Activites Date Time

guide line of project and gantt chart prepration 14-Jan 3


Chose title of project 17-Jan 4
making process flow diagram prepration and industrial visit 21-Jan 3
Start the introduction of report 24-Jan 4
collection of literature and material balance 28-Jan 3
Mid term prepation 31-Jan 7
mid exam 7-Feb 7
energy balance and process description prepration 14-Feb 7
design of equipment 21-Feb 7
prepration of energy balance and design report 28-Feb 7
health and safety prepration in report 7-Mar 7
prepration of conclustion and refernces 14-Mar 7
prepration of front pages in book 21-Mar 7
final project prepration 28-Mar 7

43479.00 Gantt Chart


43479 43489 43499 43509 43519 435
guide line of project and gantt chart prepration
Chose title of project
making process flow diagram prepration and industrial visit
Start the introduction of report
collection of literature and material balance
Mid term prepation
mid exam
energy balance and process description prepration
design of equipment
prepration of energy balance and design report
health and safety prepration in report
prepration of conclustion and refernces
prepration of front pages in book
final project prepration
Gantt Chart