You are on page 1of 23
TEG 1-1310-005E ISSUED JUL. 6,'88 ENGINEERING GUIDE FOR PROCESS PLANT DESIGN OF PIPING, INSULATION, AND PAINTING ASSIGN OF DWG NUMBERS FOR PLANNING & PIPING DRAWINGS ING CORPORATION JAPAN roo O ale ENGINEERING MANUALS TEM ASSIGN OF DRAWING NUMBERS 31128 FOR PLANNING & PIPING DRAWINGS tssuep | sut.6,88 PAGE 1 OF 20 PAGE 1. GNERAL 1.1 antent and Scope 2 112 Definition 2 2. DNG NOs, & TITLES FOR PLANNING DRAWINGS 2.1 General 3 212 Assign of DNG Nos. 4 2.3 Determination of Title 5 214 Title of Planning Drawings 3. DNG NOs, 6 TITLES POR PIPING DRAWING General 12 Assign of Duc 2B Determination les 15 Title of Piping Drawings 16 ronvo G saan ENGINEERING MANUALS ‘Tove Enomnmninc Cor GN OF DRAWING NUMBERS FOR PLANNING & PIPING DRAWINGS [issueo JUL.6,88 PAGE 2 OF 20 1. GENERAL 1.1 Intent and scope ‘This manual, which applies to all jobs and proposals both for Japan and overseas, determines the details of assigned DWG Nos, prescribed in BBM= 496% "Numbering of Drawings" and the standard format for DWG Titles. TG i625 M036. 1.2 Definition (1) Complex ‘The term "Complex" as referred to herein means a composite plant made up of the plural number of Unit Plants connected together by raw materials and products. (2) unit Plant The term "Unit Plant", when used in the piping drawing, refers to a process plant made up of the plural number of Sections. 3) Section ‘The term "Section" refers to an aggregate of the plural number of Areas, set up for a division of process or construction works. ("Section" used in such as SECTION PIPING means sectional view of the drawing.) (4) Area ‘The term "Area" refers to the minimum plot unit divided by Key Plan, drawing, and applies to all underground and above ground equipment and piping within the plot. FoRM A.cs0014 ‘Toro Exarrnama Cor ASSIGN OF DRAWING NUMBERS ENGINEERING MANUALS. ISSUED JUL.6,88 FOR PLANNING & PIPING DRAWINGS 2a DWG_NOS. & TITLES FOR PLANNING DRAWIN General mM @ a a For information drawings intended for outside department use and study drawings for inside department use, DWG Nos, of 800-899 should be used, Attach suffixes, A, Bus to the DWG Nos. of the 800-899 as required to form 4-digit numbers. Example: 801A, 3028 For drawings such as piping arrangement drawings, when the drafting work at the next stage proceeds within the same match line, the prefix "Sk" should be attached to the Piping DWG Nos. If there is only a little change in tne drawing the Plan Dwgs. may be used with slight modifications and by changing the DWG Nos., as piping drawings. As "SK" is attached to the No. to be determined at the next stage, the DNG Nos. will have a total rumber of 5-7 figure. Example: SK302, SK305A, SK5302A. Form a.ca0014 ToKvo @ eee ENGINEERING MANUALS ‘Toro Exomenninc Conn ASSIGN OF DRAWING NUMBERS FOR PLANNING & PIPING DRAWINGS ISSUED | JUL.6,88 2.2 Assignment of DWG Nos (2) DWG, Nos. for Information to outside and Study inside should conform to the following table. , wunber of | type of Drawing owe wos. | Preparable Remarks i BiG | PLOY PLAN STUDY | 800-809 10 | Figures in parentheses COMPLEX Lavour Puan | | (200) | apply to 4-figures we ROUTING STUDY | e1o-a1 5 | (2) "To be used before MAIN RACK ROUTING | | preparing Key Plan. uct ROUTING | 30) | (2) Upon