ACTION SOW A:

Stress Analisys Report for the lines afected in this SOW was not necessary during original
Project. For this reason, it will not be necessary to make a new report on the flexibility of these
lines as a result of this action, although a detailed analysis of the situation of the system has been
carried out through CAESAR II 2018.

action requires the possible replacement of some existing supports due to the addition of
new valves.

The following conclusions has been drawn from the study of the effects of action A:

A) The stresses calculated for sustained loads are lower than the allowable stresses at the
operating temperature, in accordance with section 12.3.2 of Code EN 13480.

B) The stresses calculated for occasional loads (seismic, wind and surge) are lower than the
allowable stress 1.2.fh at the operating temperature, in accordance with section 12.3.3 of
Code EN 13480.

C) The stresses calculated for secondary loads (thermal and imposed displacement) are
lower than the allowable stress, defined in the equation 12.3.4-2 of section 12.3.4 of the
Code EN 13480.

D) Supports

a. One additional support is required for new by-pass.

b. The inclusion of the new valves produce over load on existing supports, so it will be
necessary to modify existing supports.

c. The addition of the new valves does not generate overloads in the pump nozzles.
The nozzles were checked for occasional loads, operating loads and for bowing.
The loads obtained in the nozzles were not modified with respect to the nozzle loads
that were previously held.
Plant Shutdown Gas Year 2020-2021

ADJUSTMENT
AREA

FIGURE 1: ISOMETRIC VIEW SOW A

ADDED VALVES

FIGURE 2 DETAIL OF CALCULATION FOR ACTION SOW A


Plant Shutdown Gas Year 2020-2021

FIGURE 3 IDENTIFICATION OF SUPPORTS WITH OVER LOADS FOR ACTION SOW A

FIGURE 4 IDENTIFICATION OF SUPPORTS WITH OVER LOADS FOR ACTION SOW A

FIGURE 5 IDENTIFICATION OF SUPPORTS WITH OVER LOADS FOR ACTION SOW A


Plant Shutdown Gas Year 2020-2021

Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm. Support No.
3(HYD) 0 -7367 0 0 0 0 0.001 0 -0.217
4(OPE) 0 -12815 0 0 0 0 28.387 0 0.202
5(OPE) 0 -13434 0 0 0 0 -2.803 0 -0.568
ORIGINAL
6(SUS) 0 -13394 0 0 0 0 0.001 0 -0.531
LOADS
46(OCC) 0 -16090 0 0 0 0 0.014 0 -9.292
47(OCC) 0 -17094 0 0 0 0 0.009 0 -12.135
48(OCC) 0 -13450 0 0 0 0 0.001 0 -0.59
SUPPORT
No. 1
3(HYD) 0 -6498 0 0 0 0 0 0 0.004
4(OPE) 0 -11722 0 0 0 0 28.39 0 0.569
5(OPE) 0 -12451 0 0 0 0 -2.804 0 -0.133
NEW LOADS 6(SUS) 0 -12356 0 0 0 0 0 0 -0.111
46(OCC) 0 -14899 0 0 0 0 0.01 0 -9.996
47(OCC) 0 -15590 0 0 0 0 0.007 0 -12
48(OCC) 0 -11962 0 0 0 0 0 0 -0.326

3(HYD) 0 -12514 0 0 0 0 -0.193 0 -0.281


4(OPE) 0 -23398 0 0 0 0 25.069 3.964 -4.99
5(OPE) 0 -25230 0 0 0 0 -3.296 0.528 -0.226
ORIGINAL
6(SUS) 0 -25090 0 0 0 0 -0.757 0.79 -0.687
LOADS
46(OCC) 0 -25272 0 0 0 0 -1.364 1.129 -9.203
47(OCC) 0 -25504 0 0 0 0 -2.359 1.569 -12.003
48(OCC) 0 -25093 0 0 0 0 -0.768 0.793 -0.748
SUPPORT
No. 2
3(HYD) 0 -13116 0 0 0 0 -0.382 0 -0.089
4(OPE) 0 -24253 0 0 0 0 24.764 3.918 -4.724
5(OPE) 0 -26074 0 0 0 0 -3.575 0.503 0.165
NEW LOADS 6(SUS) 0 -25939 0 0 0 0 -1.039 0.756 -0.317
46(OCC) 0 -26160 0 0 0 0 -1.645 1.036 -9.934
47(OCC) 0 -26396 0 0 0 0 -2.649 1.483 -11.969
48(OCC) 0 -25978 0 0 0 0 -1.056 0.695 -0.531

