You are on page 1of 8

Document & Drawing Control Index

PROJECT : UPGRADATION OF FIRE PROTECTION SYSTEM FOR CPF GANDHAR & CTF ANKLESHWAR
OWNER : OIL AND NATURAL GAS CORPORATION LIMITED
LSTK CONTRACTOR: INDUS PROJECTS LTD.
AREA : CTF ANKLESHWAR

CONTRACT NO.: NOA no DLH/OES/MM/UGFPS_ANK/X11KC13003/2013 Dated 04.11.2013

0 28.04.2015 PD RP SLH DCI-ANK


B 09.04.2015 PD RP SLH DCI-ANK
A 04.02.2015 PD RP SLH DCI-ANK
REV Date PRPD By CHKD By APPD By Description Project Mgr
Engg
Subcontractor
LSTK Contractor Client

R. P. ENGINEERS
DOCUMENT & DRAWING CONTROL INDEX & PROJECT
ANKLESHWAR CONSULTANTS
PVT. LTD.

Document No. Rev


IPL-1600-J105-ANK-DCI-01 0
UPGRADATION of FIRE PROTECTION SYSTEMS AT ANKLESHWAR ASSET
R. P. ENGINEERS & PROJECT CONSULTANTS PVT. LTD.
Document Control Index for Ankleshwar
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
SOFT PDF REMARKS
STATUS PDF

PRE ENGINEERING (10% of Design


A Weightage 5%)

1 GENERAL IPL-1600-J105-ANK-GEN-201 Pre-Engineering Survey Report A Comments

B 80% of Design Weightage 5%

B1 GENERAL (2.5640% of 80% of


Design Weightage 5%)

1 GENERAL IPL-1600-J105-ANK-GEN-202 Operation and Maintenance Manual I

2 GENERAL IPL-1600-J105-ANK-GEN-203 Pipe MTO for Fire Water Network I Approved

3 GENERAL IPL-1600-J105-ANK-GEN-204 Pipe MTO for Water Spray System I Approved

4 GENERAL IPL-1600-J105-ANK-GEN-205 Plot Plans I Approved

5 GENERAL IPL-1600-J105-ANK-GEN-206 Valve MTO for Fire Water Network I Approved

6 GENERAL IPL-1600-J105-ANK-GEN-207 Valve MTO for Water Spray System I Approved

B2 PROCESS (21.1530% of 80% of


Design Weightage 5%)

1 PROCESS IPL-1600-J105-ANK-PRO-201 Hydraulic Calculations for Fire Water Network R Approved

Hydraulic Calculations for Spray Water System for


2 PROCESS IPL-1600-J105-ANK-PRO-202 R Approved
5000 M3 Capacity Crude Oil Tank

Hydraulic Calculations for Spray Water System for


3 PROCESS IPL-1600-J105-ANK-PRO-203 2000 M3 Capacity Crude Oil Tank R Approved

Hydraulic Calculations for Spray Water System for 90


4 PROCESS IPL-1600-J105-ANK-PRO-204 M3 Capacity Oil Tank R Approved

Hydraulic Calculations for Spray Water System for 400


5 PROCESS IPL-1600-J105-ANK-PRO-205 R Approved
M3 Capacity Oil Tank

Hydraulic Calculations for Spray Water System for


6 PROCESS IPL-1600-J105-ANK-PRO-206 2000 M3 Capacity Wash Tank R Approved

Hydraulic Calculations for Spray Water System for


7 PROCESS IPL-1600-J105-ANK-PRO-207 Compressor House R Approved

Hydraulic Calculations for Spray Water System for 16


8 PROCESS IPL-1600-J105-ANK-PRO-208 R Approved
M Dia. LPG Sphere

9 PROCESS IPL-1600-J105-ANK-PRO-209 Hydraulic Calculations for Spray Water System for 14 R Approved
M Dia. LPG Sphere

Hydraulic Calculations for Spray Water System for Lube


10 PROCESS IPL-1600-J105-ANK-PRO-210 Oil Drum Area R Approved

11 PROCESS IPL-1600-J105-ANK-PRO-211 Hydraulic Calculations for Spray Water System for Oil R Approved
Pump House

Hydraulic Calculations for Foam System for 5000 M 3


12 PROCESS IPL-1600-J105-ANK-PRO-212 R Approved
Capacity Crude Oil Tank

13 PROCESS IPL-1600-J105-ANK-PRO-213 Hydraulic Calculations for Foam System for 2000 M 3 R Approved
Capacity Crude Oil Tank

