Criteria Abbreviation Formula or Value for

and Dimension Dimensioning


Design Horizon 2005 2015
Population Data
Basic Population P0 [inh.] 2000: 152456
Population Growth [% p.a.] 2000 - 2005 4.5%
2005 - 2010 4.6%
2010 - 2015 4.0%
Population in Project Area P [inh.] 190,289 289,400

Supply Within Project Area


House Connection [% of P] 8.7% 8.8%
Yard Connection [% of P] 14.3% 15.0%
Public Standpipe [% of P] 39.5% 44.6%
No Supply [% of P] 37.5% 31.6%

House Connection P [inh.] 16,481 25,602


Yard Connection P [inh.] 27,157 43,487
Public Standpipe P [inh.] 75,215 129,070
No Supply P [inh.] 71,436 91,242

Specific Water Demand


House Connection [l/c/d] 150
Yard Connection [l/c/d] 40
Public Standpipe [l/c/d] 20
Commercial / Industrial [l/c/d] 50 - 250
Institutional [l/c/d] 5 (day), 20 (boarding)

Losses
Distribution Losses [% of net demand] 25
Treatment Plant Use [% of demand] 5

Net Water Demand


Average Day Demand Qd [m3/d] 10,266 15,592
Maximum Day Demand Qd, max [m3/d] 12,319 18,711
3
Peak Hour Demand Qh, max [m /h] 214 325

Raw Water Pump Capacity


Raw Water Pumps (2 duty + 1 Standby) Qh [m3/h] 410

Treated Water Pump Capacity


High Level Pumps (2 duty + 1 Standby) Qh [m3/h] 180
Low Level Pumps (2 duty + 1 Standby) Qh [m3/h] 209

Storage Capacity
High Level
Demand Balancing V [m3] 1,773
Fire and Emergency V [m3] 1,227
Total Volume V [m3] 3,000

Low Level
Demand Balancing V [m3] 2,063
Fire and Emergency V [m3] 1,937
Total Volume V [m3] 4,000

Maximum Pressures
Maximum Static Pressure p [bar] 7
Minimum Dynamic Pressure p [bar] 0.7

Average Time of Operation t [h/d] 24

Source: Project estimates.