FAREAST SHIPMANAGEMENT HONGKONG LIMITED ISSUE 0 REV 0 PAGE 1/3

SHIPS FILE NO M65 OFFICE FILE NO NA FORM NO: 6.9 DATE 01.09.2011
RISK ASSESSMENT PROCEDURE SECTION: 6.9

RISK LEVEL
RISK ASSESSMENT
Severity/ Slightly Harmful Extremely
Likelihood Harmful Harmful
Ships Name RA No H-08/2017 Likely Moderate Substantial Intolerable
Risk 3 Risk 4 Risk 5
Work Activity Hot Work - Securing incinerator door Unlikely Tolerable Moderate Substantial
Risk 2 Risk 3 Risk 4
Hazard Identification Possible Consequences Controls Required Highly Minimal Tolerable Moderate
Analyse/review/Assess – WHAT Unlikely Risk 1 Risk 2 Risk 3
IF? a. Select the expression for likelihood which most
applies to the hazard. (1st column)
Decision b. Select the expression for severity which most applies
to the hazard (1st row)
c. Cross reference using the above table to determine the
level of risk. E.g. the likelihood = unlikely, and
Monitor / Review severity = harmful, then risk level 3
Implement d. If risk level is 3 or above then additional controls are
(Who Responsible /Next Review / By Whom)
required

No Hazards Possible Consequences Existing Control / Safeguards Severity Likelihood Risk Additional
associated with L Controls
Activity e Rq’d. Y/N
v
el
1 Fire and Explosion Injury to crew, damage to Procedures laid down in the company to be followed. 4 2 3 N
vessel. Hot work permit checks to be done prior
commencement of job.
2 Welding, Physical hazards: COSWP, Warning Notices. Procedures For Safe 2 1 2 N
gas Cutting Danger of electrocution due Operation Of Equipment, , Guidelines On Correct Use
Operations. to contact Of Equipments, Manufacturer’s Written explanation of
with live electrical source procedures for safe operation of equipment
which may
lead to injury or even death.

Copyrights: FSMHK. All rights reserved


Any unauthorized reproduction of this manual, in any form is prohibited
FAREAST SHIPMANAGEMENT HONGKONG LIMITED ISSUE 0 REV 0 PAGE 2/3
SHIPS FILE NO M65 OFFICE FILE NO NA FORM NO: 6.9 DATE 01.09.2011
RISK ASSESSMENT PROCEDURE SECTION: 6.9

3 Electric arc/ gas Electric shock to the operator 1. Hands should not be wet when touching the electric 1 2 2 N
Welding equipment arc welding equipment
preparation. 2. All connections to be checked for tightness.
3. All cables and electrode holders to be inspected for
insulation and good condition.
4. Correct welding current to be maintained.
6. Cables to be spread out and run neatly and clear
from area where operator will be standing.
7. Flame arrestor to be checked to be in place and in
good condition.
4 Welding of flat bar Spark may cause source of All combustible materials to be removed from adjacent 2 1 2 N
on the bulkhead on ignition and fire may take spaces. Portable Fire extinguisher stby. Charged Fire
height place below or near welding hose to be kept in readiness. One person to be
site standby at all times below the platform and frequently
checking the Hot spots. Any change in temp to be
reported to responsible person. Immediately and Hot
work to be stopped. Chief officer to inspect site before
commencing hotwork.
5 Welding in closed Carbon Monoxide gases 1. Monitoring of atmosphere to be carried out every 30 2 1 2 N
area may get collected in the area minutesor frequent and O2 content, LEL content
of hot work and may cause and CO content to be checked.
asphyxia 2. The Gas equipment to be checked and span
adjusted prior use.
3. Ventilation of area to be done to remove residual
gases and smoke.
4. Hot work approval from office.
5. Wear portable gas detector.
6. Hot work will be supervised by the senior officer.
6 Handling work 1. Burn injuries to operators 1. All work pieces to be left for cooling for some time 2 1 2 N
pieces after 2. Injury due to falling work before handling.
completion of hot pieces/ tools 2. Hot work pieces if required to be moved must be
work done using proper PPE and proper insulated tools
( pliers, etc for small work pieces)
7 Wrong equipment 1. Eye injury due to flying 1. Proper eye protection to be worn by the operator. 2 1 2 N
(eg: Using chipping pieces
hammer for
removing slag)
Copyrights: FSMHK. All rights reserved
Any unauthorized reproduction of this manual, in any form is prohibited
FAREAST SHIPMANAGEMENT HONGKONG LIMITED ISSUE 0 REV 0 PAGE 3/3
SHIPS FILE NO M65 OFFICE FILE NO NA FORM NO: 6.9 DATE 01.09.2011
RISK ASSESSMENT PROCEDURE SECTION: 6.9

8 Vessel movement Physical hazards, slips and Weather reports to be checked, Vessels course to be 1 2 1 N
during welding and injury, electric shock adjusted to prevent movement tool box meeting to be
cutting operations done and prevailing situation to be assessed.
Additional Control Measures

Hazard Further action if necessary (Additional Severity Likelihood Risk Level Remedial action due Date Completed
No Controls) After
Additional
Controls

Additional Comments:

Office Comments :

Signed Chief Officer/Chief Engineer Master Date