14 PROCESS IPL-1600-J105-ANK-PRO-214 Hydraulic Calculations for Foam System for 90 M3 R Approved


Capacity Oil Tank

15 PROCESS IPL-1600-J105-ANK-PRO-215 Hydraulic Calculations for Foam System for 400 M 3 R Approved
Capacity Oil Tank

16 PROCESS IPL-1600-J105-ANK-PRO-216 Hydraulic Calculations for Foam System for 2000 M 3 R Approved
Capacity Wash Tank

17 PROCESS IPL-1600-J105-ANK-PRO-217 Equipment List I Commenrs

18 PROCESS IPL-1600-J105-ANK-PRO-218 P&ID of Fire Water Pump House A Approved

19 PROCESS IPL-1600-J105-ANK-PRO-219 P&ID of Fire Water Spray System for A Approved


Oil & Crude Oil Tanks

20 PROCESS IPL-1600-J105-ANK-PRO-220 P&ID of Fire Water Spray System for A Approved


Gas Compressor Plant

P&ID of Fire Water Spray System for


21 PROCESS IPL-1600-J105-ANK-PRO-221 LPG Spheres A Approved

P&ID of Fire Water Spray System for


22 PROCESS IPL-1600-J105-ANK-PRO-222 A Approved
Lube Oil Drum Area

P&ID of Fire Water Spray System for


23 PROCESS IPL-1600-J105-ANK-PRO-223 A Approved
Oil Pump House Area (Size 60 M X 11 M)

24 PROCESS IPL-1600-J105-ANK-PRO-224 P&ID of Foam System for Oil & Crude Oil Tanks A Approved

25 PROCESS IPL-1600-J105-ANK-PRO-225 P&ID of Foam Tank Filling System A Approved

26 PROCESS IPL-1600-J105-ANK-PRO-226 Process Datasheet for Main Fire Water Pump I Approved

27 PROCESS IPL-1600-J105-ANK-PRO-227 Process Data Sheet for Jockey Pumps I Approved

28 PROCESS IPL-1600-J105-ANK-PRO-228 Process Data Sheet for Fire Water Reservoir I Approved

29 PROCESS IPL-1600-J105-ANK-PRO-229 Process Datasheet for Foam Tank I Approved

30 PROCESS IPL-1600-J105-ANK-PRO-230 Process Datasheet for Foam Pump I Approved

31 PROCESS IPL-1600-J105-ANK-PRO-231 Process Data Sheets for Instruments I Approved

32 PROCESS IPL-1600-J105-ANK-PRO-232 Hazardous Area Classification Schedule R

33 PROCESS IPL-1600-J105-ANK-PRO-233 Cause & Effect Diagram A Approved

34 PROCESS IPL-1600-J105-ANK-PRO-234 P&ID of Fire Water Spray System for Pumps Handling A Approved
Petroleum Products at Desalting Plant

2 of 8
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
STATUS SOFT PDF PDF REMARKS

35 PROCESS IPL-1600-J105-ANK-PRO-235 P&ID of Fire Water Spray System for Pumps Handling A Approved
Petroleum Products at LPG Unit Area.

