PIPING SUPPORT ELEMENTS

This specification has been revised as indicated below and described in the revision record on the following
page. Please destroy all previous revisions.

Revision Date Originator's Reviewed/Checked By Pages


No. Name & Initials Name & Initials
A 9/23/2010 P. D. Quinn 4
0 12/20/2010 R. C. Merrick 10
1 3/31/2011 Tim Kuo / R. C. Merrick C. Dwyer 10

APPROVALS SIGNATURES DATE

Lead Engineer
Engineering Manager:
Client Approval:

ISSUED FOR : Construction X Other APPROVED


Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 2 of 10
Revision 1

PIPING SUPPORT ELEMENTS

Record of Revisions

Revision Date Description


No.

A 9/20/2010 ISSUED FOR APPROVAL – TABLE OF CONTENTS ONLY

0 12/20/2010 ISSUED FOR APPROVAL – ENTIRE DOCUMENT

1 3/31/2011 ISSUED APPROVED


Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 3 of 10
Revision 1

PIPING SUPPORT ELEMENTS

Table of Contents

1.0 GENERAL...................................................................................................................................... 4
1.1 Summary............................................................................................................................ 4
A. Scope of Specification ........................................................................................... 4
B. Related Specifications............................................................................................ 4
C. Terminology .......................................................................................................... 4
1.2 References.......................................................................................................................... 4
A. AISC (American Institute for Steel Construction)................................................. 4
B. ANSI/MSS (American National Standards Institute/Manufacturer's
Standardization Society) ........................................................................................ 4
C. ASME (American Society of Mechanical Engineers) ........................................... 4
1.3 Quality Assurance............................................................................................................. 5
1.4 Submittals .......................................................................................................................... 5
1.5 Product Delivery and Handling....................................................................................... 5
A. Assembly of Materials ........................................................................................... 5
B. Tagging and Boxing............................................................................................... 5
1.6 Guarantee .......................................................................................................................... 6
2.0 PRODUCTS ................................................................................................................................... 6
2.1 Materials ............................................................................................................................ 6
2.2 Design Criteria .................................................................................................................. 6
A. Allowable Stress .................................................................................................... 6
B. Spring and Rod Hangers ........................................................................................ 7
C. Welding.................................................................................................................. 8
D. Corrosion Control/Painting.................................................................................... 8
E. Dimensions ............................................................................................................ 8
2.3 Identification and Tagging ............................................................................................... 8
3.0 EXECUTION ................................................................................................................................. 9
3.1 Inspection............................................................................................................................ 9
3.2 Field Erection and Installation ............................................................................................ 9
3.3 Inspection after Installation............................................................................................... 10
4.0 ATTACHMENTS ........................................................................................................................ 10
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 4 of 10
Revision 1

PIPING SUPPORT ELEMENTS

1.0 GENERAL

1.1 Summary

A. Scope of Specification

This specification prescribes the general requirements for supply and installation of the
fabricated elements for support and control of piping systems and components. The
requirements outlined herein are supplementary to the specification drawing sheets.
Together they comprise the specification for design, material selection, fabrication,
inspection, and packaging for the following elements and their accessories: constant
support hangers, variable support hangers, rod hangers, pipe shoes, guides, miscellaneous
supports, struts, vibration dampeners, rollers, slide bearings, or special elements as
identified by the specification drawing sheets.

B. Related Specifications

Work in this specification shall be coordinated with Marafiq Engineering Specifications:

 MQ-SP-P-5001: Process and Utility Piping Design, Layout, and Drawing


 MQ-SP-P-5009: Piping Standard Details
 MQ-SP-P-5029: Welding - Piping, Shop/Field Fabrication
 MQ-SP-M-4039: Painting

C. Terminology

The following terms are defined as stated, unless otherwise indicated:


1. Pre-Engineered Supports: Includes all standardized, pre-designed, load rated
supports whose intended use encompasses multiple applications.
2. Engineered Supports: Includes all special, individually designed supports intended
to be used in a single application.
1.2 References

