Professional Documents
Culture Documents
OLI
O
[ARCHITECTURE]
[2019]
Hi,I am Akash, pursuing Bachelors Of Architec-
ture, I am in my 6th semester,I love to gather ex- softwareski
ll
perience and interact with people which helps me
improve than what I am.I try to explore and exper- autocad photoshop
iment new ideas and beleive in hard work. revit indesign
sketchup premierpro
rhino lumion
+919435132898 grasshopper keyshot
zbrush MICROSOFT
a
kas
hka
rwa
98@gma
il
.c
om OFFI
CE
Mor
anha
t,
Ass
am TRAVELLI
NG PARAMETRI
C MODELLI
NG CROSSFI
T DANCE RENDERI
NG
WORKING DRAWING
3RD YEAR,5TH SEM (IN PROGRESS)
NEIGHBOURHOOD
CENTRE COMPETITION SHEETS
CONTENT PAGE
STUDIOS
SECTION AA’
VIEWS Maximum views of the
water fountain from
all the sides
SECTION BB’
SECTIONS
SECTION CC’
SECTION DD’
SECTION EE’
SECTION FF’
3rd Year STUDIO 5 2018
Continuity
Creatingasenseofcon-
tinuity tll the end of
the block from the road
SECTION AA’
SECTION BB’
SECTION CC’
The main objective of the
design is to create a resideni-
YEAR 3 STUDIO 6 2019 al complex with the requirement
of 50 2bhk,24 3bhk,20 1 bhk and
6 dupex house with amenities
like swimming pool, club house
etc.
INTRODUCTION CONCEPT AND SKETCHES PLANNING OF CLUSTER
The proposed site is8.5 km away from the city cen-
tre.The site is located at hebbal.It has an area
of 2.08 acres.A service road of 5 M and a ring
riad of 30M width are present along the east direc-
tion to he site.
AREA PROGRAMMING
1.Living room 5.Utility area
2.Dining room 6.Bedrooms
3.Toilet 7.Balconies
4.kitchen 8.Common washroom
1 BHK UNIT TYPOLOGY MASTER PLANNING CONCEPTUAL VIEW TILL SIX FLOORS
AREA PROGRAMMING
1.Living room 5.Utility area
2.Dining room 6.Bedroom
3.Toilet 7.Balcony
4.kitchen
[ongoing project]
doordetai
ls
ng
wi
ndow detai
ls
ng drawi
secti
on aa’
foundati
on detai
l centreli
nefirstfloorplan centreli
nesecond floorplan
STAI
RCASEDETAI
LS
worki
NON SLI
PINSERT MONO STRI
NGER
wall
COMPOSI
TETREAD 1stfloorlevel
concrete recessed and
plastered overto conceal A hand rai
l
connecti on
glassrai
ling
wooden tread
W ELDS
steelstri
nger
m12chemi
calanchors
balustrade
10mm connecti
on plate
landi
ng
B
TREAD TO STRI
NGER CONNECTI
ON
landi
ng to wallconnecti
on
ground level
DETAI
LA DETAI
LB SECTION
wall
landi
ng
1stfloorlevel
tread
hand rai
l
balustrade
tread
balustrade
8mm gusset
glassrai
ling
C
tread
m10 epoxy glues i
nto
ti
mbertreads
electri
calplan level1 electri
calplan level2 terracefloorplan secti
on bb’ BALUSTRADE DETAILS PLAN
This dwelling is more than 100 years old and is occu-
pied by Tirumal deva raya and his family.
This dwelling was originally used as an administrative
centre.The structure was considerably altered during
1960’s so that unlike other palaces the rooms have
little symmetry.
In the past,after entering hrough the main gate visi-
tors would have proceeded to the public office in the
west.The secretary and cashier worked here,the state re-
cord,archieves and stationary were kept in a store room
at the back.
HATROPHY
GRI
competi
tion s
heets
HUDCO TROPHY
DESIGN TROPHY
zonal nasa convention (2018-19
|
MISCELLANEOUS WORKS
PHOTOGRAPHY
FIRST AND SECOND YEAR STUDIO THIRD YEAR STUDIO
WORKS WORKS
|
|