DETAILED ESTIMATE
I. Plastering Works ( Q = 162.08 )
a. Materials
70 bags - Excel Cement @ 260.00 = 18,200.00
2 kgs - Concrete nail @ 80.00 = 160.00
6 cum - Sand @ 500.00 = 3,000.00
25 bags - Bostik Ultra fino skim coat @ 580.00 = 14,500.00
35,860.00
b. Labor
20,000.36
b. Labor
17,455.20
b. Labor
8,075.00
b. Labor
23,925.00
SUMMARY
1 Material Cost = 344,223.59
2 Labor Cost = 113,405.96
3 Indirect Cost = 44,972.46
TOTAL PROJECT COST 502,602.02
ARNOLD VERCELES
Civil Engineer
61,446.40