The publications listed below form part of this specification. Each publication forming part of this
specification shall be the latest revision and addendum in effect on the date this specification is
issued for construction unless noted otherwise. Except as modified by the requirements specified
herein or the details of the drawings, Work included in this specification shall conform to the
applicable provisions of these publications.
A. AISC (American Institute for Steel Construction)
B. ANSI/MSS (American National Standards Institute/Manufacturer's
Standardization Society)
1. ANSI/MSS SP-58 Pipe Hangers and Supports, Materials, Design and
Manufacturer
2. ANSI/MSS SP-69 Pipe Hangers and Supports, Selection and Application
C. ASME (American Society of Mechanical Engineers)
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 5 of 10
Revision 1

PIPING SUPPORT ELEMENTS

1. B31.1 Power Piping


2. B31.3 Process Piping
D. AWS (American Welding Society)
1. D1.1 Structural Welding Code – Steel
E. ASTM (American Society of Testing Materials)
1. A123 Specification for Zinc Coating (Hot-Dip Galvanizing)
Coatings on Iron & Steel Products
2. A153 Specification for Zinc Coating (Hot-Dip) on Iron and Steel
Hardware
1.3 Quality Assurance

Supplier shall develop and apply Quality Assurance and Quality Control Procedures and make
them available to Buyer upon request.

1.4 Submittals

A. Supplier shall be required to supply a Certificate of Material Compliance for each


shipment stating that each item listed and included in that shipment conforms to the
specifications noted on the bills of material or on the specification or fabrication and
installation drawings. This certificate shall be signed by the supplier's authorized agent
and properly notarized.
B. Supplier shall be required to furnish a production schedule indicating material allocated
for this project and fabrication/shipping progress of each assembly on a biweekly basis, if
requested in writing.

1.5 Product Delivery and Handling

A. Assembly of Materials

1. Each assembly of spring hangers, rod hangers, vibration dampeners, and


miscellaneous supports (made up of 2 or more components) shall be completely
preassembled and packaged as an individual unit except for 12 inch and larger pipe
clamps. These may be reversed and securely wired or banded to its corresponding
rod to accommodate bundling or boxing. All items shall be preassembled with their
respective bolts, nuts, legs, turnbuckles, and clevises. There are to be no loose pieces.
2. Single items such as pipe shoes may be properly boxed or crated, and shipped as
bulk items.
B. Tagging and Boxing

1. Each assembly shall be identified with its own tag assembly number as indicated on
the specification drawing or fabrication and installation drawing.
2. A copy of the buyer's specification drawing or fabrication and installation drawing,
the supplier's installation instructions, the bill of materials, and the standard packing
list, shall be inserted in a sealed plastic envelope and securely attached to its
respective assembly.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 6 of 10
Revision 1

PIPING SUPPORT ELEMENTS

3. All components required for completion of any assembly must be shipped together in
the same package/crate by the supplier. Partial component shipment of an assembly
shall not be acceptable; however, partial shipment of completed assemblies, of a
large order, is acceptable and encouraged.
4. Where practical, material shall be palletized with a gross weight not to exceed 1
tonne.
5. For inland shipping and storage, adequate packaging shall be provided for protection
against the elements.
6. Where supplier has not adhered to specific instruction pertaining to assembly,
tagging and/or boxing of these support elements, supplier shall accept all liability
and financial burdens as may be accrued by the buyer. Documentation shall
accompany all charges to supplier's account.
1.6 Guarantee

The supplier shall provide warranty and guarantee for all items within supplier's scope of supply in
accordance with buyer's terms and conditions of purchase.

