HYDRAULIC CALCULATION OF PROPOSE BRIDGE 01

AT RD FROM 19+800 TO 19+825

CALCULATION OF SCOUR DEPTH

1 AVERAGE AREA OF ALL X-SECTIONS A 283.18 SQFT

2 WETTED PARAMETER P 101.80 FT

3 HYDRAULIC RADIUS R=A/P 2.78 FT

4 NSL UP STREAM NSL1 343.00 M

5 NSL DOWN STREAM NSL2 340.30 M

6 LENGTH OF NULLAH LENTH 472.50 M

7 SLOPE M/M S 0.00571 M/M

8 Q=A*1.486/n*R^.667*S^.5 Q 1263 CUSEC

9 VELOCITY V=Q/A 4.46 FT/SEC

10
VALUE OF MANNING "N" n 0.050

W = IS REGIME WIDTH, or unobstruced


11 width before construction of bridge W 72.18 FT

12 L = IS WIDTH UNDER THE BRIDGE L 82.03 FT

13 f =LACEYS SILT FACTOR f 4.75

14 SCOUR DEPTH.d=1.2*Q^0.63/f^.33*W^.6 d 4.95 FT

15 D1=d(W/L)^.63 d1 4.57 FT

16 THIS IS THE SCOUR DEPTH BELOW THE BRIDGE. 1.39 M

17 HIGH FLOOD LEVEL AT BRIDGE LOCATIO HFL 341.56 M

18 REDUCED LEVEL OF SCOUR 340.17 M


PROVIDING FACTOR OF SAFETY OF 2,
19 THE INVERT OF FOUNDATION IS 338.17 M

20 AREA OF FLOOD UNDER THE BRIDGE A 283.177 26.32 M

21 HIGHT OF WATER UNDER THE BRIDGE H 3.45232 1.05 M

22 GROUND LEVEL BELOW THE BRIDGE H 340.45 340.45 M

23 BOTTOM OF TRANSOM. H 342.92 342.92 M

24 FREE BOARD FROM TRANSOM H 1.41 1.41 M