Professional Documents
Culture Documents
Chapter4 troubleshooting.............................................................................. 15
Chapter5 Liquid System diagram................................................................21
edition:A/0
1-
Chapter 1 Foreword
Functionality
Operation
maintenance.
2-
Chapter 2 Function and operation
Display
Sample needle
Power light
Start Key
3-
Second:Operation Process
1) After installing the machine,put the power on and enter into the system
2) Test blank once,after that it will show the data for the background check .Repeat
blank test till the values of all the five parameters namely WBC, RBC, HgB,PLT and
3) Once Blank is in acceptable range patient samples can be tested . Put the patient
sample under the sample probe and press the start key . Ensure that bubble is not
entering during the aspiration procedure . Move the sample tube along with the
sample probe so that sample enters correctly into the measuring chamber.
4) Before the test is completed no other operation can be executed . After completion
the needle come back to the home position and is ready for the next sample
aspiration.
5) Press the key “print”. The results are printed on the thermal printer paper
6) After finishing measure sample click the right key,the menu will pop-up
last bar of the menu is “shutdown” key,press this key,it will show “please
shutdown power “ a few minutes later, operator can turn off the power.
4-
2.2 ) Function Introduction
1. Interface board
P104 bus
enlarge
Electromagnetic
Two-way
CPLD<---HGB HGB ·enlarge
Valve drive
Simple Introduction
1) CPLD total control unit.
Control every function module how to communicate with P104.
2) Motor control and driver
Control motor working and amplify signal
3) Electromagnetic valve driver.
Amplify the signal of electromagnetic valve driver
4) Printer driver
Amplify the signal of printer driver.
5) WBC-RBC amplify
Amplified WBC-RBC signal that can be earlier to change it to digital signal.
5-
6) HGB amplify
1) Amplified HGB signal that can be earlier to change it to digital signal.
2) Supply power to the HGB lamp.
7) P104 bus.
The bus that Connect computer board with CPLD of interface board.
8) Analog power supply.
1) Supply power to each part,+48V ,+12V ,+8V , 8V.
2) Protect each part supply power.
1) Function Diagram
Sampling pump
TWO WAY
Sampling
needle Liquid
Two way
and road
2 . Simple Introduction
1) Liquid tubing board and flow sensor board.
1) Liquid tubing board.
6-
2) Sample needle.
3) Measurement cup
4) Vacuum pump
5) Sampling pump
7-
Chapter 3- MAINTENANCE
maintenance can keep the instrument in a good working status, and can we get the
This chapter introduces some preventive methods for service and maintenance.
If you want to have more information, please contact the customer service department of
According to the requirements for maintenance of the instrument during the procedures,
we divide the preventive service and maintenance into the following types: daily, weekly,
Warning:
carry out a reasonable maintenance schedule. Neglecting of this may result in machine
breakdown.
Caution:
Avoid using corrosive acids, alkali, and volatile organic solvent such as: acetone,
ether, chloroforms to wipe the appearance of instrument. Only neutral detergent
should be used.
8-
3.1.2 Replace Fuse
The fuse is installed in the fuse-box on the side of power switch. Open the box to
Warning:
Run
The instrument has installed daily maintenance procedure. On running, it can execute
auto cleaning procedure according to the quantity of the sample to keep the
When the instrument is shutdown, it will run daily shutdown auto cleaning procedure.
You only need to clean the workbench and wipe the appearance of instrument when
the power-off.
Act as follows:
9-
b) In the main operation window, press the right key of the mouse. In the menu area,
Operate as follows:
a) Turn off the power supply, and pull out the power line.
b) Hold up the air filter cover with slotted screwdriver. Take off the cover and the
net.
c) Clean them with neutral detergent brush and put them in the shade.
d) Airing naturally .Brush away the dust clinging on the air filter grid at the rear
panel of instrument.
e) Put the air filter grid on the air filter net carefully. Planish them.
Notice:
Only can use the neutral detergent cleaning the air filter. Avoid airing it with heat.
the authorized engineer of MERIL DIAGNOSTICS PVT LTD. Please contact the customer
10 -
MAINTENANCE BEFORE TRANSPORT OR FOR THE INSTRUMENT
Plug the stopples which were pulled out at the first installation into the
corresponding tube connector.
Pull out diluent connection tube, rinse connection tube, lyse connection tube and
waste connection tube and clean them with distilled water. Dry them in shady
Pull out the power wire,packing it in plastics after cleaning with neutral detergent.
