You are on page 1of 4

ព្រះរាជាណាចក្រកម្ពុជា

ជាតិ សាសនា ព្រះមហាក្សត្រ


rrjss
ក្រុមហ៊ន
ុ ឋានុត្តម អេឡិកទ្រីក (ខេមបូឌា) ឯ.ក
Add: #685D, Phum Boeung Salang,Sangkat Reussey Keo, Khan Reusey Keo, Phnom Penh
Telephone: +855(0) 93 500 078/ +855(0)15 95 92 97/+855(0) 87 57 21 22, Email: trorkal@gmail.com

គម្រោង​៖ ផ្ឝត់ផ្គង់សម្ភា រះអគ្ឝិសនី​និងតមើ្លងត្រង់សូ រ្វ ​1600KVA x 1pcs

ទីតាំងតមើ្លង​៖ ( PTT( 1600KVA)ភូមិព្រែកបង្កង ឃុព្រែ


ំ កតាកូវ ស្រុកខ្សាច់កណ្តា ល ខេត្តកណ្តា ល )
អតិថជន :
Quotation
Price(USD)
N ITEMS Unit Q-Ty
U-Price Total

Materials Supply by EDC


1 Electronic Meter3x5,LV,(Landis+Gyt/Actaris pcs 2 $ 660.00 $ 1,320.00
2 CT,MV ,20/5A 04KV50Hz(outdoor)Brand ThaiMaxwell pcs 3 $ 1,270.00 $ 3,810.00
3 VT,MV ,110/3V/ 0.4KV50Hz(outdoor)Brand ThaiMaxwell pcs 3 $ 870.00 $ 2,610.00
4 Meter Box (Rectangle One Window) pcs 2 $ 100.00 $ 200.00
A TOTAL+A $ 7,940.00
5 Sub Station (4m x4m x 4,50Cm) pcs 1
6 Transformer 1600kVA,22/0.4kV,03phase,50Hz( Indoor) set 1 $ 30,300.00 $ 30,300.00
7 Capacitor Bank 315kVAR pcs 800 $ 11.00 $ 8,800.00
8 ( RMU IBD, 24KV) 2 Feeder+1Transformer set 1 $ 18,200.00 $ 18,200.00
9 Support of CT.VT ,Bolt whit nut set 1 $ 200.00 $ 200.00
10 Support of BE,Bolt whit nut set 1 $ 80.00 $ 80.00
11 ATS 3200A (3ph) LV panalle set 1 $ 8,740.00 $ 8,740.00
12 LVDB 3200A 3phase/50H,LV set 1 $ 6,200.00 $ 6,200.00
13 Concrete Pole MV-12m,9kN pcs 2 $ 800.00 $ 1,600.00
14 BE MV (24KV) set 1 $ 1,200.00 $ 1,200.00
15 Blug In MV Conector 3 x240mm(24KV) set 1 $ 640.00 $ 640.00
16 Blug In MV Conector 3 x70mm(24KV) set 2 $ 560.00 $ 1,120.00
17 Pin Post Insulator (24kV) pcs 6 $ 15.00 $ 90.00
18 Preformed tie for Pin Post insulator for cable, 150mm² Pcs 6 $ 3.00 $ 18.00
19 Cross Arm 2.2m Pcs 2 $ 30.00 $ 60.00
20 Cross Arm 3m for Support LA& FCO pcs 2 $ 50.00 $ 100.00
21 Fuse Cut Out 24kV set 3 $ 60.00 $ 180.00
22 Fuse Link 50A for FCO, 24kV pcs 3 $ 8.00 $ 24.00
23 Lightning Arrester, 10kA, 24kV set 3 $ 65.00 $ 195.00
24 PG Clamp AL :70mm²-70mm² pcs 6 $ 8.00 $ 48.00
25 Cable MV (1Cx70mm²), AAAC,AL m 20 $ 9.00 $ 180.00
26 Cable MV U/G 3x240mm² m 60 $ 38.00 $ 2,280.00
27 Cable MV U/G 3x70mm² m 15 $ 38.00 $ 570.00
28 Cable Cu 1x240mm² m 1035 $ 25.00 $ 25,875.00
29 Cable Cu 1x2.5mm² (Red,Blu,Yeiiow,Blak) m 4 $ 8.00 $ 32.00
30 Insulated Cable AL 70mm²,LV for Earthing m 30 $ 6.00 $ 180.00
