Today we officially started our OJT. First, we been oriented about the company
rules like respecting the staff’s, which I believe should always be observed by us, and
specially our attitudes towards other people in the workplace. We were also told to wear
our departmental or OJT uniforms and ID’s as much as possible for them to easily
identify us. After the orientation, the engineers were introduced to us namely, Engr.
Rolex Pimentel and Engr. Neil Anthony Sevilleja. Also, they have introduced Sir James,
he is the Mechanical Support. The first tasked they gave to us is to read the blueprint of
Electro Mechanic Chart, the Schematic Diagram of all the Machineries in Baligatan
Hydroelectric Power and the papers of Oil Pressure Equipment and Fire Protection
System which I enjoyed reading. After that at around 3PM they also toured us in
Baligatan Hydroelectric Power Plant and they taught us the uses and functions of the
tools and machineries that are present in there. I believed that it is very important for us
to be attentive with knowledge shared to us for this will help and contribute in widening
our knowledge.
This is our second day of training, which we started at early morning around
7:45AM because we had a meeting headed by Engr. Neil in the conference room with
all the staffs of EMS Group and after a while, we introduced our self to all the staff’s.
After the meeting, Engr. Rolex gave again the Power Plant Manual’s and I read the
Governor and Unit Automation, at first I was intimidated with the pictures because I am
not an Electronics Engineer yet so I was clueless about it, however thanks to Engr.
Rolex who showed us the upgraded equipment’s namely the new Governor Machines,
they showed us too the old Governor Machines and the Guard Gate 1 and Guard Gate
2. There are many significant differences between the two Governors machines like the
size and how it is operated, needless to say I believe that I prefer the new one since it is
much easier and efficient to use though of course they have the same use and function.
I believe again this will help and contribute in widening our knowledge.
We had our meeting again at 7:45AM headed by Engr. Rolex, we were reminded
that they always conduct a meeting every morning for the discussion and distribution of
the tasks today. After the meeting again, Engr. Rolex gave again the Power Plant
Manual’s and I read the Turbine Specifications and Turbine Installations, I watched
some videos to make me easily understand how it works in a dam and the turbine.
Suddenly, in the afternoon I was shocked and a little bit nervous because Engr. Francis
Francisco entered the room and greeted us, he told his story in life on why he became a
successful Professional Engineer and after that we introduced our self to him with our
name, age, address, and why I choose BSECE and my expectation’s as trainee in NIA.
After a while, he taught us how to understand and read the schematic diagram, sad to
say that I was not able to understand what he explained, but hoping to understand it
later on and I believed again this will help and contribute to widening our knowledge.
Today, Engr. Francis Francisco conducted a meeting to all his staff and asked for
an update of their projects, After the meeting, Engr. Francis told us that Engr. Rolex will
be handling us because they have an appointment together with Engr. Neil, that’s why
we read their manuals again. Around 10AM, Engr. Rolex said we were going to
Baligatan Hydroelectric Power Plant ordered by Engr. Francis to asked their operators,
we asked first the Electrical Operator Marlon Mangahas to help us in the schematic
diagram or a blueprint of unit automation but sad to say that it’s a bit messy to
understand. At around 3PM Sir Jatur Bacani a Plant Electrician and Sir Ellioterio Dela
Cruz a Registered Master Electrician came at the control room and thanks to Sir Zatur
because he helps us to understand the blueprint of automation, and Sir Ellioterio told us
how the generatos works on the Baligantan Dam. Thanks to the three Operators there
because I gained a little bit of knowledge in Hydroelectric Power Plant. I believe this will
Today, around 7:45AM we had a meeting again headed by our OIC: Engr. Erwin
Remocal and asked the staff’s one by one for an update on their projects. After the
meeting Engr. Francis talked again about our reading of the blueprint and asked if we
can analyze that, we said, “not yet” because it’s so confusing, then he reminded us that
our presentation will be on march 15, 2019. Then after that, around 9AM Engr. Rolex
entered the room and talked about the history of the switchyard then he presented a
chart of the switchyard and we came to understand a little bit. In the afternoon, after
lunch break around 1PM we read again all the blueprint, operation and maintenance of
the system, the chart of all the machineries until five o’clock, and I believe again this will
On this day, we had a meeting in the conference room around 8:00AM headed
by our OIC: Engr. Erwin Remocal and asked their staff’s one by one again for an update
on their projects in the MARIIS dam, while the other is in Baligatan Hydroelectric Power
Plant because Engr. Erwin said they have a visitor from SN Aboitiz that will visit the
Baligatan Dam. After the meeting, Engr. Francis talked again about our presentation.