2.0 PRODUCTS

2.1 Materials

A. Selection of material for the support and its components shall be governed by the design
temperature of the line and the applicable codes listed in Section 1.2 of this specification
unless specific materials are indicated on the specification drawing and the fabrication
and installation drawing.
B. Alloy pipe clamps shall be used for lines operating above 399 degrees C (750 degrees F)
and below minus 29 degrees C (minus 20 degrees F).
C. All contact areas shall be designed or arranged so that there is no electrolysis or galvanic
action.
D. All clamp halves shall be formed from continuous plate.
2.2 Design Criteria

A. Allowable Stress

1. Stress on all components shall be within the limits set by applicable codes listed in
Section 1.2 of this specification.
2. Sufficient surface shall be supplied on beam connections so that the welds prescribed
on the specification drawings can be achieved in accordance with the applicable
codes listed in Section 1.2.
3. In the event that there is a conflict between codes and specifications, the more
conservative stresses shall be used for design.
4. Design calculations demonstrating compliance to stress limitations on fabricated
assemblies shall be made available for review on request. Appropriate stress
intensities and the basis for using particular intensities shall be part of the
calculation.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 7 of 10
Revision 1

PIPING SUPPORT ELEMENTS

B. Spring and Rod Hangers

1. Maximum deviation from spring constant rate of change for variable spring hangers,
as published in supplier's catalog, must not exceed 10 percent on either the heavy or
the light side.
2. Variable and constant spring hangers shall be calibrated, tested, and preset so that the
marked operating load is within 2 percent of the load shown on the hanger drawing
after the prescribed movement.
3. Constant support hangers must have a field load adjustment of at least 10 percent on
either side of the operating hot load.
4. Hanger assemblies shall be capable of deflecting 4 degrees minimum from vertical
position between pivot points with no appreciable effect on the operational function
of the assembly.
5. Travel stops shall be supplied with each spring hanger assembly. The travel stops
presetting the spring at the installation load shall restrict both upward and downward
movement; however, the travel stops shall not restrict the adjustment of the spring
assembly while the stops are in place. These stops are to have a red warning tag.
This tag shall have a warning note in Arabic and English, as taken from the
specification drawing, indicating when the stops are to be removed.
6. Travel stops must be securely linked to the spring housing when they are not in use.
Attachments must be designed so that the stops are not easily discarded. A light
chain welded to the hanger housing and travel stop is recommended. Securing stops
with a wire is not permissible.
7. Where the spring housing or components of the assembly are not capable of
supporting the hydrotest loads, a hanger rod must be supplied and shipped with the
assembly and clearly marked in Arabic and English, "For Use During Hydrotest
Only."
8. Buyer must receive formal notification of each spring hanger assembly not capable
of sustaining the hydrotest load. These spring hanger assemblies must be tagged in
Arabic and English, "Remove This Assembly During Hydrotest."
9. Spring housing shall have a minimum thickness of the following:
Nominal Housing O.D. Thickness
DN 80 (NPS 3) 3.0 mm (1/8")
DN 100 – 200 (NPS 4 - 8) 4.5 mm (3/16")
DN 250 – 300 (NPS 10 – 12) 6.5 mm (1/4")
10. Beams supplied by the supplier of the spring hanger assemblies shall be designed so
that there is a maximum of 1.6 mm (1/16 of an inch) deflection for the maximum
load indicated on the specification drawing.
11. Spring hanger assemblies and engineered rod hangers do not include weights of riser
clamps, spring housing, rods, pipe clamps, or connecting beams in the design loads
shown on the specification drawings. Supplier shall adjust calculated loads to
accommodate this additional weight. This new calculated load shall be indicated on
the supplier's bill of materials.
12. Base type springs shall be furnished with a load flange.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 8 of 10
Revision 1

PIPING SUPPORT ELEMENTS

13. Components must be compatible for assembly and erection without field
modifications. Modifications required in the field due to noncompliance for correct
fit-up shall be grounds for back charges.
14. Where bands are used to retain travel stops, the band shall be made of steel and
located in a position that does not obscure the load markers.
15. Lugs or brackets used to support the hanger must be oriented to allow proper
positioning of the spring scale as noted on the specification drawing.
16. Lifting lugs must be supplied for each spring hanger weighing over 45 kg (100
pounds).
C. Welding