36 PROCESS IPL-1600-J105-ANK-PRO-236 P&ID of Fire Water Spray System for Manifold I & II A Approved

37 PROCESS IPL-1600-J105-ANK-PRO-237 P&ID of Fire Water Spray System for Unloading Zone-II A Approved
Area & Shed

38 PROCESS IPL-1600-J105-ANK-PRO-238 P&ID for Spray System for Oil Pit Near Water Softening A Approved
Plant

P&ID of Fire Water Spray System for Electronic Weigh


39 PROCESS IPL-1600-J105-ANK-PRO-239 Bridge & Mechanical Weigh Bridge With LPG Loading A Approved
Gantry

40 PROCESS IPL-1600-J105-ANK-PRO-240 P&ID of Fire Water Spray System for NGL Loading Point A Approved

41 PROCESS IPL-1600-J105-ANK-PRO-241 P&ID for Spray System for Naptha Tank A Approved

Hydraulic Calculation for Spray Water System for


42 PROCESS IPL-1600-J105-ANK-PRO-242 Naptha Tank R Approved

Hydraulic Calculation for Spray Water System for Oil


43 PROCESS IPL-1600-J105-ANK-PRO-243 Pit Area R Approved

P&ID of Fire Water Spray System for Compressor Shed


44 PROCESS IPL-1600-J105-ANK-PRO-244 in LPG Unit A Approved

45 PROCESS IPL-1600-J105-ANK-PRO-245

46 PROCESS IPL-1600-J105-ANK-PRO-246 Hydraulic Calculations for Fire Water Spray System for R Approved
Pumps Handling Petroleum Products at Desalting Plant

Hydraulic Calculations for Fire Water Spray System for


47 PROCESS IPL-1600-J105-ANK-PRO-247 R Approved
Pumps Handling Petroleum Products at LPG Unit Area

Hydraulic Calculations for Fire Water Spray System for


48 PROCESS IPL-1600-J105-ANK-PRO-248 R Approved
Manifold 1

49 PROCESS IPL-1600-J105-ANK-PRO-249 Hydraulic Calculations for Fire Water Spray System for R Approved
Manifold 2

Hydraulic Calculations for Fire Water Spray System for


50 PROCESS IPL-1600-J105-ANK-PRO-250 R Approved
Unloading Zone II Area & Shed

Hydraulic Calculations for Fire Water Spray System for


51 PROCESS IPL-1600-J105-ANK-PRO-251 R Approved
Electronic Weigh Bridge

Hydraulic Calculations for Spray Water System for NGL


52 PROCESS IPL-1600-J105-ANK-PRO-252 R Approved
Loading Point

53 PROCESS IPL-1600-J105-ANK-PRO-253 Hydraulic Calculations for Spray Water System for R Approved
Compressed Shed in LPG Unit

Hydraulic Calculations for Fire Water Spray System for


54 PROCESS IPL-1600-J105-ANK-PRO-254 R Approved
Mechanical Weigh Bridge With LPG Loading Gantry

PIPING (12.1790% of 80% of


B3 Design Weightage 5%)

1 PIPING IPL-1600-J105-ANK-PIP-201 Piping Material Specifications A Approved

2 PIPING IPL-1600-J105-ANK-PIP-202 Piping Hook Up Drawings A Approved

3 PIPING IPL-1600-J105-ANK-PIP-203 Equipment & Piping Layout for Fire Water Pump House A Approved

Layout of Fire Water Spray System for Crude Oil & Oil
4 PIPING IPL-1600-J105-ANK-PIP-204 I Approved
Tanks

Layout of Fire Water Spray System for Gas Compressor


5 PIPING IPL-1600-J105-ANK-PIP-205 I Comments
Plant

Layout of Fire Water Spray System for 2 Nos. Thermal


6 PIPING IPL-1600-J105-ANK-PIP-206 I
Safety Valves (3/4" x 1")

7 PIPING IPL-1600-J105-ANK-PIP-207 Layout of Foam System for Crude Oil & Oil Tanks I Approved

8 PIPING IPL-1600-J105-ANK-PIP-208 Layout of Foam Tank Filling System I Approved

9 PIPING IPL-1600-J105-ANK-PIP-209 Layout of Fire Water Spray System for LPG Spheres I Comment

Layout of Fire Water Spray System for Lube Oil Drum


10 PIPING IPL-1600-J105-ANK-PIP-210 I Approved
Area

11 PIPING IPL-1600-J105-ANK-PIP-211 Layout of Fire Water Spray System for Oil Pump House I Approved
Area (Size 60 M x 11M)