comptetion of Geiteat tine rovrmne | | 1? Rey plan becomes of | | | sxo00, + T FLOW DIA ROUTE | s1s-e19 s | ' (230) | | turormanton for wechnnrent | 920-859 | 40 oEPr. | @ao40) FURNACE | (230) | Excludes nozzle, platform Other than NOZZLE | | 430) jana other furnace okrennatron equipment. PUMP. & COMPRESSOR | 9300-8192) (260) ‘TOWER & "TANK 840R-2497| (260) | Nozzle orientation & MEAT EXCHANGER a50a-8592, (260) | platform, INFORMATION for TNSTRUMEN? and ELECTRICAL DEPT, | | nstRuMENT 60-864 5 | ELECTRICAL 865-869 5 | INFORMATION for CIVIL «| { STRUCTURAL DEPT. | i PIPE RACK | e70a-6 742 > | | (230) STRUCTURE | e7sa-e792 (230) | platform to be included BUILDING e80n-e84z, (130) |here, too. FOUNDATION ge5-an9z | (130) | Includes support as well. INFORMATION for Utility | 890A-894z/ (130) | 5 MISCELLANEOUS Ta95a-e092] (130) 5 FORM A630 14 roo O feet ENGINEERING MANUALS ‘Toro Ewarvtenins Cour ASSIGN OF DRAWING NUMBERS ——— POR PLANNING 5 PIPING DRAWINGS ISSUED | sui.6,88| PAGE 5 OF 20 (2) DWG Nos. attached with prefix ” should conform to the following Fenner or] [Sk9309a, UNDERGROUND PLANNING ' (1) Titles of Planning Drawings should be written in no more than 2 lines. However, for jobs to be indicated in a foreign language other than English, if the drawings are to be used for meetings with customer, the title may be written in 4 lines, with the title in the foreign language other than English written together with the English title. (2) The standard language used for titles should be English, no matter whether the customer is a domestic or overseas customer. However, if this poses any problem in the case of a Japanese customer, then, a Japanese title may be used. (3) Determine the title, referring to par. 2.4. 2.4 Titles of Planning Drawings (1) PLO? PLAN studies (a) Por complex PLANNING DRAWING GENERAL PLOT PLAN (b) For unit plant PLANNING DRAWING PLOT PLAN ‘Toro Exomermninc Conn FOR PLANNING & IssuED | JUz.6,86 (2) ROUTING studies 4) Routing studies for main ENGINEERING MANUALS ASSIGN OF DRAWING NUMBERS PIPING DRAWINGS PAGE 6 OF 20 pipe line, for determination of main ack width and/or planning of sub rack. ROUTING STUDY MA ROUT MA routing a specific ROUT BOILER () when ROUT {20K STEAM (©) When routing an instrume ROUT INSTRUMENT DUCT ROUT ELECTR 4) When preparing a ROUTING ROUT N RACK NG STUDY N LINE critical line, NG STUDY FEED WATER NG STUDY nt duct or electrical cable. NG STUDY NG STUDY CAL CABLE DMG. of UTILITY FLOW DIA, NG STUDY STEA SYSTEM ROUTING STUDY WATER SYSTEM ronvo GJ saan ENGINEERING MANUALS TEM ‘Toro Examrmenc Cor ASSIGN OF DRAWING NUMBERS | 31128 FOR PLANNING % PIPING DRAWINGS t ISSUED JUL.6, 88 | PAGE 7 oF 20 ROUTING STUDY AIR SYSTEM ROUTING STUDY FUEL SYSTEM (4) When preparing an Information DNG, for Mechanical Dept. (a) Por information such ance nozzle and platform. PLANNING DRAWING BA-IO1 NOZZLE ORIENTATION 4 P. BA-102 4-103 ) Information DWG. for platform, ladder and nozzle orientation of tower, tank, etc. NOZZLE ORIENTATION, PLAT FORM sLADDER| DA-201 LAT FORM Title of information DWG, for pumps, compressors, blower, etc. (3) For connection with vendor equipment BL. ENTERING & LEAVING LINES GA-101 & GT-101 ii) Outline of layout, piping connection direction, ete. (Bor common us © with drawings