1. Welding procedures, qualifications, and examinations shall be in accordance with


Welding Engineering Specification MQ-SP-P-5029: Welding - Piping, Shop/Field
Fabrication, and ANSI/MSS-SP-58.
2. Load carrying welds shall be sized in accordance with applicable codes and
specifications listed in Section 1.2 of this specification.
D. Corrosion Control/Painting

1. All components, with the exception of the spring coil, alloy, stainless steel, or
aluminum parts, shall be galvanized or painted in accordance with Mechanical
Engineering Specification MQ-SP-M-4088: Galvanizing or MQ-SP-M-4039:
Painting as indicated on attachment 03.
2. Galvanized spring hanger housings shall not be welded after the coil has been
installed. Retainers for the coil shall be of a bolted or split ring type construction to
avoid burning the housing.
3. Spring coils shall be neoprene coated with a thickness of 0.15 mm (6 mils).
E. Dimensions

Fabrication and installation dimensions shall be according to the specification drawing


sheets. For Pre-Engineered Supports see Marafiq Piping Standard Details MQ-SP-P-
5009.

2.3 Identification and Tagging

A. Identification

Each assembly shall be packaged as a unit and identified with its own tag assembly
number as shown on its specification drawing and/or fabrication and installation drawing.

B. Tagging

1. Tags shall be stainless steel, brass, or aluminum having a minimum thickness of 0.4
mm (28 gage) and shall be securely attached to each item, with the exception of
spring hangers, with a corrosion resistant wire. The wire shall be minimum 1.5 mm
(16 gage). All lettering shall be a minimum of 4 mm (3/16 of an inch) high in Arabic
and English, in a color to contrast the tag.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 9 of 10
Revision 1

PIPING SUPPORT ELEMENTS

2. Items which cannot be tagged by the above method, such as pipe shoes and guides,
must be marked on the surface of the item in such a way that field painting shall not
cause the markings to be obscured or obliterated.

3. Spring hangers shall have a corrosion resistant metallic nameplate tag having a
minimum thickness of 0.4 mm (28 gage), permanently attached to spring housing by
means of 4 stainless steel fasteners. All lettering shall be a minimum of 5 mm (3/16
of an inch) high in Arabic and English, in a color to contrast the tag. This tag shall
contain but not be limited to the following data:

a. Spring scale including load versus deflection kg/mm, at 10 mm intervals.


b. Tag assembly number.
c. Hot load setting (operating) clearly marked by a raised element such as a rivet,
painted red.
d. Cold load setting (installed) clearly marked by a raised element such as a rivet,
painted white.
e. Spring type, size, and serial number.
f. Manufacturer's name and address.
g. Manufacturing date.
h. Purchase order number.

3.0 EXECUTION

3.1 Inspection

A. Each piping support element and assembly shall be inspected for conformance to its
respective contract drawing and this specification.

B. Verify that all contact surfaces and all piping support elements and assemblies are free of
all foreign matter prior to installation.

C. Check the alignment of all piping support elements and assemblies prior to making any
permanent attachments to any piping or structures.

3.2 Field Erection and Installation

A. Location

Piping support elements and assemblies shall be installed at the locations shown on the
contract drawings.

B. Procedure

Welding performed in the installation of all piping support elements/assemblies shall be


in accordance with the welding specifications referenced in Section 1.2.
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Page 10 of 10
Revision 1

PIPING SUPPORT ELEMENTS

3.3 Inspection after Installation

Piping support elements and assemblies upon completion of installation shall be inspected for
proper location and alignment, hot and cold load settings, quality of installation, cleanliness, and
completeness of work, painting damage, and any other damage which might have occurred during
installation. Any deficiencies should be brought to the Buyer's attention in writing.

