You are on page 1of 1
KSP TEST PILE (M) SDN. BHD. ¢rss.0) 1369, Jalan Kapar, Batu 1% , Sungai Pinang, 41400 Klang, Selangor Darul Ehsan. Tel: 03-3342 7567, 3342 8567 Fax : 03-3344 9827 Email: ksptest@yahoo.com.my GST Reg. No: 0001 6207 0528 ‘Our Ref: KSPTP(M)SB \ 5921 \09\Q\19 25" September 2019 CHINA COMMUNICATION CONSTRUCTION (ECRL) SDN BHD Block AS, Level 3A, Menara 1 Dutamas, Solaris Dutamas, No 1, Jalan Dutamas, 50480 Kuala Lumpur. Email: ngjason42@gmail.com ‘Attn : Mr Jason Ne QUOTATION RE: MAINTAINED LOAD TEST AT KUANTAN ECRL SECTION 6. Reference to the above, we ate pleased to submit our quotation as follow: - No. Description Qiy_| Price (Ri) | Amount (RN 1. | To Supply and Conduct Maintained Load Text—17S0t0n, (a) For Initial Point @RMIS0/ton tne | 262,500.00 262,500.00 2. | Charges for additional 10% Test Blocks. 175tons | 150.00} 26,250.00 3, | Renting of 1000t Load Celt 2novtest | 2,000.00} 4,000.00 4. | Bearing Calculation with PE Endorsement. rept | 2,000.00| 2,000.00 5. | Kentedge Calelation with PE Endorsement (opinat) | trp | 20000| Rate Only 6, | Site visitcharges. (optional) trip | 3,000.00] 3,000.00 Note: (i) Crawler crane and skylift to be provided by China | ‘Communication Construction (ECRL). Workable platform and access. Adequate insurance for site works/worker’s ‘compensation insurance to be provide by C! Communication Construction (ECRL). (iv) Instrumentation by others. ‘Total (RM) | 297,750.00 a) Total maximun test duration is 48hrs after which there willbe a charge of RS for every hour onwards. ) Food allowance for supervisory sta at the sit, load el, data logge (digital, scaffolding, sport ish and consultant fee isexcluded ©) Pile head preparation by other. 4) Keatledges provided as per quotation plus 10% higher for additonal load e) Four set of graph /eport will be submited, any’ additional copies will be charge aeordingly 1) Allprices are quoted in Ringit Malaysian. 4) Interest Charge of one and bal percent (1%) pe sum willbe levied onal overdue acsounts, hh) Payment Terms: (a) Advance payment of 50% o be made while confirms the order. (©) Balance of pavment to be sted upon submission of invoice 3) Five week's notice for preparation and mobilization, 4) Validity of quotation - 30 days fom above date 1k) Full payment agreed upen as per quotation to be elfected after completion of test and submission of official reports iespectve ofthe test results. Kindly confirm and acknowiedge ecept and return via fax tous fr our retention. Please do not hesitate to contact us if you need futher queries. Thank you. ‘Yours faithfully, KSP TEST PILE (M) SDN. BHD. We, herehy agreed and confirmed the above, Lim Chew Yeng eo SoS

You might also like