You are on page 1of 2

Serial

SO6465-DI-PIP-006 Rev A
PEMEX DBNR Project No.
Date 21. Nov. 2019 1 of 2
DESIGN INSTRUCTION Originator
Reviewed By
:
:
Approved By :

SUBJECT : Expansion Loop design for DBNR Phase-1

1. Purpose

To provide Expansion Loop design for DBNR Phase-1.

2. The requirement of Expansion Loop

1) General Requirement.

 Loop shall not be out of module envelope.

 When loop is required more than 2 lines, loop shall be grouped and given
at same point as much as possible.

2) Steam Lines

 Expansion Loops are to be provided at every 50 meters

 Condensate recovery (drip leg) is to be provided before expansion loop.

 Expansion Loop type is to be Vertical

3) Flare Lines

 Expansion Loops are to be provided at every 100 meters.

 Expansion Loop type is to be Horizontal Type.

Std. Doc. No. : SO6465-DI-PIP-006


Serial
SO6465-DI-PIP-006 Rev A
PEMEX DBNR Project No.
Date 21. Nov. 2019 2 of 2
DESIGN INSTRUCTION Originator
Reviewed By
:
:
Approved By :

SUBJECT : Expansion Loop design for DBNR Phase-1

4) Hot Oil Lines

 Expansion Loops are to be provided at every 50 meters.

 Expansion Loop type is to be Vertical Type.

5) Other Line

 Expansion Loops are to be provided at every 300 meters when its design
temperature is over,

- CS : 150℃

- SS : 110℃

 Expansion Loop type is to be Vertical Type.

 Below calculation sheet is applicable to get loop size and quantity.

- Design Guideline for Expansion Loop Sizing_190516

- Thermal Expansion_20190516

Std. Doc. No. : SO6465-DI-PIP-006