PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-1
F2
--------------------------------------------------------------------------------
Columns/Loadings:
Column Cmb N Mx My
1C2 1 -44.5 0.0 -1.6 G+Q *F
2 -44.5 0.0 -1.6 G+QP11 *F
3 -44.5 0.0 -1.6 G+QP12 *F
4 -44.5 0.0 -1.6 G+QP21 *F
5 -44.5 0.0 -1.6 G+QP22 *F
6 -44.5 0.0 -1.6 G+QP31 *F
7 -44.5 0.0 -1.6 G+QP32 *F
8 -44.5 0.0 -1.6 G+QP41 *F
9 -44.5 0.0 -1.6 G+QP42 *F
10 -44.5 0.0 -1.6 G+QP51 *F
11 -44.5 0.0 -1.6 G+QP52 *F
12 -44.5 0.3 -1.6 G+Q+Wx+Nx
13 -44.5 -0.3 -1.6 G+Q-Wx-Nx
14 -44.5 0.0 -1.4 G+Q+Wy+Ny
15 -44.6 0.0 -1.8 G+Q-Wy-Ny
16 -44.5 0.3 -1.6 G+Wx+Q+Nx
17 -44.5 -0.3 -1.6 G-Wx+Q-Nx
18 -44.5 0.0 -1.4 G+Wy+Q+Ny
19 -44.6 0.0 -1.8 G-Wy+Q-Ny
20 -35.6 0.2 -1.3 G+Wx+Nx
21 -35.6 -0.2 -1.3 G-Wx-Nx
22 -35.6 0.0 -1.1 G+Wy+Ny
23 -35.7 0.0 -1.4 G-Wy-Ny
1C5 1 -38.9 0.0 -1.1 G+Q *F
2 -38.9 0.0 -1.1 G+QP11 *F
3 -38.9 0.0 -1.1 G+QP12 *F
4 -38.9 0.0 -1.1 G+QP21 *F
5 -38.9 0.0 -1.1 G+QP22 *F
6 -38.9 0.0 -1.1 G+QP31 *F
7 -38.9 0.0 -1.1 G+QP32 *F
8 -38.9 0.0 -1.1 G+QP41 *F
9 -38.9 0.0 -1.1 G+QP42 *F
10 -38.9 0.0 -1.1 G+QP51 *F
11 -38.9 0.0 -1.1 G+QP52 *F
12 -38.9 0.2 -1.1 G+Q+Wx+Nx
13 -38.9 -0.2 -1.1 G+Q-Wx-Nx
14 -39.0 0.0 -0.9 G+Q+Wy+Ny
15 -38.8 0.0 -1.3 G+Q-Wy-Ny
16 -38.9 0.2 -1.1 G+Wx+Q+Nx
17 -38.9 -0.2 -1.1 G-Wx+Q-Nx
18 -39.0 0.0 -0.9 G+Wy+Q+Ny
19 -38.8 0.0 -1.3 G-Wy+Q-Ny
20 -31.1 0.2 -0.9 G+Wx+Nx
21 -31.1 -0.2 -0.9 G-Wx-Nx
22 -31.2 0.0 -0.7 G+Wy+Ny
23 -31.0 0.0 -1.0 G-Wy-Ny
1C8 1 -39.7 0.0 -1.6 G+Q *F
2 -39.7 0.0 -1.6 G+QP11 *F
3 -39.7 0.0 -1.6 G+QP12 *F
4 -39.7 0.0 -1.6 G+QP21 *F
5 -39.7 0.0 -1.6 G+QP22 *F
6 -39.7 0.0 -1.6 G+QP31 *F
7 -39.7 0.0 -1.6 G+QP32 *F
8 -39.7 0.0 -1.6 G+QP41 *F
9 -39.7 0.0 -1.6 G+QP42 *F
10 -39.7 0.0 -1.6 G+QP51 *F
11 -39.7 0.0 -1.6 G+QP52 *F
12 -39.7 0.3 -1.6 G+Q+Wx+Nx
13 -39.7 -0.3 -1.6 G+Q-Wx-Nx
14 -39.6 0.0 -1.4 G+Q+Wy+Ny
15 -39.8 0.0 -1.8 G+Q-Wy-Ny
16 -39.7 0.3 -1.6 G+Wx+Q+Nx
17 -39.7 -0.3 -1.6 G-Wx+Q-Nx
18 -39.6 0.0 -1.4 G+Wy+Q+Ny
19 -39.8 0.0 -1.8 G-Wy+Q-Ny
20 -31.7 0.3 -1.3 G+Wx+Nx
21 -31.7 -0.2 -1.3 G-Wx-Nx
22 -31.7 0.0 -1.1 G+Wy+Ny
23 -31.8 0.0 -1.4 G-Wy-Ny
1C12 1 -28.4 0.0 -1.4 G+Q *F
2 -28.4 0.0 -1.4 G+QP11 *F
3 -28.4 0.0 -1.4 G+QP12 *F
Project: ABBATOIR
Project: ABBATOIR - CONSTRUCTION OF NEW VIP TOILET, ATBATOIR & MARTKET STALLSWATCHER'S HUB (*1KC-ZXJZ-W64Z-MXE8)
PAD/PILE FOOTING RESULTS Orion Building Design System 18.0 (04.2012) / Page: FTG-2
Project: ABBATOIR