Professional Documents
Culture Documents
Raja Waqas
Raja Waqas
Phone # +92-345-6374218
Email# rajawaqas624@gmail.com
N.I.C #: 82203-8613748-9
Permanent Address: p/0 kohala district Muzaffarabad Azad Kashmir
Date of Birth: 25 MAY 1990
Fathers Name: RAJA MUHAMMAD ILYAS
Marital Status: Married
OBJECTIVE
To join a dynamic and progressive organization offering ample opportunities for
diversified experience as a “site Engineer". Seeking a position that will ensure continued
professional growth, offered by an environment in which advancement is based on the
strength of individual contribution to the realization of organization goals.
ACADEMIC QUALIFICATIONS
1
CAREER SUMMARY
2
geological face mapping, probe hole drilling for rock support evaluation
by using Q-system,1st layer shotcrete(plain or fire reinforced) by
shotcrete jumbo, installation of rock bolt, steel ribs or installation of bar
anchor or strained anchor and lattice girder in week zone, wire
mashing, and then 2nd layer shotcrete and finally concrete lining of
underground Power house, transformer hall, penstocks, draft tubes,
bus bars tunnel, tailrace tunnel, headrace tunnel, adit tunnels, cable
tunnels, access tunnels, surge tunnel, bypass tunnel, headrace surge
branch tunnel, drainage gallery, drainage adit, water tanks according
to drawing provided. Also install a extensometer that analysis and
record the convergence, deformation and settlement of tunnel with
time being.
Also have responsibility to execute the geotechnical field and lab test
like pull out test, shotcrete bond test, shotcrete thickness test, Packer
test , Borehole Permeability Testing, Pumping tests, Shear test, ,
Geological & Geothermal prospecting and rock bed level, Field Density
test, Sand Equivalent, Los Angeles’ Abrasion, Crushing value, Specific
gravity test, Sedimentation of Grout, Sieve analysis of coarse & fine
aggregate, Sieve analysis of soil, Unit weight test, Compressive
strength test for shotcrete cores & grout cube, Concrete trial mix
design test.
Also have a working experience on measureable BOQ and calculation
of quantities of steel, concrete, shotcrete, rock bolts, wire mesh,
formwork, according to the drawing specifications.
Coordinate with sub engineers, surveyors, foreman and labors to
develop the `strategy of work.
Making the monthly work progress report in accordance with the
scheduled activities.
Inspection of Coffer Dam.Inspection of internal road work
3
Inspection of earth work, stone pitching ,Loose Stone Apron,Concrete Blocks
and concrete for protection work at Kaitu River
Bond test, thickness test, core test, rebound test, pull out test of grouted and un-
grouted rock bolts and paper work for above mentioned tests.
Initial setting time test finial setting time test compaction factor test slum test
Responsible for the preparation of various quantity requests of tunnel work