to be released t structural Dept.) Avil & PLANNING DRAWING COMPRESSOR HOUSE roKvo GF ssran ENGINEERING MANUALS ] TEM ‘Toro Exaremec Cour ASSIGN OF DRAWING NUMBERS | 31126 FOR PLANNING & PIPING DRAWINGS ISSUED | guL.6,88 PAGE a OF 20 ication of such data as allowable external fe the Job communication memo. (a) Title of nozzle orientation DWG. for heat exchangers. NOZZLE ORIENTATION EA-i05A,B (2) Por information DWG. other than the above (b), (c), (a). Ex, DAVIT PLANNING DNG., CATALIST LOADING DWG., REPAIR PLANNING DWC. PLANNING DRAWING MAINTENANCE AT GT-{04 nformation DWG. for Instrument and Electrical Depts. Instruments (i) Instruments Duct PLANNING DRAWING INSTRUMENT DUCT (43) Planning of installation and layout of local instruments PLANNING DRAWING LICA-301 (iii) Planning Drawings showing desuperheaters and flow tu xtra-long devices as summarized form. : PLANNING DRAWING QH-101 ToKyo @ JAPAN ENGINEERING MANUALS TEM ‘Toro Exomezminc Coar ASSIGN OF DRAWING NUMBERS 31126 FOR PLANNING & PIPING DRAWINGS [issuep | sur.6,6 | PAGE 9 OF 20 (b) Electrical (4) Electrical cable (above grade) PLANNING DRAWING ELECTRICAL CABLE ROUTE (Since cables are normally installed underground, they are taken care of undergrourd DWGs.) (21) detail Cable Route around motors PLANNING DRAWING CABLE OF GA-I03 5) Information DWG. for Structural & Civil Dept. 2) Por pipe rack (Rack structure and additional support. material PLANNING DRAWING MAIN PIPE RACK (ii) Detail drawing of rack PLANNING DRAWING ——- DETAIL OF MAIN PIPE RACK iii) Rack loading data PLANNING DRAWING LOADING DATA OF MAIN RACK oO eee ») Structural (loading data and structure to be shown) PLANNING DRAWING SYNTHESIS STRUCTURE ue FORM A.c20.014 TT roxvo OF JAPAN | ENGINEERING MANUALS TEM ‘Toro Evoivemninc Cour ASSIGN OF D ERS 31126 FOR PLANNING & PIPING DRAWINGS PAGE 10 OF 20 ©) For buildings PLANNING DRAWING COMPRESSOR HOUSE ‘oundation on for supports PLANNING DRAWING LOCAL FOUNDATION OF HOT SECTION CL ii) Foundation height PLANNING DRAWING LEVEL OF FOUNDATION ro) nformation Drawings for Utility Engineers BL. ENTERING & LEAVING LINE POWER UNIT PLANNING DRAWING LAY OUT OF RAW WATER POND 7) Miscelaneous Drawings & data ‘The first line should always be either "PLANNING DRAWING " or "DESIGN DATA,” The Second line should be determined either by the name of equipment. or the case in question. (8) Title of KEY PLAN KEY PLAN FOR PIPING STUDY FoRM A-c20014 TE Meee! ronvo @ saPan ENGINEERING MANUALS TEM ‘Toro. Conn ASSIGN OF DRAWING NUMBERS 31126 FOR PLANNING & PIPING DRAWINGS PAGE 11 OF 20 ii) KEY PALN for Unit Plant in Complex Ethylene plant, ethanol plant, butadiene plant) KEY PLAN FOR PIPING STUDY REFINERY PLANT Note) Some examples other than the above REFINERY PLANT) ETHYLENE PLANT, ETHANOL PLANT, BUTADIENE PLANT, etc. (9) Title of Piping stuay (i) Planning for Area divided by KEY PLAN ® BIPING STUDY ® * REACTOR & ABSORBER Notes:(') ‘The 2nd line (lower Line] should be the same with ping DWG. iret Line, change PIPING STUDY to PLAN PIPING, t follow this with "FOR" PIPING STUDY-COMPRESSION SECTION PROPYLEN & ETHYLENE PIPING STUDY- BUTADIENE PLANT COMPRESSION SECTION BUTADIENE GAS COMPRESSOR (20) As in the case of racks, plannings with same title stretches out over a very long