N D
( mm ) Lapisan cm % ( mm ) Lapisan cm %
0 0 0 7
2 4 20 8.98 4 2.08 8.31 7.03 3 19 40 3.66 12 1.54 18.50 6.67
5 19 30 5.31 15 1.75 26.18 4 27 20 8.98 8 2.08 16.63
5 30 22 7.94 11 1.99 21.94 5 36 18 10.29 9 2.17 19.57
5 41 22 7.94 11 1.99 21.94 5 44.5 17 11.08 8.5 2.23 18.95
5 53 24 7.09 12 1.92 23.06 5 54 19 9.59 9.5 2.12 20.19
5 64 22 7.94 11 1.99 21.94 5 66 24 7.09 12 1.92 23.06
5 75 22 7.94 11 1.99 21.94 5 85 38 3.92 19 1.58 29.95
5 89 28 5.81 14 1.80 25.17 2 90 25 6.73 5 1.89 9.44
2 97 40 3.66 8 1.54 12.33
39 89 89 15.52 170.48 83 83 15.53 156.27
STA : 0+0 STA : 0+400
Lp 5 cm Lp 5 cm
LPA 15 cm LPA 15 cm
LPB 20 cm LPB 20 cm
SG 30 cm SG 30 cm

P=D/N CBR h Ö(cbr) hÖ(cbr) cbr P=D/N CBR h Ö(cbr) hÖ(cbr) cbr
N D N D
( mm ) Lapisan cm % ( mm ) Lapisan cm %
0 9 0 10
3 24 50 2.75 15 1.40 21.00 2.51 1 18 80 1.50 8 1.14 9.15 4.29
3 34 33.333 4.64 10 1.67 16.68 1 25 70 1.78 7 1.21 8.48
3 59 83.333 1.42 25 1.12 28.09 1 30 50 2.75 5 1.40 7.00
2 66 35 4.35 7 1.63 11.43 2 37 35 4.35 7 1.63 11.43
1 79 130 0.80 13 0.93 12.06 3 44 23.3333 7.36 7 1.94 13.61
2 89 50 2.75 10 1.40 14.00 3 51 23.3333 7.36 7 1.94 13.61
3 92 10 22.00 3 2.80 8.41 3 58.5 25 6.73 7.5 1.89 14.16
1 95 30 5.31 3 1.75 5.24 3 67 28.3333 5.72 8.5 1.79 15.20

86 12.70 116.90 57 12.95 92.65


STA : 0+ 500 STA : 0 + 600
Lp cm Lp cm
LPA cm LPA cm
LPB cm LPB cm
SG cm SG cm

P=D/N CBR h Ö(cbr) hÖ(cbr) cbr P=D/N CBR h Ö(cbr) hÖ(cbr) cbr
N D N D
( mm ) Lapisan cm % ( mm ) Lapisan cm %
0 8 0 12
1 14 60 2.17 6 1.29 7.77 5.12 3 19 23.3333 7.36 7 1.94 13.61 7.76
3 26 40 3.66 12 1.54 18.50 3 24 16.6667 11.36 5 2.25 11.24
3 41 50 2.75 15 1.40 21.00 2 28 20 8.98 4 2.08 8.31
2 46 25 6.73 5 1.89 9.44 3 36 26.6667 6.19 8 1.84 14.69
3 52 20 8.98 6 2.08 12.47 3 39 10 22.00 3 2.80 8.41
3 59 23.333 7.36 7 1.94 13.61 2 45 30 5.31 6 1.75 10.47
3 63 13.333 15.17 4 2.48 9.90 1 48 30 5.31 3 1.75 5.24
3 69 20 8.98 6 2.08 12.47 1 51 30 5.31 3 1.75 5.24
2 76 2 57
2 87 61 14.70 105.16 3 64 39 16.14 77.20
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Chek by
Location Date