He said that we can go in the Baligatan Hydroelectric Power Plant tomorrow to asked
again their operators since we can’t go today because they have visitors there in the
Baligatan, he taught us how to understand again the blueprint, the chart, the automation
of generators on how can we shut down and turn on, and how to control the
hydroelectric power plant safely. After he taught us about that, he left us again in the
conference room and we read again the chart, we studied the block diagram of the
automation on how to close and how to open, we search in the internet, I watched a
video about how dam works so that i can understand a little bit. We studied until at five
o’clock in the afternoon. I believe this will help and contribute to widening our
knowledge.
March 1, 2019
Around 7:45AM, we had a meeting again at the conference room headed by OIC:
Engr. Erwin Remocal and asked for an update of their staff’s, he said that there is a new
routine to make an attendance and a group photo every day. After the meeting, we
talked to Engr. Francis about our presentation. Then we went to Baligatan Hydroelectric
Power Plant around 9AM. We rode on a huge vehicle, then we stop for a while at the
market to buy a food for our lunch and then we proceeded immediately to Baligatan
there and they gave us ideas on what to do. Thereafter, we studied what we need to do
on our presentation and we did our best. We went to the location of machineries from
elevation 158 to elevation 150. We took pictures each one of them and put its
corresponding explanations. I believe this will help and contribute to widening our
knowledge.
March 4, 2019
On this day, we had a flag ceremony around 7:45AM. Thereafter, they had an
announcement headed by Ma’am Olive and the other staff about their bills. After the
announcement we went to EMS building because we had a meeting with their EMS
staffs headed by Engr. Erwin Remocal our OIC Engineer. After the meeting in EMS
Plant to check with their Operating Maintenance which is in charge in the dam. After we
entered in the operating room, we met Sir Elliot Dela Cruz, RME and we asked him
about the sequences of automations, the schematic diagram, and the block diagram of
how the automation works. He taught us all about the automations, he oriented us and
we went to elevation 154 and 150. He discussed the butterfly valve on how it works, the
cooling water system, the generator and the shaft, all the electrical, mechanical and
electronics machineries there and many more, He teaches us until 3PM. After that,
there were two operators who shared their knowledge about mechanical and electrical
operations. I believe this will help and contribute to widening our knowledge.
March 5, 2019
This day, we had a meeting at 7:45am in the conference room headed by Engr.
Erwin Remocal He talked about the update with their staff’s, and of course he greeted
us about our presentations to Engr. Francis. After the meeting, at around 8:15AM Engr.
cannot come. Thereafter, we studied again the flow of automations, the schematic
diagram of Butterfly valve and the flow of water from the reservoir through the penstock
how can make a hyperlink until 12 in the afternoon. Around 1PM after we ate lunch,
schematic diagram and the sequences. Thereafter, we continued again the PowerPoint
presentation. I wrote the important things in the Blueprint and studied until 5pm and I
March 6, 2019
Today, we had our meeting again with the staff’s around 7:45AM headed by OIC
Engr. Erwin Remocal and talked about their works and projects. Suddenly, Engr. Rolex
and Engr. Francis talked again about our presentations after the meeting. Thereafter,
we suggested to Engr. Francis that we should be separated, our two classmates stayed
in the conference room to read and studied the manuals and the schematic diagram of
automations then the three of us went to Baligatan Hydroelectric Power Plant to asked
and communicate to their Operators. We also made our presentations in the Baligatan
Dam. Thanks to the operator there because he said the sequences of automations and
the flow of the Dam, then he talked about the wicket gate of the turbine, the guide vane,
the spiral case and the turbine blades. In the afternoon, we continued making our
presentations again until 3PM. Then we go back to the conference room to meet our
two classmates who are reading manuals. We continued again what we are doing in the
room until at 5PM. I believed this will help and contribute to widening our knowledge.