12 PIPING IPL-1600-J105-ANK-PIP-212 Data Sheet for Fire Hydrant I Approved

13 PIPING IPL-1600-J105-ANK-PIP-213 Data Sheet for Hose Cabinet, Hose Pipes And Hose I Approved
Couplings

14 PIPING IPL-1600-J105-ANK-PIP-214 Data Sheet for Water and Water cum Foam Monitor I Comments

15 PIPING IPL-1600-J105-ANK-PIP-215 Data Sheet for Piping Speciality Items I Approved

16 PIPING IPL-1600-J105-ANK-PIP-216 Piping Isometrics I Comment

17 PIPING IPL-1600-J105-ANK-PIP-217 Stress Analysis Report of FW Piping Network I Approved

18 PIPING IPL-1600-J105-ANK-PIP-218 Pipe Wall Thickness Calculation A Approved

19 PIPING IPL-1600-J105-ANK-PIP-219 Valve Material Specifications A Comment

20 PIPING IPL-1600-J105-ANK-PIP-220 Layout for MVW Spray System for Demulsification & I Approved
Desalting Area

Piping Layout of Spray System for Pumps and Columns


21 PIPING IPL-1600-J105-ANK-PIP-221 in LPG Unit I Approved

22 PIPING IPL-1600-J105-ANK-PIP-222 Layout for MVW Spray System for Manifold I & II I Approved

23 PIPING IPL-1600-J105-ANK-PIP-223 Piping layout of Fire Water Spray System for Unloading I Approved
Zone II Area & Shed

3 of 8
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
STATUS SOFT PDF PDF REMARKS

24 PIPING IPL-1600-J105-ANK-PIP-224 Piping Layout of Spray System for Oil Pit I Approved

Piping layout of Fire Water Spray System for Electronic


25 PIPING IPL-1600-J105-ANK-PIP-225 Weigh Bridge, Mechanical Weigh Bridge With LPG I Approved
Loading Gantry

Piping layout of Fire Water Spray System for NGL


26 PIPING IPL-1600-J105-ANK-PIP-226 I Approved
Loading Point

27 PIPING IPL-1600-J105-ANK-PIP-227 Layout of Fire Water Spray System for Naptha Tank A Approved

Piping layout of Fire Water Spray System for


28 PIPING IPL-1600-J105-ANK-PIP-228 Compressor Shed in LPG Unit I Approved

29 PIPING IPL-1600-J105-ANK-PIP-229 Pipe supports for Fire Water Network Layout (Overall) A Approved

Water sprinkler support calculation for oil and crudeoil


30 PIPING IPL-1600-J105-ANK-PIP-230 tanks (2000 m3) (Tag No. 9 to 12 and 14) I Approved

31 PIPING IPL-1600-J105-ANK-PIP-216A Isometric of fire water spray system for pumps I Approved
handling petroleum products at LPG Unit

32 PIPING IPL-1600-J105-ANK-PIP-216B Isometric of fire water spray system for oil pit I Approved

33 PIPING IPL-1600-J105-ANK-PIP-216C Isometric of foam system for crude oil and oil tanks I Approved

Water sprinkler support calculation for oil and crudeoil


34 PIPING IPL-1600-J105-ANK-PIP-232 I Approved
tanks (5000 m3)

35 PIPING IPL-1600-J105-ANK-PIP-233 Water sprinkler support calculation for oil and crudeoil I Approved
tanks (90 m3) (Tag No. 19 to 22)

Water sprinkler support calculation for oil and crudeoil


36 PIPING IPL-1600-J105-ANK-PIP-234 I Approved
tanks (400 m3) (Tag No. 15 to 17)

CIVIL (14.1020% of 80% of Design


B4
Weightage 5%)

1 CIVIL IPL-1600-J105-ANK-CIV-201 RCC Tank Design Calculations I Comments

2 CIVIL IPL-1600-J105-ANK-CIV-202 RCC Tank Layout & Details R Approved

3 CIVIL IPL-1600-J105-ANK-CIV-203 RCC Reinforcement Details A Approved

4 CIVIL IPL-1600-J105-ANK-CIV-204 Pump House Architectural Plan & Section Details R Approved

Pump House
5 CIVIL IPL-1600-J105-ANK-CIV-205 A Approved
RCC Details of Foundation & Columns

Approved
6 CIVIL IPL-1600-J105-ANK-CIV-206 Pump House I (hard copy
Structural Design Calculations not
received)

7 CIVIL IPL-1600-J105-ANK-CIV-207 RCC Details of Pump Foundation A Comments

8 CIVIL IPL-1600-J105-ANK-CIV-208 Substation R Approved


Architectural Plan & Section Details

Substation
9 CIVIL IPL-1600-J105-ANK-CIV-209 A Approved
RCC Details of Foundation & Columns

10 CIVIL IPL-1600-J105-ANK-CIV-210 Substation A


RCC Details of Super Structure

Substation
11 CIVIL IPL-1600-J105-ANK-CIV-211 I Approved
Structural Design Calculations