distance, (a) When divided into no more than 3 areas PIPING STUDY MAIN PIPE RACK (NORTH AREA ) Form Acs0014 Raean ENGINEERING MANUALS TEM ‘Toro Exormezninc Coar ASSIGN OF DRAWING NUMBERS 3112 FOR PLANNING & PIPING DRAWINGS (b) When divided into 4 areas, or more (No.1, No.2, No.3, No.4, for examples] PIPING STUDY SUB PIPE RACK No. {| AREA (11) Underground planning (a) Drawings may be planned either in a simple layout with such sections as cooling water, fire fighting, sewer and cable trench shown on a singe drawing, or as divided into the plural number of sheets, PLANNING DRAWING UNDERGROUND (b) If underground DWGs, are tc be divided into the plural number of shee PLANNING DRAWING QUENCH SECTION UNDERGROUND PING DRAWINGS 3. DWG NOs. § TITLES FOR 3.1 General (2) For Piping DWGs., use Nos, of 300-499, (2) Numbers of 300-399 should be used for PLAN & and KEY PLAN, CTION PIPING DRAWINGS (3) Numbers of 400-499 should be used for other piping drawings prepared by Piping Dept. (4) Use 4- and 5-figures DWG Nos. For ordinary plants, use 4~figures DWG Nos. (6) DWG Nos, of 5 figures should be includes the plural number of pl. for large plant or when the job nts. (7) To retain apparent correlation between PLANNING and PIPING, the areas attached with SX at the stage of planning should be prepared so that removal of "SK" will pert Fonm A.cs0014 ‘Toro Examrmnins Cone ISSUED JUL. 6,88 a ENGINEERING MANUALS ASSIGN OF DRAWING NUMBERS FOR PLANNING § PIPING DRAWINGS ssignment of DNG Nos. PAGE 13 OF 20 (2) DWG Nos, of piping DWG. to be issued to customers and vendors should conform to the following table. (2) For ordinary plants, DWG Nos. of 300-399 are assigned. Inunber of Type of Drawing DWG Nos. lPreparable Remarks Due KEY PLAN FOR PIPING DWG.) 300 1 PIPING DNG. 301a-3992, | 99 x 26 |rne order of “A,B,C... (1) PLAN PIPING pWG. 301A-R | is from the bottom PLAN (2) SECTION PIPING DWG, | 3018-U | lof each Area upward in (3) DETAIL PIPING DwG. |Use the No. next | Key Plan. (Details for double |to that of PLAN | Try to start from "1" tube, vacuum tube |DuG. | whenever possible. ete.) Ex. PLAN up to 344 (4) AUXILIARY PIPING DwGluse the No. next DETAIL from 351 (Details for cooler,|to that of DETAIL | to 359 oil piping etc.) [PIPING pwc. AUK. from 371 TRACE PIPING DWG, Prefix the PIPING) 99 x 26 | |DWG. No, with TD. i TD302A, | (3) DWG Nos. of 300-399 for large plants Number of ‘Type of Drawing DWG Nos. Preparable Remarks Dua KEY PLAN FOR PIPING pwG.| 300A-Z 26 PIPING DWG. | 1301a-93992 9x99x26 |Use the Ist figure to (1) PLAN PIPING DWG. = | 1301A-R indicate each Plant or (2) SECTION PIPING pws. | 13018-U Section. (3) DETATL PIPING DNG. (4) AUXILIARY PIPING Dus. TRACE PIPING DNG. FoR A.cs0014 Use the No. next to that of the PLAN DWG, Use the No. next to that of detail piping Dac. Prefix the PIPING) 9x99x26 DWG NO. with ‘TD. ‘Toro Examaennc Coan ISSUED | JUL.6,88| ENGINEERING MANUALS ASSIGN OF DRAWING NUMBERS FOR PLANNING § PIPING DRAWINGS PAGE 14 OF 20 (4) DWG Nos. of 400-499 | Number of Type of Drawing DWG Nos. | Preparable Renarks owe NOTES FOR PIPING BG. | 400 fn SPECIAL PARTS i | For large Plant. (1) SPECTAL ORDER PARTS | 401 1026) ror large Plant: | ArBsssmay be attached (2) PIBLD FABRICATION — | 402 1(26) | next ‘to the No. paRTS i — | t