March 7, 2019
Francisco, PECE, he talked about the projects and works of their staffs. He said to as
soon as possible they finish the projects on March 20, 2019 because that day they have
a deep maintenance in the Power Plant. After the meeting, Engr. Francis talked to us
about our presentation and he checked our PowerPoint, he commented that our power
point Presentation was okay but we need to present it perfectly. Thereafter, he tought
us about Electronics subject and Communication subjects. After that, he gave us advice
abroad. Around 10AM we read again the unit of automation, we studied the schematic
diagram and continued the power point presentation. In the afternoon, we went to
Baligatan Dam to take some pictures on the relays, the governor machines and all the
switchgear. We asked some help from their Operators to guide us and after that we
went back again in the conference room to continue our power point presentation until
5PM and I believed this will help and contribute to widening our knowledge.
March 8, 2019
In the morning, around 7:50AM they had a meeting again with their staffs headed
by Engr. Francis Francisco and we were there to listen first. They talked about again the
projects and works of their staffs, they favored a cleaning material and etc., and we took
attendance in the meeting. Thereafter, Engr. Francis talked again about our
presentation if were finish, and then we asked him of what we did not understand in the
schematic diagram and the sequences of start and shutdown of the power plant. After
that, he tought us again about the governing system and its relationship with the turbine
and generator, same as the Easy Gen Controller and he said lately that Easy Gen
Controller have relationship with the switchyard and it’s controlling the Voltages and the
frequency output. It balances also the voltages and frequencies of the Switchyard
output and the generator output. After the discussions, we continued again making the
power point presentation until 11:30AM. After we ate lunch we went to the boarding
house of our schoolmates and we went back in the office after 1 hour. Then we
continued making our presentations until 5PM and we attended also the flag Retreat of
NIA – MARIIS.
This Monday at around 7:45AM we attended the flag ceremony, after the flag
ceremony, Ma’am Olive had an announcement about their work. Thereafter, we went to
EMS building to attend a meeting headed by OIC: Engr. Erwin Remocal, there they
talked about the activities to be done by employees because the Hydroelectric Power
Plant (DAM) is in Shutdown Mode, and they are so very busy about the maintenance of
DAM. After the meeting we continued again making out the power point presentation.
did it until 11:30AM. After lunch, we continued again making our presentation. We
planned to finish it today but unfortunately, we didn’t make it because we’re running out
of time.
Today at around 7:45AM, they said we have meeting every day in the morning
We attended a meeting headed by OIC: Engr. Erwin Remocal, they talked about
the operation and maintenance of Baligatan Dam. Engr. Erwin talked to the operators
and Engineers in the Baligatan Dam, he instructed them on what they need to do in the
Dam. After the meeting, we requested asked to Engr. Francis to allow us to go back to
the dam to take some pictures of those machineries that we don’t have a copy yet. We
went to Baligatan Dam at 9AM to interview some of the operators there. We observed
them also on how they maintain the dam. Thereafter, we went back to the office to
continued our power point presentation and then we took our lunch. After it, we went to
the office to finish our presentation. We finished the power point Presentation around
2PM. Then, we reviewed our presentation if its complete already. I believed this will help
On this day around 8:00AM, we attended a meeting again headed by OIC: Engr.
Erwin Remocal and they talked about the operation and maintenance of Baligatan Dam.
Sir Erwin and his co – Engineers instructed the employees on what they need to do in
the Power Plant. After the meeting, we requested again to Engr. Francis to allow us to
go back to the Baligatan Dam to take some uncleared picture of those electronic and
mechanic machines that we don’t have a copy yet. We went to baligatan dam after the
meeting around 9AM to interview again some operators like Sir Arnel one of the
Electrician Operators there in the Dam. We observed them also on how they upgrade
the Control Room, they changed the LED’s of the Control Desk there, they checked also
the wirings of the relay’s and many more. Then, we went back to the office to continue
our presentation and take our lunch already. After we took our lunch, we went to the
office to check our presentations and to review at the same time until its 5PM.
We attended a meeting around 8:00AM in the office headed by the OIC: Engr.