12 CIVIL IPL-1600-J105-ANK-CIV-212 Pipe Sleepers GA Layout & RCC Foundation Details A Approved

13 CIVIL IPL-1600-J105-ANK-CIV-213 Layout & Details of Site Grading, SWD & Roads I Comments

14 CIVIL IPL-1600-J105-ANK-CIV-214 RCC Details of SWD A Comments

15 CIVIL IPL-1600-J105-ANK-CIV-215 Design Calculations of SWD I Approved

16 CIVIL IPL-1600-J105-ANK-CIV-216 Layout & Details of Road Crossings I Approved

17 CIVIL IPL-1600-J105-ANK-CIV-217 General Notes, Legends & Abbrevations I Approved

18 CIVIL IPL-1600-J105-ANK-CIV-218 Structural Details for Steel Handrails, Walkway R

19 CIVIL IPL-1600-J105-ANK-CIV-219 Standard Details of Windows & Ventilators I Approved

20 CIVIL IPL-1600-J105-ANK-CIV-220 Standard Details of Doors I Approved

21 CIVIL IPL-1600-J105-ANK-CIV-221 Standard Details of Rolling Shutters I Approved

22 CIVIL IPL-1600-J105-ANK-CIV-222 Miscellaneous Structural Steel Details I

23 CIVIL IPL-1600-J105-ANK-CIV-223 Design Basis For New Fire Water Reservoir A

24 CIVIL IPL-1600-J105-ANK-CIV-224 Pump House Plan at 98.800 and Details of Trenches A

25 CIVIL IPL-1600-J105-ANK-CIV-205A Foundation and Details for Foam Tank A Comments

26 CIVIL IPL-1600-J105-ANK-CIV-202A Fire water reservoir platfom and details A Approved

27 CIVIL IPL-1600-J105-ANK-CIV-205B Plan and details of gantry girders A

28 CIVIL IPL-1600-J105-ANK-CIV-205C Truss and tie runner details R

4 of 8
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
STATUS SOFT PDF PDF REMARKS

29 CIVIL IPL-1600-J105-ANK-CIV-205D Platforms and details R

30 CIVIL IPL-1600-J105-ANK-CIV-205E Pump house plan at purlin level and details A

31 CIVIL IPL-1600-J105-ANK-CIV-225 DP Structure layout details of footing and pedestal I Approved

32 CIVIL IPL-1600-J105-ANK-CIV-209A Substation Layout Details A Approved

ELECTRICAL (25.64% of 80% of


B5 Design Weightage 5%)

