0% found this document useful (0 votes)
10K views1 page

Forwarding Letter Sample

The document is a submission letter from a consultant to a client enclosing specifications, bills of quantities, estimates and drawings for the construction of a 10-story male student hall and revised estimates for a 10-story staff quarter building, fulfilling the terms of their consultancy contract. Attached are the architectural, structural, electrical, plumbing and mechanical drawings for the student hall as well as specifications, estimates and bills of quantities for both projects.

Uploaded by

Mehedi H. Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10K views1 page

Forwarding Letter Sample

The document is a submission letter from a consultant to a client enclosing specifications, bills of quantities, estimates and drawings for the construction of a 10-story male student hall and revised estimates for a 10-story staff quarter building, fulfilling the terms of their consultancy contract. Attached are the architectural, structural, electrical, plumbing and mechanical drawings for the student hall as well as specifications, estimates and bills of quantities for both projects.

Uploaded by

Mehedi H. Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Project Specifications and Approval

Subject: Submission of Specifications, BOQ & Estimate, Structural, Architectural, Electrical, Plumbing and

Mechanical (HVAC, Fire Detection & Protection System) Drawings of 10 Storied Male Students Hall and
Minor revised BOQ and Estimate of 10 Storied Staff Quarter.

Dear Sir,

In fulfillment of the terms of reference of our contract for the above consultancy services we have the pleasure
to submit herewith 1 (one) sets of Specifications, BOQ & Estimate, Structural, Architectural, Electrical,
Plumbing and Mechanical (HVAC, Fire Detection & Protection System) Drawings for tendering of the
construction of 10 Storied Male Students Hall.

Also find attached 1 (one) copy of minor revised BOQ and Estimate of 10 Storied Staff Quarter Building.

We are forwarding the above documents for your necessary action.

Yours Sincerely

------------------------------------

Attachment:
1. Architectural, Structural, Electrical, Plumbing and Mechanical (HVAC, Fire Detection & Protection System)
Drawings of 10 Storied Male Students Hall.
2. BOQ & Estimate of 10 Storied Male Students Hall.
3. Specifications of 10 Storied Male Students Hall.
4. BOQ & Estimate of 10 Storied Staff Quarter.

You might also like