CBR Test by DCP


CBR Desg =
N0 STA CBR Ave CBR STD
CBR ave - 1,1STD
1 0 + 0 7.03 10.54 2.021 8.3
2 + 100 13
3 + 200 12
4 + 300 9
5 + 400 12
6 + 500 11
7 + 600 10
8 + 700 13
9 + 800 12
10 + 900 10
11 1 + 0 8
12 + 100 8
13 + 200 12
14 + 300 3.45 4.50 2.715 2.3
15 + 400 3.65
16 + 500 4.32
17 + 600 4.12
18 + 700 5.14
19 + 800 5.23
20 + 900 4.22
21 2 + 0 4.67
22 + 100 4.72
23 + 200 5.12
24 + 300 5.23
25 + 400 5.12
26 + 500 4.12
27 + 600 4.17
28 + 700 4.16
29 + 800 4.76
30 + 900 4.24
31 3 + 0 4.76
32 + 100 5.23
33 + 200 5.12
34 + 300 5.45
35 + 400 5.27
36 + 500 5.67
37 + 600 5.12
38 3 + 700 4.48
NGINEERING DEPARTMENT

ng, Telp. 022 - 201 45 83

Remaks
Segmen - 1

segmen 2
Lembar Pengujian
LABORATORIUM TANAH
JURUSAN TEKNIK SIPIL POLITEKNIK NEGERI BANDUNG

RING TUBE TEST


Nama Proyek : Dikerjakan
Lokasi : Tanggal

STA
No Uraian Satuan 0+ 50 0+ 100 0+ 150
Menentukan Volume Lubang

1 Diameter Ring cm 10 10
2 Tinggi Ring cm 10 10

3 Volume Ring cm³ 78.5 78.5


Rata-rata cm³ 78.5
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 130.0
5 Berat Isi tanah (4)/(3) gr/cm³ 1.66
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) gr/cm³ 1.50
13 Berat Isi kering Lab gr/cm³ 1.65
14 Derajat Kepadatan ( 12 : 13)x100% % 90.94
STA
No Uraian Satuan 0+ 200 0+ 200 0+ 250
Menentukan Volume Lubang
1 Diameter Ring cm 10 10
2 Tinggi Ring cm 10 10
3 Volume Ring cm³ 78.5 78.5
Rata-rata cm³ 78.5
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 130.0
5 Berat Isi tanah (4)/(3) gr/cm³ 1.66
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) gr/cm³ 1.50
13 Berat Isi kering Lab gr/cm³ 2.07
14 Derajat Kepadatan ( 12 : 13)x100% % 72.49
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

RUBBER BALLOON TEST


Nama Proyek : Dikerjakan
Lokasi : Tanggal

STA
No Uraian Satuan 0+ 000 0+ 050 0+ 100
Menentukan Volume Lubang

1 Pembacaan Awal gr 1500 1750


2 Pembacaan akhir gr 750 740

3 Volume Lubang cm³ 750 1010


880
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 1350.00
5 Berat Isi tanah (4)/(3) gr/cm³ 1.53
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) gr/cm³ 1.39
13 Berat Isi kering Lab gr/cm³ 1.65
14 Derajat Kepadatan ( 12 : 13)x100% % 84.24
STA
No Uraian Satuan 0+ 150 0+ 200 0+ 250
Menentukan Volume Lubang
1 Pembacaan Awal gr 1500 1750
2 Pembacaan akhir gr 750 740
3 Volume Lubang cm³ 750 1010
880
Menentukan Berat Isi ,berat isi kering dan Derajat Kepadatan
4 Berat tanah dlm lubang gr 1350.00
5 Berat Isi tanah (4)/(3) gr/cm³ 1.53
6 Berat Tanah + Can gr 53.25
7 Barat Tang kering + Can gr 49.67
8 Berat Can gr 15.15
9 Barat Tang kering ( 7- 8 ) gr 34.52
10 Berat Air (8- 7 ) gr 3.58
11 Kadar Air (10 :9 )x100% % 10.37
12 Berat Isi kering Lap ( (5) : (1 +(11)) gr/cm³ 1.39
13 Berat Isi kering Lab gr/cm³ 2.07
14 Derajat Kepadatan ( 12 : 13)x100% % 67.15
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