31 Insulated Cable Cu 70mm²,LV for Earthing m 60 $ 5.00 $ 300.00
32 Cable Trey m 15 $ 25.00 $ 375.00
33 Cable Tie 9:00mm pcs 5 $ 3.00 $ 15.00
34 Tep MV (24KV) pcs 3 $ 15.00 $ 45.00
35 Insulated Cable Cu 4x2.5mm² m 30 $ 8.00 $ 240.00
36 Insulated Cable Cu 1x6mm m 20 $ 4.00 $ 80.00
37 Stainless Steel Strape, 20x0.7mm (50m/roll) pcs 1 $ 50.00 $ 50.00
អតិថជន :
Quotation
38 PVC Pipe Ø27 x 4000, thickness 5 pcs 10 $ 7.00 $ 70.00
39 PVC Pipe Ø120 x 4000, thickness 5 pcs 1 $ 35.00 $ 35.00
40 BimetalTerminal Lug, Al 70mm² pcs 35 $ 4.50 $ 157.50
41 Terminal Lug Cu 70mm² pcs 30 $ 3.50 $ 105.00
42 Terminal Lug Cu 240mm² pcs 120 $ 2.50 $ 300.00
43 Bimetal Splice Al/Cu 70-70mm² pcs 15 $ 3.00 $ 45.00
44 Earthing rod Ø=16mm,L=1800 pcs 25 $ 6.00 $ 150.00
45 Earthing Clamp for rod Ø=16mm pcs 25 $ 3.00 $ 75.00
46 Earthing Coupling Unit for rod Ø=16mm m 20 $ 3.00 $ 60.00
TOTAL+B $ 109,014.50
B
Installation Fee
1 Install CT.VT MV (24KV) set 1 $ 350.00 $ 350.00
2 Install concrete Pole 12m pcs 2 $ 200.00 $ 400.00
3 Install Grounding System set 1 $ 140.00 $ 140.00
4 Install Capacitor Bank (800KVA) set 1 $ 300.00 $ 300.00
5 Install Lightning arresster & Fuse Cut Out set 3 $ 60.00 $ 180.00
6 Install Cable MV U/G 3x240mm m 60 $ 15.00 $ 900.00
7 Install ATS 3200A set 1 $ 230.00 $ 230.00
8 Install LVDB 3200A set 1 $ 210.00 $ 210.00
9 Install Meter Box Electronic set 1 $ 180.00 $ 180.00
10 Testing & Commissioning (EDC) set 1 $ 3,000.00 $ 3,000.00
11 Install RMU IBD, 24KV 2 Feeder set 1 $ 400.00 $ 400.00
12 Install Transfomer (1600KVA) set 1 $ 500.00 $ 500.00
TOTAL+C $ 6,790.00
C
TOTAL+A+B+C $ 123,744.50
General terms & Conditions :
- Installation : អតិថជន : Approved By:
Payment term :
- 50% during sign the contract and before start installation
- 30% Accessories insite. SIV NAKRY
- 20% after complete installation and before power On. 10/25/2018
Warrenty term :
- 12 months from the day putting them in operation.
ជាណាចក្រកម្ពុជា
សនា ព្រះមហាក្សត្រ
rrjss
អេឡិកទ្រីក (ខេមបូឌា) ឯ.ក
t Reussey Keo, Khan Reusey Keo, Phnom Penh
95 92 97/+855(0) 87 57 21 22, Email: trorkal@gmail.com

សនី​និងតមើ្លងត្រង់សូ រ្វ ​1600KVA x 1pcs

បង្កង ឃុព្រែ
ំ កតាកូវ ស្រុកខ្សាច់កណ្តា ល ខេត្តកណ្តា ល )

Quotation
Remark

upply by EDC

Install by Owner
Suljee
EDC
Schneider

EDC
EDC
Quotation

stallation Fee

You might also like