Professional Documents
Culture Documents
SO6465-DI-PIP-006 Rev A
PEMEX DBNR Project No.
Date 21. Nov. 2019 1 of 2
DESIGN INSTRUCTION Originator
Reviewed By
:
:
Approved By :
1. Purpose
1) General Requirement.
When loop is required more than 2 lines, loop shall be grouped and given
at same point as much as possible.
2) Steam Lines
3) Flare Lines
5) Other Line
Expansion Loops are to be provided at every 300 meters when its design
temperature is over,
- CS : 150℃
- SS : 110℃