SAND CONE TEST


Nama Proyek : Dikerjakan
Lokasi : Tanggal

STA
No Uraian Satuan 0+ 000 0+ 050 0+ 100
Menentukan Berat Pasir dalam Corong

dan Berat isi pasir


DILABORATORIUM (SEKALI SAJA)
1 Berat Botol + Pasir + Corong gr 3284 3605.7 ditimbang pasir saja
2 Berat Pasir sisa dalam Botol gr 0 0 ditimbang

3 Berat Pasir dalam (Silinder kalbrasi dan corong) (1-2) gr 3284 3605.7 hitung

4 Berat Pasir dalam Silinder kal+ Silinder kal gr 0 0 timbang


5 Berat Silinder Kalibrasi gr 0 0 timbang
6 Berat Pasir dalam Silinder ( 4 - 5) gr 1767.9 1760.8 hitung
7 Brt Pasir dlm corong (3)-(6) gr 462.34 459.1 hitung
8 Voleme Silinder Kalibrasi cm³ 1170.24 1170.24 diukur
9 Berat isi Pasir gr/cm³ 1.51 1.50 hitung
10 Berat isi Pasir rata gr/cm³ 1.51
Menentukan Volume Lubang
dan Berat Tanah Dlm Lubang DILAPANGAN
11 Berat Tanah Dalam Lubang gr 847.8 DTIMBANG
12 Berat Botol + Pasir gr 3000 pasir saja /botol 0 gr
13 Berat Pasir sisa dalam Botol gr 1878 timbang
14 Berat Pasir dlm Lubang dan Corong (12 - 13 ) gr 1122 hitung
15 Berat Pasir dalam Lubang (14 - 7) gr 662.9 hitung
16 Volume Lubang ( 15: 10 ) cm³ 439.68 hitung

Menentukan Berat Isi ,berat isi kering


dan Derajat Kepadatan DI LABORATORIUM
17 Berat Isi tanah (11 : 16} gr/cm³ 1.93 hitung
18 Berat Tanah + Can gr
19 Barat Tang kering + Can gr
20 Berat Can gr
21 Barat Tanah kering ( 19 - 20 ) gr
22 Berat Air (18 - 19 ) gr
23 Kadar Air (22 :21 ) % 8.00 speedy
24 Berat Isi kering Lap ( (17) : (1 +(23)) gr/cm³ 1.79 hitung
25 Berat Isi kering Lab gr/cm³ 2.07 pemadatan
26 Derajat Kepadatan ( 24 : 25)x100% % 86.25 No,
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project Check byCheck by


Location Date Date
Laboratory Test Resume
No. Sample 1
Depth 0
Indek Properties symbol unit
1 Specific of gravity Gs - 2.539
2 Liquid limit LL % 47.00
Plastic Limit PL % 25.64
Plasticity index PI % 21.36
3 Grainsize Gravel G %
Sand S %
Silt M %
Clay C % 0.00
Engineering properties STD MODIF

4 Compaction gd g\cm 3 2.070


w opt % 7.50

5 CBR Unsoaked 0.1" 10 x % 6.67


25 x % 15.00
56 x % 25.33
0.2" 10 x % 11.56
25 x % 18.00
56 x % 24.00
CBR dsgn % 22.00

6 Sand Cone gd g\cm 3 1.79


w opt % 8.00
Degree of Density DR % 86.25
7 Rubber Balloon gd g\cm 3
w opt %
Degree of Density DR %
8 Ring Tube gd g\cm 3
w opt %
Degree of Density DR % 86.25 no < 95 %

You might also like