You are on page 1of 22

POR F

OLI
O
[ARCHITECTURE]
[2019]
Hi,I am Akash, pursuing Bachelors Of Architec-
ture, I am in my 6th semester,I love to gather ex- softwareski
ll
perience and interact with people which helps me
improve than what I am.I try to explore and exper- autocad photoshop
iment new ideas and beleive in hard work. revit indesign
sketchup premierpro
rhino lumion
+919435132898 grasshopper keyshot
zbrush MICROSOFT
a
kas
hka
rwa
98@gma
il
.c
om OFFI
CE

Mor
anha
t,
Ass
am TRAVELLI
NG PARAMETRI
C MODELLI
NG CROSSFI
T DANCE RENDERI
NG
WORKING DRAWING
3RD YEAR,5TH SEM (IN PROGRESS)
NEIGHBOURHOOD
CENTRE COMPETITION SHEETS

CONTENT PAGE

Architecture is about trying to make the world


a little more like our dreams
-Bjarke Ingels

2ND YEAR,1ST SEM 2ND YEAR.2 ND SEM


ART COLLEGE (VILLAGE DOCUMENTATION)
3RD YEAR,6 TH SEM MISCELLANEOUS WORKS
HOUSING(IN PROGRESS)
YEAR 2|STUDIO 3|2017

The aim of the project was to


design a art and photography col-
lege and to blend art with public
spaces such as exhihibition
space,museums,boutique,stores
etc.
The site is situated next to ku-
karrahalli lake along side mysore
university campus road opposite
glades cricket stadium
CONCEPT,IDEAS AND ZONING GROUND FLOOR PLAN
Auditorium parking
By using the countour blocks are ar-
ranged in certain to get maximum of Sports ground o.workshops
natural sunlight
O.A.T E.spaces

Food court workshop

STUDIOS

Ventillation and Natural lighting


SECTIONS
ideaistogetventilla-
tion from all five
sides.

SECTION AA’
VIEWS Maximum views of the
water fountain from
all the sides

SECTION BB’
SECTIONS

SECTION CC’

SECTION DD’

SECTION EE’

SECTION FF’
3rd Year STUDIO 5 2018

The aim of the design was to create a


public location where members of a
community tend to gather for group ac-
tivities,social support,public infor-
mation and other purposes.
Spacestodesignincludecommercial,of-
fices,restaurant,club house,gym and
other leisure acticities.
CONCEPT AND IDEAS PLANS
S.W

The form is a derived


in way that it can
block maximum of harsh
south west light and can
let maximum of northern
sunlight.

A-Supermarket A-Restaurant A-Commercial store


B-Food Court B-Commercil stores B-Office
Conceptual Zoning C-Office C-Office C-Playground
D-Playground D-Playground D-Gym
The arrangement of Level 1 E-Bank,post office Level 2 E-Club house Level 3 E-Auditorium
block is done according F-Parking F-Parking F-Parking
to the main node where
three roads intersect
which acts as a pause
point for everyone and
can advertise the com-
mercial blocks.

Continuity
Creatingasenseofcon-
tinuity tll the end of
the block from the road
SECTION AA’

SECTION BB’

SECTION CC’
The main objective of the
design is to create a resideni-
YEAR 3 STUDIO 6 2019 al complex with the requirement
of 50 2bhk,24 3bhk,20 1 bhk and
6 dupex house with amenities
like swimming pool, club house
etc.
INTRODUCTION CONCEPT AND SKETCHES PLANNING OF CLUSTER
The proposed site is8.5 km away from the city cen-
tre.The site is located at hebbal.It has an area
of 2.08 acres.A service road of 5 M and a ring
riad of 30M width are present along the east direc-
tion to he site.

CONNECTIVITY SURROUNDING CNTEXT


Design of concetual sketches in sucha way that it acco-
modates maximum sulight and ventillation

Design of cluster in such a way that ig allows


SITE STUDY AND SUN PATH DIAGRAM maximber number of courtyards arrangement.
WIMD PATH DIAGRAM
ZONING AND MASSING IDEAS

PLANNING FOR BASEMENT PARKING


2 BHK UNIT TYPOLOGY BASEMENT PARKING CONCEPTUAL SECTION TILL SIX FLOORS

AREA PROGRAMMING
1.Living room 5.Utility area
2.Dining room 6.Bedrooms
3.Toilet 7.Balconies
4.kitchen 8.Common washroom

1 BHK UNIT TYPOLOGY MASTER PLANNING CONCEPTUAL VIEW TILL SIX FLOORS

AREA PROGRAMMING
1.Living room 5.Utility area
2.Dining room 6.Bedroom
3.Toilet 7.Balcony
4.kitchen
[ongoing project]
doordetai
ls

ng

wi
ndow detai
ls
ng drawi

secti
on aa’
foundati
on detai
l centreli
nefirstfloorplan centreli
nesecond floorplan
STAI
RCASEDETAI
LS
worki

NON SLI
PINSERT MONO STRI
NGER
wall
COMPOSI
TETREAD 1stfloorlevel
concrete recessed and
plastered overto conceal A hand rai
l
connecti on
glassrai
ling

wooden tread
W ELDS

steelstri
nger

m12chemi
calanchors

balustrade
10mm connecti
on plate
landi
ng
B
TREAD TO STRI
NGER CONNECTI
ON
landi
ng to wallconnecti
on

ground level

DETAI
LA DETAI
LB SECTION

wall

landi
ng
1stfloorlevel

tread
hand rai
l

balustrade

tread
balustrade

8mm gusset
glassrai
ling
C

tread
m10 epoxy glues i
nto
ti
mbertreads

balustradeto tread connecti


on plan of tread to balustrade
ground floorlevel
connection

electri
calplan level1 electri
calplan level2 terracefloorplan secti
on bb’ BALUSTRADE DETAILS PLAN
This dwelling is more than 100 years old and is occu-
pied by Tirumal deva raya and his family.
This dwelling was originally used as an administrative
centre.The structure was considerably altered during
1960’s so that unlike other palaces the rooms have
little symmetry.
In the past,after entering hrough the main gate visi-
tors would have proceeded to the public office in the
west.The secretary and cashier worked here,the state re-
cord,archieves and stationary were kept in a store room
at the back.
HATROPHY
GRI
competi
tion s
heets
HUDCO TROPHY
DESIGN TROPHY
zonal nasa convention (2018-19
|
MISCELLANEOUS WORKS

PHOTOGRAPHY
FIRST AND SECOND YEAR STUDIO THIRD YEAR STUDIO
WORKS WORKS

|
|

You might also like