HOOK UP DRAWINGS | |For large Plant: (2) seam TRAP Premnc — | 403 126) | A,Bs..nay be attached (2) SaMPLE. PIPING | 40a 1(26) | next to the No. (3) TRACE PIPING | 405 1026) | (4) DRAIN PIPING | 406-409 4(104) PIPING HANGING (1) NoneS FOR PIPE 410 1(26) JANGING (2) PIPE HANGING DETAILS | 411-429 19(494) |For large Plant Ay Besnay be attached tO the No. UNDERGROUND ' () Preine 430-439 10 (2) smWER 440-429 10 (3) TRENCH 450-454 5 BL PIPING CONNECTION 455-459, 5 DRAWING SOMETRIC DRAWINGS () 1 1/22, of smaller ISOMETRIC DUG FOR 460-469 MATERIAL TAKE OFF (2) 28, oF larger (a) Tsompmerc Prpine De (b) T.D. FoR PIPING FABRICATION = 470-489 20 (e) 1.D. FOR PIPING consmeucr ron roo @ en ENGINEERING MANUALS ‘Toro Exonvnenns Cour ASSIGN OF DRAWING NUMBERS FOR PLANNING 6 PIPING DRARTNGS ISSUED | JUL.6,88 PAGE 15 OF 20 Nanber of type of Drawing | DW Nos. Preparable Remarks | ws BILL OF MATERIALS | (1) STATUS REPORT 490 1 (2) LINE B/M | 492 1 (3) EACH DWG, | 492 | 1 (4) ORDER CONTROL | 493 1 (5) DISTRIBUTION 494 1 THERMAL STRESS 495 | 1 ANALYSTS | | 496-499 4 Includes calculation | sheets and study | sheet 3. Determination of Titles aye piping drawings should be written in 2 lines as a rule. (a) For Japanese titles, the ist line should be the name of the facility, and the 2nd line the contents and type of drawing. (b) For English titles, the Ist line should show the type of drawing together with the name of the facility and the 2nd line the contents of drawing. (2) The language used for the title may be either English or Japanese, or, if the client may so request, be both. However, it should be written within 4 lines. (3) As regards the name of the facility, a single plot within a Complex should be called a Plant Unit, that of a Plant Unit a Section, and that of a Section an Area. A single Area is a single plot divided by Key Plan and, therefore, is used in a somewhat more limited sense compared to its normal usage. Form acs00 16 roKv0 GF 1400 ENGINEERING MANUALS brat ERS. FOR PLANNING & PIPING DRAWINGS PAGE 16 OF 20 3.4 Title of Piping Drawings 1) KEY PLAN KEY PLAN FOR PIPING DWG. 2) PIPING DwG. (a) PLAN & SECTION PIPING DNG. PLAN PIPING COz2 ABSORPTION AREA (4) PLAN PIPING-COMPRESSION SECTION REFRIGERATOR AREA PLAN PIPING-COMPRESSION SECTION GB-201 3 GB-401 AREA Note: The (4) mark shown at the bottom right MUMESE 0 's prepared for the same Area. (4) means that set of a set of drawings consisting of two sheets. (©) SECTION PIPING DWC, SECTION PIPING CO2 ABSORPTION AREA (32) SECTION PIPING-COMPRESSION SECTION REFRIGERATOR AREA ronvo GF saan ENGINEERING MANUALS ‘Toro Exanasnic Coar ASSIGN OF DRAWING NUMBERS FOR PLANNING & PIPING DRAWINGS ISSUED | JUL.6,88 ©) DBTAIL PIPING DWo DETAIL PIPING JACKETED LINE AT CRYSTALIZER DETAIL PIPING VACUUM LINE AT CRYSTALIZER Note: Example of a vacuum piping. (a) AUXILIARY PIPING DNG, AUXILIARY PIPING GB-201 & GB-401 AREA Note: The 2nd line (lower line) should be the same title as the 2nd line of the PLAN & SECTION DUG, (e) Correlation among Piping Dwas. AUXILIARY drawings as well as a DETAIL be prepared for a single area, the the drawing Nos. will be as illustrated below. ex. /}—PLan———304¢ © 4A /j—pian——— 3048 © = PLAN————304a © @® section J— AUXILIARY —— 3 71 3048 — DETAIL 351 TITLE ® -PLAN PIPING 0, ABSORPTION @® sos @ PLAN PIPING CO, ABSORPTION @ scan @ PLAN PIPING C0, ABSORPTION @ sose @ SROTION PIPING C0, ABSORPTION & soas © AUXILIARY PIPING a8-20180B-401 371 © pera Prpine JACKETED PIPING AT sea C0, ABSORPTION FoRM A.ca0o 14 rove & JAPAN ENGINEERING MANUALS ‘Toro Excinzerinc Cor ASSIGN OF DRAWING NUMBERS = FOR PLANNING & PIPING DRAWINGS ISSUED | JuL.6, 88) PAGE 18 OF 20 (3) TRACE PIPING (a) When using reproducible piping DNG: You need only erase "PLAN" ai .