1 ELECTRICAL IPL-1600-J105-ANK-ELE-201 Electrical Load List A Approved

2 ELECTRICAL IPL-1600-J105-ANK-ELE-202 Overall Key Single Line Diagram A Approved

3 ELECTRICAL IPL-1600-J105-ANK-ELE-203 Single Line Diagram of Mv Panel R Approved

4 ELECTRICAL IPL-1600-J105-ANK-ELE-204 Single Line Diagram of Hv Panel R Approved

5 ELECTRICAL IPL-1600-J105-ANK-ELE-205 Vendor Data Sheet of HV APFC Panel R Approved

6 ELECTRICAL IPL-1600-J105-ANK-ELE-206 Sizing Calculations APFC HV A Comment

7 ELECTRICAL IPL-1600-J105-ANK-ELE-207 Vendor Data Sheet of MV APFC Panel R Approved

8 ELECTRICAL IPL-1600-J105-ANK-ELE-208 Sizing Calculations APFC MV A Approved

9 ELECTRICAL IPL-1600-J105-ANK-ELE-209 Vendor Data Sheet of ASB R Approved

10 ELECTRICAL IPL-1600-J105-ANK-ELE-210 Vendor Data Sheet of Lighting Distribution Board R Approved

11 ELECTRICAL IPL-1600-J105-ANK-ELE-211 Vendor Data Sheet of Main Lighting Distribution Board I Approved

12 ELECTRICAL IPL-1600-J105-ANK-ELE-212 Sizing Calculations Power Transformer A Approved

13 ELECTRICAL IPL-1600-J105-ANK-ELE-213 Sizing Calculations Distribution Transformer A Approved

14 ELECTRICAL IPL-1600-J105-ANK-ELE-214 Sizing Calculations Lighting Transformer A Approved

15 ELECTRICAL IPL-1600-J105-ANK-ELE-215 Vendor Data Sheet of Lighting Transformar R Approved

16 ELECTRICAL IPL-1600-J105-ANK-ELE-216 Sizing Calculations AuxiliaryTransformer R Approved

17 ELECTRICAL IPL-1600-J105-ANK-ELE-217 Vendor Data Sheet of Auxilliary Transformer I Approved

18 ELECTRICAL IPL-1600-J105-ANK-ELE-218 MV Cables Voltage Drop & Sizing Calculations R Approved

19 ELECTRICAL IPL-1600-J105-ANK-ELE-219 HV Cables Voltage Drop & Sizing Calculations R Approved

20 ELECTRICAL IPL-1600-J105-ANK-ELE-220 Vendor Data Sheet For Mv Cable R Approved

21 ELECTRICAL IPL-1600-J105-ANK-ELE-221 MV Cable Schedule I Approved

22 ELECTRICAL IPL-1600-J105-ANK-ELE-222 Vendor Data Sheet For Hv Cable R Approved

23 ELECTRICAL IPL-1600-J105-ANK-ELE-223 HV Cable Schedule I Approved

24 ELECTRICAL IPL-1600-J105-ANK-ELE-224 Interconnection Cable Diagram Schematic I Approved

25 ELECTRICAL IPL-1600-J105-ANK-ELE-225 Cable Route Layout I Approved

26 ELECTRICAL IPL-1600-J105-ANK-ELE-226 Vendor Data Sheet for NGR R Approved

27 ELECTRICAL IPL-1600-J105-ANK-ELE-227 Sizing Calculations For UPS & Battery Bank A Approved

28 ELECTRICAL IPL-1600-J105-ANK-ELE-228 Sizing Calculations Battery Charger & Battery Bank A Approved

29 ELECTRICAL IPL-1600-J105-ANK-ELE-229 Short Circuit & Fault Level Calculations R Approved

30 ELECTRICAL IPL-1600-J105-ANK-ELE-230 Earthing System Design Calculations R Approved

31 ELECTRICAL IPL-1600-J105-ANK-ELE-231 Earthing Layout I Approved

32 ELECTRICAL IPL-1600-J105-ANK-ELE-232 Lighting Calculations I Approved

33 ELECTRICAL IPL-1600-J105-ANK-ELE-233 Lighting Layout I Approved

34 ELECTRICAL IPL-1600-J105-ANK-ELE-234 Lightning Protection Calculations I Approved

35 ELECTRICAL IPL-1600-J105-ANK-ELE-235 Substation Equipment Layout I Approved

36 ELECTRICAL IPL-1600-J105-ANK-ELE-236 Lighting Fixture Schedule I Approved

37 ELECTRICAL IPL-1600-J105-ANK-ELE-237 Relay Setting & Coordination Document I Approved

38 ELECTRICAL IPL-1600-J105-ANK-ELE-238 Hook Up Drawings R Approved

39 ELECTRICAL IPL-1600-J105-ANK-ELE-239 BOQ I Approved

40 ELECTRICAL IPL-1600-J105-ANK-ELE-240 Hazardous Area Classification Drawing R

NGR Sizing for 22/6.9 KV 2 MVA Transformer and


41 ELECTRICAL IPL-1600-J105-ANK-ELE-241 6.6/0.415 KV 500 KVA Transformer R Approved

5 of 8
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
STATUS SOFT PDF PDF REMARKS

42 ELECTRICAL IPL-1600-J105-ANK-ELE-242 DP Structure layout I Approved

43 ELECTRICAL IPL-1600-J105-ANK-ELE-243 MTO for Earthing Material I Approved

INSTRUMENTATION (11.5380% of
B6
80% of Design Weightage 5%)

INSTRUMENTATI
1 ON IPL-1600-J105-ANK-INS-201 System Architecture Drawing A Comment

2 INSTRUMENTATI IPL-1600-J105-ANK-INS-202 Instrument Index & I/O List I Approved


ON

INSTRUMENTATI
3 IPL-1600-J105-ANK-INS-203 Hook Up Drawings With Existing Systems R Approved
ON