4.0 ATTACHMENTS

Attachment 01:
Index: Fabrication Details For Engineered Supports
Attachment 02:
Fabrication Details For Engineered Supports
Attachment 03:
Index: Fabrication Details For Pre-Engineered Supports
Attachment 04:
Fabrication Details For Pre-Engineered Supports

End of Specification
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 01 - Page 1 of 1
Revision 1

PIPING SUPPORT ELEMENTS

Index: Fabrication Details For Engineered Supports

DATE: REV.:
CONTRACT NO.: PO NO.: BY: REVIEWED:

Area No.:

Tag No. Line No. Drawing No. Rev. Comments


Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 02 - Page 1 of 1
Revision 1

PIPING SUPPORT ELEMENTS

Fabrication Details for Engineered Supports

FABRICATION DETAILS

FOR

ENGINEERED SUPPORTS
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 03 - Page 1 of 3
Revision 1

PIPING SUPPORT ELEMENTS

Index: Fabrication Details For Pre-Engineered Supports


Detail Document Description Revision Electronic Fabrication Paint = (P)
Number Number Number File Name Vendor = (V) Galv = (G)
Field = (F)
5A1 *-** MQ-SP-P-5009 Anchor
5A1 *-** MQ-SP-P-5009 Anchor
5A2 -* MQ-SP-P-5009 Anchor
5ABS1 MQ-SP-P-5009 Angle Base Support
5ABS2 MQ-SP-P-5009 Angle Base Support
5ASW-* MQ-SP-P-5009 Adjustable Spring Wedge
5ASW-* MQ-SP-P-5009 Adjustable Spring Wedge
5ASW-* MQ-SP-P-5009 Adjustable Spring Wedge
5BA * MQ-SP-P-5009 Base Anchor
5BS1 -* MQ-SP-P-5009 Base Support
5BS1 -* MQ-SP-P-5009 Base Support
5BS2 MQ-SP-P-5009 Base Support
5BSA1 MQ-SP-P-5009 Base Support Adjustable
5BSA1 MQ-SP-P-5009 Base Support Adjustable
5BSA2 MQ-SP-P-5009 Base Support Adjustable
5BSA2 MQ-SP-P-5009 Base Support Adjustable
5BSL * MQ-SP-P-5009 Base Support Lined
5BSL * MQ-SP-P-5009 Base Support Lined
5CAS -*-** MQ-SP-P-5009 Cold Anchor Shoe
5CAS -*-** MQ-SP-P-5009 Cold Anchor Shoe
5CAS -*-** MQ-SP-P-5009 Cold Anchor Shoe
5CAS -*-** MQ-SP-P-5009 Cold Anchor Shoe
5CAS -*-** MQ-SP-P-5009 Cold Anchor Shoe
5CBS * MQ-SP-P-5009 Cold Base Support
5CBS * MQ-SP-P-5009 Cold Base Support
5CC -*-** MQ-SP-P-5009 Cold Cradle
5CC -*-** MQ-SP-P-5009 Cold Cradle
5CC -*-** MQ-SP-P-5009 Cold Cradle
5CC -*-** MQ-SP-P-5009 Cold Cradle
5CG * MQ-SP-P-5009 Cold Guide
5CHD -*-** MQ-SP-P-5009 Cold Hold Down
5CHD -*-** MQ-SP-P-5009 Cold Hold Down
5CHD -*-** MQ-SP-P-5009 Cold Hold Down
5CHD -*-** MQ-SP-P-5009 Cold Hold Down
5CHD -*-** MQ-SP-P-5009 Cold Hold Down
5CP1 -* MQ-SP-P-5009 Concrete Pad
5CP2 MQ-SP-P-5009 Concrete Pad
5DA1 MQ-SP-P-5009 Directional Anchor
5DA2 * MQ-SP-P-5009 Directional Anchor
5DA2 * MQ-SP-P-5009 Directional Anchor
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 03 - Page 2 of 3
Revision 1