3(HYD) 0 -52362 0 0 0 0 0.001 0 -0.111


4(OPE) 0 -68858 0 0 0 0 14.213 0 -40.042
5(OPE) 0 -68685 0 0 0 0 -1.402 0 3.646
ORIGINAL
6(SUS) 0 -68688 0 0 0 0 0.001 0 -0.305
LOADS
46(OCC) 0 -70701 0 0 0 0 0.012 0 -7.909
47(OCC) 0 -71175 0 0 0 0 0.006 0 -10.164
48(OCC) 0 -68724 0 0 0 0 0.001 0 -0.353
SUPPORT
No. 3
3(HYD) 0 -60899 0 0 0 0 0.001 0 0.105
4(OPE) 0 -77006 0 0 0 0 14.215 0 -39.387
5(OPE) 0 -75955 0 0 0 0 -1.403 0 4.047
NEW LOADS 6(SUS) 0 -76137 0 0 0 0 0.001 0 0.114
46(OCC) 0 -79506 0 0 0 0 0.008 0 -8.317
47(OCC) 0 -79515 0 0 0 0 0.004 0 -9.663
48(OCC) 0 -77211 0 0 0 0 0.001 0 -0.046
FIGURE 6 COMPARISSON OF LOADINGS FOR PIPE SUPPORTS FOR ACTION SOW A
Plant Shutdown Gas Year 2020-2021

Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm. Support No.
3(HYD) 402 -26901 0 0 0 0 0 0 -0.053
4(OPE) 31634 -32884 0 0 0 0 0 0 -81.363
5(OPE) -3301 -43614 0 0 0 0 0 0 7.885
ORIGINAL
6(SUS) 129 -42752 0 0 0 0 0 0 -0.15
LOADS
46(OCC) -15042 -45431 0 0 0 0 0 0 -4.468
47(OCC) -9689 -45043 0 0 0 0 0 0 -5.674
48(OCC) -895 -43247 0 0 0 0 0 0 -0.176
SUPPORT
No. 4
3(HYD) 951 -43307 0 0 0 0 0 0 0.064
4(OPE) 29862 -51139 0 0 0 0 0 0 -80.76
5(OPE) -1611 -63175 0 0 0 0 0 0 8.082
NEW LOADS 6(SUS) 1486 -61960 0 0 0 0 0 0 0.083
46(OCC) 18460 -62987 0 0 0 0 0 0 4.649
47(OCC) 10639 -62319 0 0 0 0 0 0 5.233
48(OCC) 1972 -60450 0 0 0 0 0 0 0.04

3(HYD) 0 -3514 259 0 0 0 -0.002 0 0


4(OPE) 0 -4950 3666 0 0 0 -40.137 0 0
5(OPE) 0 -6757 42 0 0 0 3.926 0 0
ORIGINAL
6(SUS) 0 -6605 302 0 0 0 -0.003 0 0
LOADS
46(OCC) 0 -8023 4795 0 0 0 -0.082 0 0
47(OCC) 0 -7284 6965 0 0 0 -0.041 0 0
48(OCC) 0 -7153 4222 0 0 0 -0.015 0 0
SUPPORT
No. 5
3(HYD) 0 -6347 256 0 0 0 -0.002 0 0
4(OPE) 0 -7754 3718 0 0 0 -40.132 0 0
5(OPE) 0 -9565 8 0 0 0 3.926 0 0
NEW LOADS 6(SUS) 0 -9415 275 0 0 0 -0.004 0 0
46(OCC) 0 -11370 5194 0 0 0 -0.091 0 0
47(OCC) 0 -10094 7062 0 0 0 -0.042 0 0
48(OCC) 0 -9965 4181 0 0 0 -0.016 0 0