Erwin Remocal and they talked about the Operation of Baligatan Hydro Power Plant
and the Spill Way with the Employees and the Engineers. The employees asked to buy
some cleaning materials and also the Protective Equipments. After the meeting, we
asked to Sir Francis to let us stay in the office to review our presentations. We asked
him on what need to do in our presentations and what time will present our presentation
tomorrow. Then, he explained with us what is in the block diagram like the Reversal
Field Discharge, the Transient Feedback time relay, the IJ1, K89, the Governor
Hydroelectric PLC’s, the Excitation Panel and many more until 11:30AM.
After lunch around 1PM, we continued again the Presentations to reviewed all
the slides in the power point. We did that until its 5:00PM.
Today, we attended the meeting around 8:00 as usual in the office or conference
room headed by OIC: Engr. Erwin Remocal. They talked about the works and projects
again of their employees and we took attendance and a groufie picture. After the
meeting we reviewed the power point presentation and we practiced to discuss in front
We did this until 11:30AM and took a lunch break. In the afternoon around 1PM, we
reviewed the power point. We read it every blocks of the sequences diagram.
Thereafter, around 1:30PM, Engr. Erwin, Engr. Neil, Engr. Francis, Engr. Jasper and
Engr. Rolex entered the room since they have a serious meeting about SWOT activity
until 3PM. After their meeting, we started the presentation at 3:15PM and Engr. Francis
called the judges for our presentation, Sir Rolex and Sir Jasper. Then, we presented our
presentation but we failed because Sir Francis was too strict with the words and
grammar. The questions were very difficult but at the same time they taught us how to
present properly our presentation. After which, around 4:50PM we went to the main
office of NIA to talked Sir Archie to ask for Daily Time Record.
On this day, we started at 7:45AM in the main office of NIA to attend a flag
ceremony and Ma’am Olive announced an activity for this week. After that, we went to
the EMS building to attend a toolbox meeting together with the Engineers and
employees headed by OIC: Engr. Erwin Remocal and they talked about the works and
projects of the employees. After the meeting, around 8:30AM, we re-studied again our
take a picture of Solenoid Air Valve and the four Switches of the Generator then our 2
classmates and I we continued our presentation in the office. We re-edit per slides and
changed the hyperlink of some words there. After a while our 2 classmates that went to
Baligatan Dam came. Before its 11AM we took our lunch. In the afternoon, around 1PM
we continued again the presentations, we finished it 5PM. I believed that this will help
This day, we attended a toolbox meeting again at 7:45AM headed by OIC: Engr.
Erwin Remocal and talked about the activities of the employees this day. After the
meeting, we continued again the power point presentation to finish the Normal
Shutdown Sequence. We Edited the schematic diagram of the Relays in the sequences
and we deleted some sentences in the hyperlink of the presentation we did this until
11:30 and took our lunch. In the afternoon around 1PM we continued the power point
presentation to reviewed the sentences to be discuss tomorrow and we are not ready
yet to present our presentation tomorrow because we haven’t understood a little bit the
automation because it’s really hard to understand but we didn’t give up because I
believed that this will help and contribute again to widening our knowledge.
This day, we attended a toolbox meeting again at 7:45AM in the morning headed
by OIC: Engr. Erwin Remocal and talked about the clearances and the deadlines for
their requirements to be passed to Ma’am Julie their secretary in the EMS building. After
the meeting, we reviewed our final presentation to Sir Francis. After a while around
10:30AM Sir Jasper entered the room to talked to us if we are ready for the presentation
today and we asked him at the same time if he knew the 1DK, 2DK and the 3DK valve
in the power plant then he gave us a hint so we went to Baligatan Power Plant around
11:00AM to locate or search about that valve. Thanks to Sir Arnel because he helps us
find the valve and finally, we found the 3 DK’s valve at Elevation 158 in the Power Plant.
Around 11:30AM we went back in the office to take a lunch and in the afternoon, we
continued reviewing the power point presentation because 3PM is the time of our final
presentation to be judged by Sir Francis, Sir Jasper and Sir Rolex. Then, we prepared
ourselves to present the presentations. In the 1 st slide, they talked about the K401 relay
and luckily it was successful, then next is they talked about K410 and K430 relays, but
the questions are really hard to answer and we failed again for the second time. But it’s
okay to us because we believe that this will help and contribute to widening our
presentations.
