Based on:
Generic - Literature, Experience at other locations
Identify Potential Failure
Licensor's Recommendations
Mechanisms & Occurence
Past History
Regulations Decide Inspection Frequency Decide Process Parameters for Adoption of Risk Mitigation
Monitoring, Set Limits Measures
General, Localised,
Internal, External Decide Inspection Areas Fix Schedule & Responsibility
- Reduce Process Inventory
- Modify Process
Invasive, Online Sources: - Emergency Isolation
Decide Inspection Type
DCS, IP21, LIMS, Field Monitor defined Parameters - Eqpt. Redesigning
- Eqpt. Repair / Replacement
- Any Other
Prepare Inspection Checklist
No
Deviation from Operating
Prepare Inspection Schedule Window is beyond set limits?
Yes
Any Unexpected
Carry Out Inspection Failures?
No
Yes
No
FAR required?
Are findings consistent with No Yes
predicted probability of
Yes deterioration? FAR Process Corrective Repair
Rev-1
Factors:
- No. of available past Insp.
Observations
Inspection Confidence Ranking
- No. of Unexpected Failures
- Accessibility for Inspection
HAZOP/ QRA / Potential Scenario:
FMEA / ETA - Size of Flaw
Factors: - Extent of Rupture
- No. of Start / Stops
Plant Operations Confidence Ranking
- No. of Operating Window violations
Estimate Spread - Personnel Safety
- Environment
- Corporate Image
- Secondary Damage
Loss (Currency terms)
- Localized failure
Service :
- Production Loss
Corrosive Fluid
Abrasives
Pressure, Temperature, Velocity Probability of Failure A Consequence Category
Factors:
- SCC
- HIC
- Embrittlement Failure Mechanisms
- Creep
- Fatigue