Decision variables TypeA

Type of trucks
no of trucks to be rented 50
Rent 30

Constraints
Refrigerated Capacity(m3) 20
Non Refrigerated Capacity (m3) 40
Non Negativity Constraint
Type B Total Rent
4166.66666667
67
40

Total Availability has to be… Required


30 3000 >= 3000
30 4000 >= 4000
Decision variables
Type of trucks TypeA
no of trucks to be rented 50
Rent 30

Constraints
Refrigerated Capacity(m3) 20
Non Refrigerated Capacity (m3) 40
Non Negativity Constraint
Total Rent
Type B 4166.66666667
67
40

Total Availability has to be… Required


30 3000 >= 3000
30 4000 >= 4000
convenience standard

no of stores 2 9
cost(m) 1.2 2

Constraints

Construction capital(m) 4.125 8.25


no of emplyees 3 15

Store count 1 1
expanded services revenue
20.4
0 11
2.6

total availability <= required


12.375 82.5 82.5 m
45 141 300 e