KEY PLAN
15200
A A
M19
2000 5000 5000 3200
M19
200mm TRAY TO 1xPE BAR 88EP007-PE-10 200mm TRAY TO 1xPE BAR 88EP008-PE-20 E-HOUSE
F:(+) 113.000
T:(+) 111.000
LEGENDS:
B B
TS19 -A N -AA NN /X
Rack/Module ref.: (Design Code Area)
E-90°-200-R300 Location: - T: (Top) routing top of piperack
EL(+) 113.000 200mm TRAY TO 1xIE BAR 88EP013-IE-10 - L: (Low) routing along the maintenance deck
F:(+) 113.000 - 0: Inside module
E-90°-200-R300 Level: - Level 1 -- N=1
EL(+)113.012 T:(+) 111.000
4040
- Level 2 -- N=2
- Level 3 -- N=3
MV/LV-SWITCHGEAR - Roof -- N=4
200mm TRAY TO 1xPE BAR 88EP010-PE-20
ROOM Type: - C : Control
F:(+) 113.000 - LV : Low Voltage
T:(+) 111.000 - MV : Medium Voltage
TS19-ET-1-200-001 - IN : Instrument
C
PE GROUNDING Cable Ladder Sequence C
EL(+)113.012 Branch Sequence
X -XX -XXX/XXX -RXXX
E - ELBOW; T - TEE; X - CROSS; RD - REDUCER;
RI - RISER INSIDE; RO - RISER OUTSIDE
ELBOW / RISER ANGLE - 90/60/45/30
LADDER/TRAY WIDTH - 900/600/450/300/150
BENDING RADIUS - 900/750/600/300
4040
REFERENCE DRAWINGS:
D D
200mm MAIN TRAY FOR PE GROUNDING
EL(+) 113.000
T:(+) 111.000
20580
E E
(T.O.GRATING)
EL.+110.508
F:(+) 113.000
5800
T:(+) 111.000
200mm TRAY TO 1xIE BAR 88EP009-IE-10
F:(+) 113.000
200mm MAIN TRAY FOR PE GROUNDING T:(+) 111.000
EL(+)113.400
JZ3-6,3x25-E16
JZ3-6,3x25-E16 JZ3-6,3x25-E16
F:(+) 113.000 EL(+)113.647 EL(+)113.165 PROJECT: EPCIC Contract in respect of the Karish
T:(+) 110.000 TS19-ET-1-300-002 Gas Development Offshore of the State of Israel
200mm MAIN TRAY FOR PE GROUNDING
3000
E-90°-200-R300 PE GROUNDING
EL(+) 113.000 EL(+)113.248 EL(+)113.160 REQUISITION N°: 076328C-SDB-CWP5-CS-SR-3600-0001
61E-52x3,6-3ZJ
E-HOUSE
283