PIPING SUPPORT ELEMENTS

Index: Fabrication Details For Pre-Engineered Supports


Detail Document Description Revision Electronic Fabrication Paint = (P)
Number Number Number File Name Vendor = (V) Galv = (G)
Field = (F)
5DA2 * MQ-SP-P-5009 Directional Anchor
5DA3 MQ-SP-P-5009 Directional Anchor
5DA4 * MQ-SP-P-5009 Directional Anchor
5DA4 * MQ-SP-P-5009 Directional Anchor
5DS1-* MQ-SP-P-5009 Dummy Supports
5DS2 -* MQ-SP-P-5009 Dummy Supports
5FS1C * MQ-SP-P-5009 Field Support
5FS1S * MQ-SP-P-5009 Field Support
5FS2C * MQ-SP-P-5009 Field Support
5FS2S * MQ-SP-P-5009 Field Support
5FS3C MQ-SP-P-5009 Field Support
5FS3S MQ-SP-P-5009 Field Support
5G1 -* MQ-SP-P-5009 Guide
5G2 MQ-SP-P-5009 Guide
5G3 MQ-SP-P-5009 Guide
5G4 * MQ-SP-P-5009 Guide
5G5 MQ-SP-P-5009 Guide
5GSB * MQ-SP-P-5009 Gusset Support Bolted
5GSB * MQ-SP-P-5009 Gusset Support Bolted
5GSW * ** MQ-SP-P-5009 Gusset Support Welded
5GSW * ** MQ-SP-P-5009 Gusset Support Welded
5HD -* MQ-SP-P-5009 Hold Down
5HD -* MQ-SP-P-5009 Hold Down
5HD -* MQ-SP-P-5009 Hold Down
5HD -* MQ-SP-P-5009 Hold Down
5HE1 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE1 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE2 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE2 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE3 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE4 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE5 -* MQ-SP-P-5009 Valve Handwheel Extension
5HE6 -* MQ-SP-P-5009 Valve Handwheel Extension
5HR1 -* MQ-SP-P-5009 Hanger Rod
5HR2 MQ-SP-P-5009 Hanger Rod
5HR3 -*-** MQ-SP-P-5009 Hanger Rod
5HR6 * MQ-SP-P-5009 Hanger Rod
5HR6 * MQ-SP-P-5009 Hanger Rod
5HR6 * MQ-SP-P-5009 Hanger Rod
5IC -* MQ-SP-P-5009 Isolation Cradle
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 03 - Page 3 of 3
Revision 1

PIPING SUPPORT ELEMENTS

Index: Fabrication Details For Pre-Engineered Supports


Detail Document Description Revision Electronic Fabrication Paint = (P)
Number Number Number File Name Vendor = (V) Galv = (G)
Field = (F)
5LP *-** MQ-SP-P-5009 Load Pad
5PU1 -* MQ-SP-P-5009 Pick Up
5PU2 MQ-SP-P-5009 Pick Up
5PU3 -*-** MQ-SP-P-5009 Pick Up
5S1 * **-*** MQ-SP-P-5009 Pipe Shoe
5S1 * **-*** MQ-SP-P-5009 Pipe Shoe
5S2 * **-***-**** MQ-SP-P-5009 Pipe Shoe
5S2 * **-***-**** MQ-SP-P-5009 Pipe Shoe
5S3 * **-***-**** MQ-SP-P-5009 Pipe Shoe
5S3 * **-***-**** MQ-SP-P-5009 Pipe Shoe
5ST -* MQ-SP-P-5009 Support Trunnion
5TSP *-** MQ-SP-P-5009 Teflon Slide Plate
5UBG -* MQ-SP-P-5009 U-Bolt Guide
5UBS -* MQ-SP-P-5009 U-Bolt Support
5UHR MQ-SP-P-5009 Utility Hose Rack
Power and Water Utility Co. for Jubail and Yanbu (MARAFIQ) Master Specification MQ-SP-P-5024
Project Name: Date: 31 Mar 2011
Contract Number: Attachment 04 - Page 1 of 1
Revision 1

PIPING SUPPORT ELEMENTS

Fabrication Details for Pre-Engineered Supports

FABRICATION DETAILS

FOR

PRE-ENGINEERED SUPPORTS