OIC: Erwin Remocal and talked about the works and activities of their employees in
Baligatan Dam and in the Spillway, at the same time we took attendance and a group
picture inside the meeting. After that, we studied the schematic diagram of the
turbine/automation around 9:00AM and edited again our presentations. We added the
change contact switch in the relay K401, K430 and K41 that base in the schematic
diagram that we studied a while ago. Then, we took our lunch and in the afternoon
around 1PM we continued again our power point presentation and study every slide.
around 8:00AM headed by the OIC: Engr. Erwin Remocal together with their
employees. They talked about their activities on this Friday and at the same time we
took attendance again. After the meeting, we tried to understand again the schematic
diagram of the turbine automation and the relays, we did that until 11:30 and had our
lunch. In the afternoon, we continued again the power point presentation to edit/rewrite
what’s wrong with the explanation and meanings. We did that until its 5:45PM and then
Around 7:45AM we attended flag ceremony together with the staffs and
Ramos announced their activities and asked for their requirements this week. After the
meeting we went to EMS building to attend a toolbox meeting headed by OIC: Engr.
Erwin Remocal and talked about their needs, works and projects of their employees.
After the meeting, we reviewed again our power point presentation to be presented on
Wednesday, we studied again block by block and we read again their hyperlink
meanings and explanations. We did that until its 11:30AM and had our lunch. In the
afternoon, we went back in the office to continue again what we were doing this day and
we bought some snacks around 3PM to refresh our mind at the same time, then we did
7:45AM headed by OIC: Engr. Erwin Remocal and asked the employees with their
reports every day, at the same time they talked about their works and projects this day.
After the meeting, Engr. Francis entered the room to asked our presentations if it’s done
and then, we continued reading the schematic diagram of the automation and studied at
the same time. We reviewed again the relay’s on how it works in the automation and we
did that until 11:30 and took our lunch. In the afternoon, we went back in the office to
continue reading the presentations that will be presented tomorrow and after a while
around 3pm ma’am Julie entered the room and gave snacks. Thanks to Ma’am Julie.
Engr. Erwin Remocal and talked about the works and projects of their employees today,
Engr. Erwin asked them what they need, the tools and equipment that they need to use
today and at the same time we took the attendance in our meeting. Thereafter, we
continued again the power point presentation to be presented today around 3PM in the
afternoon. We studied again the schematic diagram of the automation that we cannot
understand yet and we did that until 11:30AM. After we took our lunch, we continue
again what we were doing and we prepared ourselves for the presentation later. Around
3PM Engr. Francis entered the room to start our presentation then after discussing the
presentation, the two judges Engr. Rolex and Engr. Jasper entered the room to listen to
the discussion. After we finished the presentation, we failed again but its okay because
they taught us again and at the same time, we learned for them especially from Sir
Francis.
headed by OIC: Engr. Erwin Remocal together with their staffs and employees. They
talked about their works and projects today and they requested cleaning materials to
again the schematic diagram of automations of the turbine, we watched how the dam
works, the maintenance of dam, who is k401 relay, k430, k410, k89, and many more. I
hoped we understand the relays and the solenoid valve on how it is working and what is
their relationship to the generator. We did that until 11:30 and we took our lunch. In the
afternoon, we continued again what we were doing lately. We read and studied again
the schematic diagram of automations and analyze it clearly but we can’t understand
because it is so difficult and Thanks to Sir Rolex because he helped us again and
motivated us to be strong all the time and we did that until 5:00. We attended the flag
retreat.
