FINANCIAL TARGETS
INDICATOR
PROGRAMS/ PROJECTS (OUTPUT-LEVEL) MEANS OF PHYSICAL TARGETS YEAR 1 YEAR 2 YEAR 3
VERIFICATION YEAR 1 YEAR 2 YEAR 3 AMOUNT AMOUNT AMOUNT
PROVISION OF ACCESS
I. Personnel
1. Improved number of Increased number of 6 additional Teachers 2 teachers 2 teachers 2 teachers
Teaching Personnel teaching personnel with Plantilla Items 512,476.00 512,476.00 512,476.00
Daily subscription of
2.6. Improved Library Services Increased number of newspaper and the
and materials from 10% to 90% Library materials book to user ratio is 1:1 25% 25% 25% 30,000.00 30,000.00 40,000.00
2.7. Improved Computer
through Rehabilitation,
Upgrading and procurement,
additional computers, The Computer to User
Instructional CDs and internet Increased Laboratory ratio is 1:1 and other
connections Materials and equipments instructional CD's 10 PC's 10 PC's 10 PC's 250,000.00 250,000.00 250,000.00
A. Intensified Review
B. Improved Teacher
contract hours to 100%
25 teachers trained on
B.1. Teachers Training the results in TNA
1. Prepare Training Needs Instrument approved by
Analysis Matrix the school Approved TNA 200.00 250.00 300.00
19 prospective
participants complete TNA Accomplished TNA
2. Administed TNA instrument instrument
3. Analyze TNA result Trainee need identified TNA report
Report accepted by the
4. Prepare TNA report organization Training design
Training Program Design
incorporating the training
5. Prepare Training Design needs Training design
Perspective resouce
6. Contact/Resource Person person Service Contract 3,000.00 4,500.00 6,000.00
7. Prepare Logistical Training Venue and
Requirement materials prepared Budget 10,000.00 10,000.00 11,500.00
8. Communicate with Memorandum sent to the
Participants participants Memoradum or Letter
19 teachers attended the
9. Conduct Training training Attendance Sheet 20,000.00 20,000.00 21,500.00
Indentified strengths and
areas of improvements of Training evaluation
10. Evaluate Training the training design results 3,600.00 3,600.00 4,000.00
Training completion
11. Prepare and Submit Report Training report accepted report
SUB-TOTAL (3) 36,800.00 38,350.00 43,300.00
C. Improved Participation
from LGUs
Increased participation of
C.1. Stakeholders Summit LGU to 100%
1. Planning Result plan conducted Plan
2. Communicate with the
participants Letter Reply Slip
Attendance sheet and
3. Organize core group List of member minutes of meeting
4. Prepare logistical
requirement Budget Plan Budget 8,000.00 8,800.00 9,600.00
100% of the stakeholders
5. Conduct the Summit attended Attendance Sheet
6. Conduct Post-Evaluation 100% evaluated Evaluation result
SUB-TOTAL (4) 8,000.00 8,800.00 9,600.00
D. Improved Nutritional
Status of Students
Increased nutritional
status of students to
D.1. Feeding Program 100%
Nutritional Status
1. Profiling of students' 100% of the student were Report of the last 3
nutritional status profiled years 250.00 300.00
2. Preparing of feeding Approve feeding program Feeding Program
program design design Design
3. Prepare logistical
Requirement Approved budget Budget 90,000.00 117,000.00 152,000.00
Validated attendance of
4. Carrying out of the feeding the students who are part
program of the feeding program
100% of the target
participants of the feeding
program are in normal Current nutritional
5. Evalution of the result nutritional status status report
SUB-TOTAL (5) 90,000.00 117,250.00 152,300.00