ét it to read "TRACE." TRACE ‘PIPING CO2 ABSORPTION UNIT (b) TE it is prepared newly as an isometric drawing (A3 or Ad): ly proposed standard-form for cover sheet. (4) UNDERGROUND PIPING (a) Tf a whole plant is covered by a single drawing: UNDERGROUND PIPING SSS ss (b) 1€ a separate drawing is to be prepared for cooling water: UNDERGROUND PIPING COOLING WATER (c) Tf @ separate drawing 15 to be prepared for fire fighting: UNDERGROUND PIPING FIRE FIGHTING (@) If a separate drawing 1s to be prepared for sewer: UNDERGROUND PIPING SEWER Note: Do not make it “SEWER SYSTEM,” JAPAN ENGINEERING MANUALS. TEM TOKYO ‘Toro Evarvezninc Cour ASSIGN OF DRAWING NUMBERS | 311268 FOR PLANNING & PIPING DRAWINGS | [issue JUL, 6,88 PAGE 19 OF 20 (e) If a separate drawing is to be prepared for trench: UNDERGROUND PIPING PIPE TRENCH (5) Connection drawing for battery Limit (BL) (a) If everything is covered by a single drawing: ———— BL, ENTERING AND LEAVING LINES (b) Tf separate drawings ar to be prepared for PLAN and SECTION, BL, ENTERING AND LEAVING LINES PLAN -PIPING BL, ENTERING AND LEAVING LINES SECTION AND DETAIL PIPING ronvo QJ sae an ENGINEERING MANUALS ‘Toro Exorenninc Cour ASSIGN OF DRAWING NUMBERS ISSUED FOR PLANNING & PIPING DRA PAGE 20 OF 20 (6) Use of Cover For the following drawings, there is no need to make a cover, as covers are separately supplied, However, if they are drawn in small pumbers of large sized drawing: the title of such drawings should be determined for each job. a) (b) @ rs) a) @ cn) NOTES FOR PIPING DRAWINGS DETAIL DRAWING FOR SPECIAL ORDER PARTS DETAIL DRAWING FOR FIELD FABRICATION PARTS HOOK UP DRAWINGS (STEAM TRAP PIPING) : (SAMPLE PIPING) : (STEAM TRAY PIPING) 7 (DRAIN PIPING) ISOMETRIC DRAWINGS FOR MATERIAL TAKE OFF ISOMETRIC PIPING DRAWINGS ISOMETRIC DRAWING: FOR PIPING FABRICATION ISOMETRIC DRAWINGS FOR PIPING CONSTRUCTION STATUS REPORT PIPING MAT RIALS STATUS REPORT SPECIAL COMMODITY STATUS REPORT UNDERGROUND PIPING LINE BILL OF MATERIALS PIPING MATERIALS EACH DRAWING PIPING MATERIALS ORDER CONTROL PIPING MATERIALS DISTRIBUTION roxvo GF saan ENGINEERING MANUALS ‘Doo Hwoorrruma Cour | SS 1GN (uk DRAWING WUMBERS FUR PLANNING K PIPING DRAWING PAGE 10F REV DATE JESCRIPTION | 0 | $668.7. 61) meu we (al RY ISP Y » 7 RO BPR HL & HEMET BK ob, E50 BE Bae HEME AN BB AFT Cio nO RE FE TEN > 5 EE IE OD é w PETER TS Mo he Vila Pik. PIM TEM-3112 “DWG NO. ORD BH (AL + BEA (859.4. 2538: VoL) @ RIC NL BO o (2) PEC AB + fe nies oP RAB GL Tb 7 ACRE AAR ET RK 1 (3) Waa AS In& AMM LAC mee At A & TOKYO G JAPAN ENGINEERING GUIDE TEG apes ASSIGN OF DWG NUMBERS 1-1810-005E FOR PLANNING & PIPING DRAWINGS issue] DEC. 1,92 GR AB) PAGE 91 OF 1 x REY. DATE DESCRIPTION DEC. 102 MEHR @ FEMA 2) TEM -3112K 4 TEG1- 1310-0058 {2 NO. % ze fe

You might also like