April 1, 2019
First, we attended the flag ceremony in front of NIA main office around 8:00AM in
the morning and thereafter, Ma’am Olive introduced the Immersion Student came from
JET Montessori School and after that they announced the important matters to for their
employees and staffs. After the flag ceremony and their announcement, we moved to
EMS building for the toolbox meeting together with their staffs and employees headed
by OIC: Engr. Erwin Remocal and they talked about their works and projects in
Baligatan Dam and Mariis Dam, they requested again for a tools and cleaning materials
today and many more. After the meeting, we continued again the power point
presentation and we studied again the flow of automation and their controls. We did that
until 11:30 and took our lunch. In the afternoon, we continued again the power point
presentation and after a while Ma’am Julie entered the room to give some Snacks like
Pancit Bihon and Lumpia and then, we continued again the presentation to be
April 2, 2019
room in EMS building and headed by OIC: Engr. Erwin Remocal together with their
staffs and employees. They talked about their works and projects again today in the
Baligatan Dam and MARIIS Dam and they requested a cleaning materials. After the
we reviewed the relays and their contact’s, limit Switches and other components of
Electronics. We studied the manuals and the flows of each components and many
more. We did that until 11:30AM and took our lunch. In the afternoon, we asked Sir
Francis to allow us to go in Baligatan Dam to visit and see what the workers are doing
there and asked some of the workers there if possible, to catch some crabs in the river
and they said yes, so we went to the penstock to catch a crab and after that, we went
April 3, 2019
Engr. Erwin Remocal and talked about the works and projects of their employees today.
Engr. Erwin asked them what they need, what are the tools and equipments that they
need to use today and at the same time we took attendance in our meeting. Next, we
continued again the power point presentation to be presented today around 3PM. We
studied again the schematic diagram of the automation that we didn’t understand yet
and we did that until 11:30AM. After we took our lunch, we continued again what we
were doing a while ago and we prepared our self for the presentation later. Around 3PM
Engr. Francis entered the room to start our presentation then after discussing the
presentation, the two judges Engr. Rolex and Engr. Jasper entered the room to. After
we finished the presentation, we failed again but it’s okay because they teach us again
and at the same time, we learned for them especially to Sir Francis. And I believe that
April 4, 2019
Engr. Erwin Remocal and talked about the works and projects of their employees today,
Engr. Erwin asked them what they need, tools and equipment that they need to used
today and at the same time we took attendance in our meeting. Then, we started our
new assigned task which is to present on April 15, 2019 because the previous
presentation that we presented last time is always failed. Sir Francis gave us the new
Individual task for us and he said we need to present on how the water becomes
electricity in Hydropower. After which, we searched on YouTube and Google on how the
Dam works, we shared and acquired some ideas and many more. In the afternoon, we
continued again the individual activities and we did that until 5:00PM.
April 8, 2019
At the time 8:00AM in the morning, we attended the flag ceremony in front of NIA
office and after that they announced the activities this week headed by Madam Olive
and greeted the Head Engineers of the NIA because they accepted the immersion in
their department. Thereafter, we went in EMS building to join the toolbox meeting
headed by OIC: Engr. Erwin Remocal and they talked about the activities today of their
workers around Baligatan Dam, Spill Way, and MARIIS Dam and suggested cleaning
Baligatan for the inspection in the Penstock and around 9:00 in the morning we went to
Baligatan, we entered to the Penstock going through to the Butterfly Valve and to the
Tandem together with the Engineers, they checked if the Penstock have a Crack or
Leak and the Butterfly valve also. We went out through the Manhole in the Butterfly
Valve at elevation 158 then we went up at elevation 150 and we finished the inspection
around 11:00AM in the morning. We took a lunch together with the workers and at
around 2:00PM in the afternoon we asked Sir Marlon Mangahas if how the water
becomes electricity and then, we watched how the hydropower works and we did that
On this day, we attended a toolbox meeting at EMS office around 8:00AM in the
morning headed by OIC: Engr. Erwin Remocal as they talked/announced their works
and activities today. They are focused at Baligatan Dam because it should start as soon
as possible so it needed a cloud seeding to have a rain anytime. After the meeting, we
browsed the internet on how the water is converted into electricity in hydropower. My
other classmate is making his presentation because Engr. Francis requested lately that
our presentation is individual. We did our presentation until 11:30AM. In the afternoon,
On this day, we attended a toolbox meeting at EMS office around 8:00AM in the
morning headed by OIC: Engr. Erwin Remocal as they talked their works and activities
today. They are focused at Baligatan Dam because it should start as soon as possible
so it needed a cloud seeding to have a rain anytime. After the meeting, we continue our
clearly and we did our best. We did our presentation until 11:30AM. In the afternoon, we
headed by OIC: Engr. Erwin Remocal and he announced their activities today with their
workers and employees. After the meeting, we practiced our presentation because we
thought this day is our presentation. Thereafter, we continued what we were doing in
the morning until 11:30AM. In the afternoon/after we ate lunch, we continued again what
we were doing like reviewing and studying our presentation and lately at around 3:00PM
in the afternoon, Sir Francis entered the room and asked if we can present today or
Monday next week because they are busy today working in Baligatan, so we answered,
to present it on next week. Then, we attended the flag retreat around 5:00PM.