3(HYD) 0 -14747 0 0 0 0 -0.021 0 0.109


4(OPE) 0 -20933 0 0 0 0 -44.059 0 10.266
5(OPE) 0 -20887 0 0 0 0 4.396 0 -0.867
ORIGINAL
6(SUS) 0 -20872 0 0 0 0 0.058 0 0.13
LOADS
46(OCC) 0 -25016 0 0 0 0 2.766 0 3.57
47(OCC) 0 -23034 0 0 0 0 -1.966 0 2.462
48(OCC) 0 -27567 0 0 0 0 0.669 0 -5.27
SUPPORT
No. 6
3(HYD) 0 -19420 0 0 0 0 -0.084 0 0.061
4(OPE) 0 -24779 0 0 0 0 -43.736 0 10.314
5(OPE) 0 -25476 0 0 0 0 4.333 0 -0.943
NEW LOADS 6(SUS) 0 -25389 0 0 0 0 0.027 0 0.065
46(OCC) 0 -30329 0 0 0 0 -2.69 0 3.662
47(OCC) 0 -27713 0 0 0 0 -2.01 0 2.417
48(OCC) 0 -32188 0 0 0 0 0.622 0 -5.269
FIGURE 7 COMPARISSON OF LOADINGS FOR PIPE SUPPORTS FOR ACTION SOW A
Plant Shutdown Gas Year 2020-2021

Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm. Support No.
3(HYD) 0 -24793 0 0 0 0 0.059 0 0.109
4(OPE) 0 -27119 0 0 0 0 -33.889 0 20.977
5(OPE) 0 -33493 0 0 0 0 3.794 0 -1.915
ORIGINAL
6(SUS) 0 -32907 0 0 0 0 0.383 0 0.131
LOADS
46(OCC) 0 -40850 0 0 0 0 6.255 0 3.568
47(OCC) 0 -34183 0 0 0 0 4.326 0 2.459
48(OCC) 0 -53071 0 0 0 0 1.364 0 -5.275
SUPPORT
No. 7
3(HYD) 0 -21923 0 0 0 0 -0.055 0 0.062
4(OPE) 0 -24556 0 0 0 0 -33.111 0 21.025
5(OPE) 0 -29600 0 0 0 0 3.683 0 -1.992
NEW LOADS 6(SUS) 0 -29202 0 0 0 0 0.348 0 0.066
46(OCC) 0 -36763 0 0 0 0 6.099 0 3.66
47(OCC) 0 -30488 0 0 0 0 4.372 0 2.414
48(OCC) 0 -49363 0 0 0 0 1.322 0 -5.274

3(HYD) 108 -2908 -7 0 0 0 0 0 0


4(OPE) -3002 -17561 -21946 0 0 0 0 0 0
5(OPE) 412 -2703 1995 0 0 0 0 0 0
ORIGINAL
6(SUS) 182 -4020 -95 0 0 0 0 0 0
LOADS
46(OCC) 14921 -8151 5511 0 0 0 0 0 0
47(OCC) 11366 -5193 9288 0 0 0 0 0 0
48(OCC) 1018 -3818 661 0 0 0 0 0 0
SUPPORT
No. 8
3(HYD) -335 -6610 -96 0 0 0 0 0 0
4(OPE) -3581 -28464 -24136 0 0 0 0 0 0
5(OPE) -883 -11616 2457 0 0 0 0 0 0
NEW LOADS 6(SUS) -1065 -13138 137 0 0 0 0 0 0
46(OCC) -17034 -18912 7171 0 0 0 0 0 0
47(OCC) -12397 -14488 9725 0 0 0 0 0 0
48(OCC) -1904 -13180 978 0 0 0 0 0 0

3(HYD) 0 -7839 0 0 0 0 -0.001 0 -0.08


4(OPE) 0 -15024 0 0 0 0 -13.383 6.273 16.647
5(OPE) 0 -16763 0 0 0 0 1.308 -0.254 -1.775
ORIGINAL
6(SUS) 0 -16613 0 0 0 0 -0.002 0.311 -0.125
LOADS
46(OCC) 0 -16900 0 0 0 0 -0.035 1.326 -0.687
47(OCC) 0 -16838 0 0 0 0 -0.029 0.899 -0.571
48(OCC) 0 -16745 0 0 0 0 -0.004 0.807 -0.521
SUPPORT
No. 9
3(HYD) 0 -10263 0 0 0 0 -0.001 0 -0.042
4(OPE) 0 -15235 0 0 0 0 -13.384 6.302 16.517
5(OPE) 0 -16907 0 0 0 0 1.308 0.032 -1.8
NEW LOADS 6(SUS) 0 -16762 0 0 0 0 -0.002 0.572 -0.159
46(OCC) 0 -17034 0 0 0 0 -0.027 1.603 -0.727
47(OCC) 0 -16985 0 0 0 0 -0.023 1.223 -0.627
48(OCC) 0 -16883 0 0 0 0 -0.004 1.096 -0.558
FIGURE 8 COMPARISSON OF LOADINGS FOR PIPE SUPPORTS FOR ACTION SOW A