0% found this document useful (0 votes)
674 views6 pages

Sop NPD

This document outlines the standard operating procedure for product development at EMMFORCE INC. It details 18 steps in the process including issuing sample numbers, dismantling samples, feasibility checks, costing, project kickoff, releasing bills of materials and development plans, procuring materials, design drawings, component development, assembly and testing, sample submission, feedback, design reviews, and releasing designs for production. Key responsibilities and timelines are assigned for each step, with controls to ensure quality and prevent errors.

Uploaded by

Satya Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
674 views6 pages

Sop NPD

This document outlines the standard operating procedure for product development at EMMFORCE INC. It details 18 steps in the process including issuing sample numbers, dismantling samples, feasibility checks, costing, project kickoff, releasing bills of materials and development plans, procuring materials, design drawings, component development, assembly and testing, sample submission, feedback, design reviews, and releasing designs for production. Key responsibilities and timelines are assigned for each step, with controls to ensure quality and prevent errors.

Uploaded by

Satya Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
  • SOP- Product Development
  • Design Review
  • Procedural Form
  • SOP- Product Development Form
  • Responsibility and Timeline Form
  • Warning Control Points

EMMFORCE INC

Title: SOP- PRODUCT DEVELOPMENT Doc. No: SOP-EG-01 REV No: 00 Date: 25.07.2018
Control Point
Document / Format (POKA YOKE)
Sr. No. Action Responsibility Timeline
Reference
Control PY Warning PY
Design With in 2 days from
1 Issue of Sample number
Engineer receipt of sample
QP-WI-01
Design With in 7days from
2 Dismantling of Sample assembly & Creation of BOM
Engineer receipt of sample
With in 15 days from
3 Check product feasibility according to Machinery, Capacity & resources available CFT QP-WI-03
receipt of sample
With in 20 days from
4 Costing of product & sent offer to marketing including all expenses & profit HOD
receipt of sample

5 Project kick off Marketing Weelky Project meeting

Design With in 5 days from Kick


6 Release BOM & Create part codes in ERP ERP
Engineer off project
Design With in 10 days from
7 Prepare & Release development Plan
Engineer Kick off project
Design With in 5 days from Kick
8 Indent for Raw material & special tooling, if required
Engineer off project
Design
9 Release of design drawings As per development plan QP-WI-02
Engineer
Design
10 Release of process drawings As per development plan
Engineer
Design
11 Release of Fixtures drawings, if required As per development plan
Engineer

12 Development of components Prod./Pur As per development plan

13 Inspection of Components QA As per development plan

Design Engineer/
14 Assembly & Testing of developed product As per development plan
assembly
Design
15 Sample Submission As per development plan QP-WI-04
Engineer

16 Feedback/Order from customer Marketing

Design With in 5 days from


17 Review Design, if required QP-WI-05
Engineer/ HOD feedback/roder
Design With in 5 days from
18 Release Design & Process for production
Engineer/ HOD feedback/roder

Prepared By Reviewed By Approved By


EMMFORCE INC DESIGN REVIEW

PROJECT DESCRIPTION
COMPONENT

1. FAILURE HISTORY

2. PARAMETERS REVIEWED

3. PROTOTYPING PLAN 1 5 25 Review after planned qty.


4. MATERIAL TO BE USED
5. HEAT TREATMENT

6. MATING PARTS REVIEW

7. RUST PREVENTIVE
8. SAMPLE APPROVAL
9. PROCESS REVIEW
10. ASSEMBLY TOOLING

11. SPECIAL INSTRUCTION:

12. OTHERS
Design Engineer Design Mgr. V.D. HOD (Engineering)
Document: QP-WI-05
REVISION: 0
Ref. No: DR/
Date:

after planned qty.


EMMFORCE INC
Title: SOP- PRODUCT DEVELOPMENT

Sr. No. Action

10

11

12

13

14

15

16

17

18

Prepared By
EMMFORCE INC
Doc. No: SOP-EG- REV No: 00 Date: 25.07.2018
Control Point
Document / Format (POKA YOKE)
Responsibility Timeline
Reference
Control PY
Design
Engineer
Design
Engineer

HOD

Reviewed By Approved By
e: 25.07.2018
rol Point
(POKA YOKE)
Warning PY

ved By

EMMFORCE INC
Title:
SOP- PRODUCT DEVELOPMENT
Doc. No:  SOP-EG-01
REV No: 00
Date: 25.07.2018
Sr. No. Action
Responsibility
Ti
EMMFORCE INC
PROJECT DESCRIPTION
COMPONENT
1. FAILURE HISTORY
2. PARAMETERS REVIEWED
3. PROTOTYPING PLAN
1
5
25
Review after
Document: QP-WI-05
REVISION: 0
Ref. No: DR/
Date: 
after planned qty.
EMMFORCE INC
Title:
SOP- PRODUCT DEVELOPMENT
Sr. No. Action
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Prepared By
EMMFORCE INC
Doc. No:  SOP-EG-
REV No: 00
Date: 25.07.2018
Responsibility
Timeline
Control PY
HOD
Reviewed  By