This day is our presentation on How the Water becomes Electricity. In the
8:00AM headed by OIC: Engr. Erwin Remocal and talked about their activities for this
week, he said that they are maintaining the tandem of Baligatan and other workers are
asking for the cleaning materials. After the meeting, we reviewed our presentation, we
study it deeply and we did that until 11:00 and took our lunch. In the afternoon, we
Google on how the water becomes electricity and how the generator produces
electromagnetic induction and etc. Then, around 3:00PM in the afternoon, we prepared
ourselves for the presentation and Engr. Francis asked for Draw lots (1 – 5), luckily, I
to Sir Francis and Sir Rolex for the motivation that makes my presentation successful.
After we finished our presentation, Engr. Francis and engr. Rolex talked to us to give us
advice and stay focused on what we want for our future and jobs. They taught us how to
present clearly and lastly, I would like to thank the three of them for inspiring me to pass
headed by the OIC: Engr. Erwin Remocal, they talked about their works and activities
today and after the meeting, Engr. Francis asked us if we want to go in the Spill way
after lunch to explore it. Then, we talked with each other to ask it will where we buy a
small thanksgiving blowout. In the afternoon, my two classmates bought snacks for our
thanksgiving at around 1PM and after an hour they come back and we went to eat the
snacks at their office. After the thanksgiving snacks, we went in the conference room
headed by the OIC: Engr. Erwin Remocal, and they talked about their works and
activities today and after the meeting, we talked with each other about the OJT
interviews and we had time to rest after the hard work on our presentation with Engr.
Francis, Engr. Rolex, and Engr. Jasper on April 15, 2019. After that, we watched videos
and many more to finish our time in this OJT with my 3 classmates as it is this last day
in OJT. Then, Engr. Francis announced that we are half day today because it is Holy
This is my last day as a trainee here at NIA – DRD (EMS office). We attended a
toolbox meeting around 8:00AM in the morning headed by the OIC: Engr. Erwin
Remocal and they talked about their works and activities today. After the meeting, we
continued again watching videos and took/rest with my classmate since we already
finished our final presentation last April 15, 2019. In the afternoon, around 2PM my 3
other classmates who finished their OJT’s arrived in EMS office to pass our evaluation
form to Engr. Francis Francisco. Then, we went in NIA office to meet Sir Archie to get
my DTR (Daily Time Record) and yahoo! I finally finished my On the Job training here at
NIA – DRD and at the same time, our 3 classmates passed their DTR (copy) and
Evaluation form(copy) from Engr. Francis our Supervisor to Sir Archie (HR) and after we
talked with Sir Archie, we went back again in the EMS office. We bid our goodbyes to
Engr. Francis and the employees of EMS. We thanked them for the cooperation, and
experience.
B. CHALLENGES/DIFFICULTIES ENCOUNTERED
lessons we had were hard to understand for we have a little knowledge of it. Sometimes
when they were discussing the things and equipment’s/machines that we first met in our
life, it is very hard to understand what their work is in the power plant. Next, we lend to
be sleepy during the discussions and when studying the Manuals of all the
our mind. Third, we need to behave at all times when going at Hydro Electric Power
Plant per elevations (158, 154 and 150) because all the controls, machines and wirings
there is too sensitive and it can cause trouble in any human. Fourth, we need to get up
very early in the morning so that the LTO can’t catch us and at the same time, we will
far and too deep from our place/home, and the solution they offered is having private
vehicle and motorcycle. The other problems we met again if we have a private vehicle
or motorcycle is, we have no drivers license and having a doubt at Land Transportation
Office (LTO) because they arriving very early in the morning anytime. The solution
offered is to drive safely going in the office and be careful on the road.