Put the instrument and parts packed in plastics into packing cases.
11 -
Chapter-4 TRAUBLESHOOTING
Malfunction
Reason Treatment program
phenomenon
A:
1)Checking the tube connector whether is
it leakage
2)Enter into submenu :
the situation which liquid flow
Mechanic:(password:6800)
into the flow sensor board.
checking each solenoid
A .when the liquid flow too
valve whether it is normal , if
WBC,RBC fast
not, change it.
bubble B .when liquid flow into flow
B)when taking count of measurement
sensor, both lamp is always
time ,check the lamp: when there is liquid
on or bottom lamp is always
the lamp will be on, no liquid the lamp will
on
be off. If the lamp is always on, press
several pieces of gummed papers until it
is normal. for other reason, change the
board.
12 -
A) Whether the HBG lamp is
on. A) If the lamp is off , check whether the 1
B) whether the HGB receiver feet of U57 is 5V, if not ,change the
HGB
line have problem. interface board
Malfunction
C)Enter into mechanic B) Reconnecting the receiver line
HGB bubble
(password:6800),check C)Adjust the resistance VR6 to normal
whether the HGB voltage is range 4.25—4.31V
normal range 4.25—4.31
13 -
A ground line state
B whether it is shared socket
with large efficient machine
C whether environment
temperature is suit for the
request of the machine
A detect the voltage of the groundwire
D the constant
and zero curve whether it is less than
maintenance :once every
5V.if it is more than 5V ,reassemble
week
B it is separated from the large efficient
E whether the reagent is
machine
expired date or sordid
PLT unstable C environment temperature is suit for the
F check every module
request of the machine
especially the test cup
D if not, use the function “park” clean all
module whether it is rusting,
the tubing
whether the fasten board is
E change the reagent
separated from ground.(how
F descaling ,reassemble
to check the separation: unfix
the signal wire, check
whether the fasten board is
separated from cabinet. The
right assemblage is
separation
14 -
A ground line state
B whether it is shared socket
with large efficient machine
C whether environment
temperature is suit for the
request of the machine A detect the voltage of the groundwire
D the constant and zero curve whether it is less than
maintenance :once every 5V.if it is more than 5V ,reassemble
week B it is separated from the large efficient
E whether the reagent is machine
expired date or sordid C environment temperature is suit for the
All the items
F check every module request of the machine
unstable
especially the test cup D if not, use the function “park” clean all
module whether it is rusting, the tubing
whether the fasten board is E change the reagent
separated from ground.(how F descaling ,reassemble
to check the separation: unfix
the signal wire, check
whether the fasten board is
separated
15 -
A if the value of HGB is
zero, the lyse is not enough
in the tube.
B enter into mechanic A change the piston gasket ring of
(password: 6800), check sampling room, and prime lyse.
WBC no whether the function B reconnect the cup board, if no use,
value or the “sampling” “break” is normal. change the interface board
value is”*” C If the value of HGB is not C if the screen show the pulse diagram,
zero, check the pulse of adjust the resistance VR8 clockwise or
WBC,RBC,PLT(enter into anticlockwise,
special, the password is
6666, press F5 to watch the
pulse of WBC )
A if the value of HGB is
zero, the lyse is not enough
in the tube. A reconnect the cup board, if no use,
B If the value of HGB is not change the interface board
RBC no value zero, check the pulse of B if the screen show the pulse diagram,
WBC,RBC,PLT(enter into adjust the resistance VR8 clockwise or
special, the password is anticlockwise,
6666, press F6 to watch the
pulse of RBC )
16 -
A check the voltage of 1
feet of J33 whether it is 1.2V A if not, the sensor have broken, change
B wheter the voltage of 3 it
distort no
feet is greater than 3.8 when B if the voltage far from the abnormal
diluent
the tube have liquid or less range ,change the sensor\Opposite,
than 2.7V when it have not adjust the resistance R151or R142
liquid
A check the voltage of 1
feet of J33 whether it is 1.2V, A if not, the sensor have broken, change
B wheter the voltage of 3 it
distort no
feet is greater than 3.8 when B if the voltage far from the abnormal
rinse
the tube have liquid or less range ,change the sensor\Opposite,
than 2.7V when it have not adjust the resistance R152 or R143
liquid
REC NO Printer paper running out or not A check if there is printer paper
PAPER Properly installed B Check if the printer is well installed
17 -
Chapter5 Liquid System diagram
18 -