Introduction
Car park it’s an arrangement to cater for proper alignment of the vehicles within the
environment fraternity. However, the arrangement of the design is a major factor when
developing the car park in the compound of a building. Parking is important in the proposed
project because it will have a positive impact on the advancement relationship between the
streets and adjoin the spaces. Parking is a key and a compulsory aspect that should be considered
when designing the car park project. Well-organized and proper management of the car park will
help in ensuring that there is a safe environment for the children and functional operation for
drivers. The process of integrating the car park with the overall project design and the
with a quality mixed design, the car park design and where the site is located should be
implemented together with the building. Nevertheless, a well-designed car park will ensure that
there are easy response and hence will contribute to positive impacts on its built environment. So
as to ensure that the engineers of the car park achieve the targeted design of the car park they
should have a detailed knowledge of the existing site conditions and the wider area. The design
statement of the building is a very important tool in the construction of the car park since it’s the
one that will be followed as a manual for effective procedures of uncovering the given
architectural design. The design map or the architectural drawing is explained in detail on the
design statements for the car park. The main entrance towards the area where the car park is
located must be clearly legible, without using much of the space or dominating the building
structure. However, the facial design look of the entrance must be developed to supplement the
building's front phase. If the entrance is poorly designed it can lead to misunderstanding and
In the process of designing and building the car park, there are several factors that need to
consider for the proper provision of parking on a building. Therefore, the suitable solutions
towards the construction will be contingent on the type of project and factors which include the
following.
The value of the Land: The value of the land at which the facility is constructed will help to
determine if the car park will be developed in the basement, stacked or elevated.
Car park location should be measured in the early stages of the design process since it affects
most of the key elements of a building which comprise street frontages, access, and structural
grids.
Car Park demand and type of vehicle: The demand for the parking space is a key factor
contributing to wills the total parking area required for the development of the park. However,
the car park design should consider all types of vehicles so that in future any type of vehicle can
The car park dimensions & planning controls: The design plan of the crèche building will help
Semi-basement
The unavailability of space within the compound will force the engineers to design the
car park in the basement of the building which is believed to be underground parking. However,
the basement car park is designed by parking area partly below ground level that’s through the
partial basement of the building or the outside area of the building opposite to the facility. The
nature of the basements is that they require waterproofing, substructure and less excavation as
compared to the full underground parking (Litman, 2018). Semi-basement parking can help solve
certain site-specific issues. The semi-basement car parks are mostly suitable for the buildings
that have a water table that inhibits the development of deeper basements. Nevertheless, the
semi-basement car park is consistently due to the ground floor that is raised above the street
level. This is a significant approach for the car park because of its raised level and it helps in
avoiding security issues to ground floor areas while it offers a greater outlook of the entire
this raised ground level since it will make it hard for the disabled to have access for wheelchair
or pushchair users. Where the car park is located it should sit above the ground level ventilation
grilles and must be merged into the front phase of the area or landscape design to reduce the
seen from a long distance while the vehicle is approaching. However, the drivers of the vehicle
require sufficient time to be able to identify the car park entrance and move towards it, mostly
when the lane change is required. Nevertheless, a good balance is key to creating a noticeable car
park entrance panel without using a lot of eyesores. In the implementation of the car park, we
consider coming up with a design set up which will incorporate the architectural design elements
The design statement of the building is a very important tool in the construction of the car
park since it’s the one that will be followed as a manual for effective procedures of uncovering
the given architectural design. The design map or the architectural drawing is explained in detail
on the design statements for the car park. The main entrance towards the area where the car park
is located must be clearly legible, without using much of the space or dominating the building
structure
The car park design should not have oversized care entrances that create large holes in
the buildings font phase. The implementation of recess car park entrance design is a high
standard design for the parking area design (Patel, 2017). However, the masquerade garage
security grilles should also be included so as to complement the crèche project design proposal.
The areas at which doors are not available, therefore it’s important to ensure that the interior
design of the car park is visible and it can only be done by incorporating the façade design with
In the crèche compound, there are footpaths through which vehicles can cross through
and hence it’s important to minimize the access points by the vehicles to ensure that safety of the
pedestrians is cared for. However, it is important to locate the car park entrance to the far ends of
the main streets and service lines so as to avoid disrupting the movement of pedestrians in the
footpaths. Ensuring that there are clear sightlines through which the pedestrian and vehicle cross
through is important because will ensure safety for all the people within the crèche compound.
Clear sightlines can be implemented through developing drawing backs to the walls that
are adjacent to the driveway by giving provision of glazing slots in the car park walls.
Nevertheless, it’s important to use speed pumps and other appropriate traffic management
measures to slow down vehicles when they are moving cross all pedestrian areas, particularly at
the end of long slopes where drivers could gain speed before emerging from basements.
Implementing the use of the rule of the thump
To locate car entrances areas that are away from the pedestrian street areas and on
secondary lines it’s important to use the rule of the thump to make it much easier. However, car
access roads must be developed and implemented in the estimated dimensions that will make
floor parking should be sleeved with active edges. The car park ground level takes out the
requirement for bump space inclines, costly structures and water-sealing, and is in this manner a
In any case, there is a natural clash in giving leaving at road level where it interfaces with
people in general and person on foot domain as this can bring about vehicle commanded and
regularly dull dormant road frontages. Where ground floor stopping is essential, it ought not be
given promptly adjoining lanes and other open regions. To keep up a positive road interface,
Minimum recommended width dimensions for a typical passenger car are as follows:
Minimum recommended height clearance dimensions for vehicle access are as follows:
It’s important to note that, that the hired engineers must be able to offer specifically the good car
park dimensions as per the crèche building so as to achieve lower head height clearances, for
building any structure. For a building to be successful, the plans, specs have to be followed and
stick to them. Following the plan will give a better budgeting and what materials would be
needed for the construction of the car park. This also helps in getting a rough idea of how the
completed project would look like. The car park design should encourage driver’s social,
physical and intellectual development through the creativity and learning from care givers and
other children in the facility. The car park design should always encourage and highlight a high
quality safety and care of the children within the facility. A well thought street and lane design
will address the requirements for the vehicles and cars so as to make the people within the
Conclusion
In conclusion, the car park design should be well-organized and proper managed to help
in ensuring that there is a safe environment for the children and functional operation for drivers.
The process of integrating the car park with the overall building design and the environment
creates a conducive working environment in the facility. To be able to come up with a quality
mixed design, the crèche design and where the site is located should be implemented together
with the building. The method used in the development of the car park will foster a coherent and
good quality vicinity that’s open with spaces, and with a reliable character and distinct identity
for the car park. Nevertheless, a well-designed car park will ensure that there are easy response
References
Chahade, T., Schober, K. U., & Morillas, L. (2019). Interactive structural design of hyperbolic
Patel, R. (2017). Putting people first: an architectural approach to improving the quality of life
86-225). Routledge.