2500
500 B C
80 PSC BEAM PSC BEAM PSC BEAM PSC BEAM
2000
A PSC BEAM PSC BEAM
PSC BEAM fr fx PSC BEAM
PSC BEAM fx fr PSC BEAM
fx PSC BEAM PSC BEAM
fr
RETAINING WALL fr fx PIER DETAIL
CH:720.000
t2
FNL FNL FNL FNL FNL FNL FNL
FNL FNL FNL FNL FNL FNL
Level Datum =515.000 A1 P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 A2
526.773
526.483
526.232
526.021
525.850
525.718
525.626
525.573
525.559
525.586
525.651
525.757
525.901
526.086
526.309
526.572
526.848
527.124
527.400
527.676
527.952
528.224
528.471
528.688
528.875
529.034
529.162
529.261
529.331
529.371
529.382
529.363
529.315
529.238
529.130
528.994
528.828
528.632
528.411
528.186
527.961
527.736
527.511
527.286
527.061
526.836
526.611
526.386
526.161
525.936
525.711
525.486
525.261
525.036
FRL
521.397
521.399
521.413
521.428
521.426
521.350
521.275
521.201
521.146
521.095
521.046
521.043
521.017
520.975
520.964
520.958
521.019
521.007
520.977
520.917
520.885
520.904
520.927
520.948
520.976
521.034
521.665
521.479
521.519
521.318
521.243
521.221
521.203
521.208
521.219
521.237
521.265
521.294
521.330
521.382
521.358
521.341
521.244
521.141
521.072
520.939
520.818
520.736
520.642
520.552
520.422
520.322
520.293
520.247
OGL
430.000
440.000
450.000
460.000
470.000
480.000
490.000
500.000
510.000
520.000
530.000
540.000
550.000
560.000
570.000
580.000
590.000
600.000
610.000
620.000
630.000
640.000
650.000
660.000
670.000
680.000
690.000
700.000
710.000
720.000
730.000
740.000
750.000
760.000
770.000
780.000
790.000
800.000
810.000
820.000
830.000
840.000
850.000
860.000
870.000
880.000
890.000
900.000
910.000
920.000
930.000
940.000
950.000
960.000
Chainage
TOWARDS
LB NAGAR(NH-9)
A2
. OF FLYOVER P11
P10
P5 P6 P7 P9
CRASH BARRIER
P3 5000(TYP) P4 P8
TOWARDS P2
P1
900
SHAMSHABAD CH OVERLAP
EXISTING APPROA
SLOPE
A1
500 15500
700
800
A
300
SLOPE
16500
600
3500
DRAINAGE SPOUT(TYP) HALF PLAN AT TOP HALF PLAN AT BOTTOM
500
BORELOGS
500
PLAN
CRASH BARRIER
250
C.
L OF FLYOVER 100
LONG. GIRDER
250
.OF BEARING 100
16500 (OVER ALL WIDTH) 500 15500 (C/W) 500 500 15500 (C/W) 500 80
250
.OF EXP. JOINT 65THK. WEARING COAT 65THK. WEARING COAT 210 250
500 500 15500 (C/W) 500 500
1750
3500 80 .OF BEARING 500 500 250
1750
65THK. WEARING COAT FRL FRL FRL FRL 210 210
250 1000
300
500
1750
2.5% SLOPE 2.5% SLOPE 2.5% SLOPE 2.5% SLOPE 500 500
FRL FRL
250
250
500
2.5% SLOPE 2.5% SLOPE 100
2000
1750
1750
300THK. APPROACH 100 15.00 15.00 15.00
250
300 2750 2750 2750 2750 2750 2750 2750 2750 2750 2750
SLAB OVER 100THK. PCC
2750 2750 2750 2750 2750 CROSS
300
CROSS
1000
2500 DIAPHRAGM
1250 1000
1000
1000
2500
300
1350 750 6875 6875 750 750 6875 6875 750 DIAPHRAGM 500x2000
1350 500x2000
LEGEND:-
RETURN
1250
1000
1000
1250
WALL 15250 MEDIUM DENSE REDDISH SAND
15250 WITH CLAY
1200
1200
2500 2500 DENSE REDDSIH SAND WITH CLAY
16500
1000
DEPTH OF FOUN.
DETAIL - `B' DETAIL - `C'
500
500
C.S OF ABUTMENT- A1 & A2 (OVER PIER (OVER PIER
12501000
1250750
_ 4000
_ 4000
3000 3000 (CONTINUOUS) (EXP. JOINT)
NOTES:-
FNL FNL
~
~
1. ALL DIMENSIONS ARE IN MM AND ALL LEVELS ARE IN METERS.
10500x10500 9500x9500 2. DO NOT SCALE THE DRAWING. FOLLOW WRITTEN DIMENSIONS ONLY.
150THK. PCC M15 150THK. PCC M15 3. READ THIS DRAWING WITH ROAD ALIGNMENT DRAWING.
C.S OF PIER(FIXED) C.S OF PIER(FREE &EXP. JOINT) 4. GRADE OF CONCRETE & CLEAR COVER TO OUTERMOST STEEL
C.
L OF FLYOVER SUPER STRUCTURE
16500 PSC BEAM PSC M45 40mm
500 7500(C/W) 500 7500(C/W) 500 C.
L OF FLYOVER CAST IN SITU SLAB RCC M45 40mm
16500 SUB STRUCTURE RCC M35 50mm
500 7500 (C/W) 500 7500(C/W) 500 TOWARDS TOWARDS
SHAMSHABAD LB NAGAR(NH-9) PIER RCC M35 50mm
TO BE DISMANTLED TO BE DISMANTLED
EXISTING FLYOVER 145M 3x30=90M 3x30=90M 3x30=90M 3x30=90M 170M PIER CAP RCC M40 50mm
TO BE DISMANTLED SLOPE SLOPE
SLOPE SLOPE WMM EXISTING APPROACH VIADUCT OBLIGATORY VIADUCT VIADUCT PROPOSED APPROACH FOUNDATION RCC M35 75mm
WMM
GSB
OVERLAP PORTION SPAN PORTION PORTION
GSB SUB GRADE PCC PCC M15 -
SUB GRADE
CH:720.000
CRASHBARRIER RCC M40 40mm
APPROACH SLAB RCC M30 40mm
HBS
HIGHWAYS - BRIDGES - STRUCTURES