You are on page 1of 3
Assignment-02: BRACED CUT y of a braced cut design in geotechnical engineering [1] Explain the neces 2] Why the conventional earth pressure theories do not prevail in the braced cut design [3] A renowned group of companies is planning to construct a 22-story commercial building at Agrabad, Chattogram. The architectural and structural design has finished recently. The structural a total of two basements, where the deeper depth is 7.0m below the current ground drawing depi level. The narrow side of the proposed structure is 10.2m, and the perpendicular side is about 18.0m. To prevent the failure of side soils, itis necessary to construct a temporary bracing system of the entire area. Unfortunately, the structural designer did not provide a detailed section of the bracing system. Under the above circumstances. design an appropriate bracing system. Input Data. The geotechnical parameters of the proposed site is given below Depth Unit Weight) ¢ | Oo | General Description of Strate 5 | | (m) (kN/m?) | (kPa) | (Degree) 0.0—2.0 | Brown Soft Clayey Soils — 2 16.3 24.0 | 29.8 Page 1 of 1 ssignment-03: DRILLED PIER [1] State the suitability of Drilled Pier over Conventional Pile Foundation [2] Describe in detail the different construction methods of drilled pier {3] A 180.0m RCC bridge is to be constructed over the Sangu River, which is a part of the proposed cmss-bonder mad. The geotechnical profile of the sub-soil is shown in the following figure. Borehole Log Cheat CCusagng Hill Tet Development Board Locanen | Bandartan Borehole No: 01 ‘Reduced Level: 0.0 fom existing ground level Date 12022020 Water Tales ~~ from existing wound level = [Ee] 2 5] pescripton orstrata JE 2/ 22] encouncered Standard Penetation Test dali No. of blows.30 cx D 0 10 20 3 0 50 @ > | formset mtn i RET SJ clayey sos wth Low : | Pp Plasticity ott} 2 : D D D D] 2 | Extenceorstate D D "Send oftorng Page 1 of 2 A total of tive boreholes were drilled near the bridge site. and a similar geologic profile was seen. Therefore, the above borehole log is representative of the entire site. Based on the in-situ geotechnical parameters, determine the size of the drilled shaft. Also, determine the load-carrying capacity for a settlement of 12.0mm. Input Data. SI Load (KN) SI Load (KN) 3420 26 4071.6 3304.7 27 41259 Page 2 of 2

You might also like