4 INSTRUMENTATI IPL-1600-J105-ANK-INS-204 Datasheet For Orifice Plates A Approved


ON

5 INSTRUMENTATI IPL-1600-J105-ANK-INS-205 Data Shee For Fusible Plug A Approved


ON

INSTRUMENTATI
6 IPL-1600-J105-ANK-INS-206 Data Sheet For Pressure Gauge A Approved
ON

INSTRUMENTATI
7 IPL-1600-J105-ANK-INS-207 Data Sheet For Pressure Switch A Approved
ON

INSTRUMENTATI
8 ON IPL-1600-J105-ANK-INS-208 Data Sheet For Solenoid Valve A Approved

INSTRUMENTATI
9 ON IPL-1600-J105-ANK-INS-209 Control Room Layout Drawing A Comment

INSTRUMENTATI
10 ON IPL-1600-J105-ANK-INS-210 Instrumentation Cable Routing Drawings R Approved

INSTRUMENTATI
11 ON IPL-1600-J105-ANK-INS-211 Instrument & JB Location Layout R Approved

INSTRUMENTATI
12 IPL-1600-J105-ANK-INS-212 Power Supply Distribution Drawing I Approved
ON

INSTRUMENTATI IPL-1600-J105-ANK-INS-213
13 Functional Schematics A Approved
ON

INSTRUMENTATI IPL-1600-J105-ANK-INS-214
14 Bulk MTO I Approved
ON

INSTRUMENTATI IPL-1600-J105-ANK-INS-215
15 Cable Schedule I Approved
ON

INSTRUMENTATI IPL-1600-J105-ANK-INS-216
16 Wiring Interconnection Drawing I
ON

INSTRUMENTATI IPL-1600-J105-ANK-INS-217
17 JB Termination Drawings I Approved
ON

INSTRUMENTATI
18 IPL-1600-J105-ANK-INS-218 Instrumentation Design Basis A Approved
ON

19 INSTRUMENTATI IPL-1600-J105-ANK-INS-219 Datasheet for Pressure Transmitter A Approved


ON

INSTRUMENTATI IPL-1600-J105-ANK-INS-220
20 Datasheet for displacer type level transmitter A Approved
ON

21 INSTRUMENTATI IPL-1600-J105-ANK-INS-221 Datasheet for Level Switch A Comments


ON

INSTRUMENTATI
22 ON IPL-1600-J105-ANK-INS-222 GA drawing for instrumentation cable tray I Approved

23 INSTRUMENTATI IPL-1600-J105-ANK-INS-223 Datasheet of junction box & cable glands A Approved


ON

24 INSTRUMENTATI IPL-1600-J105-ANK-INS-224 Datasheet for Instrument Cabes A Approved


ON

25 INSTRUMENTATI IPL-1600-J105-ANK-INS-225 Datasheet for Deluge Valve A Approved


ON

MECHANICAL (12.8200% of 80%


B7 of Design Weightage 5%)

1 MECHANICAL IPL-1600-J105-ANK-MEC-201 Data Sheet For Main Fire Water Pumps- Diesel Engine A Approved
Driven

Data Sheet For Main Fire Water Pumps- Electric Motor


2 MECHANICAL IPL-1600-J105-ANK-MEC-202 Driven A Approved

3 MECHANICAL IPL-1600-J105-ANK-MEC-203 Data Sheet For Jockey Fire Water Pumps A Approved

4 MECHANICAL IPL-1600-J105-ANK-MEC-204 Data Sheet For Foam Filling Pump A Approved

5 MECHANICAL IPL-1600-J105-ANK-MEC-205 Data Sheet For Foam Tank A Approved

6 MECHANICAL IPL-1600-J105-ANK-MEC-206 GA For Foam Tank A Approved

7 MECHANICAL IPL-1600-J105-ANK-MEC-207 Data Sheet For Diesel Day Tank Tank A Approved

Datasheet For Material Handling Systems-Eot Crane 5


8 MECHANICAL IPL-1600-J105-ANK-MEC-208 A Approved
Ton

9 MECHANICAL IPL-1600-J105-ANK-MEC-209 Datasheet For Material Handling Systems-Pallet Truck- A Approved


2T

10 MECHANICAL IPL-1600-J105-ANK-MEC-210 Fire Fighting Design Basis R Approved

11 MECHANICAL IPL-1600-J105-ANK-MEC-211 Fire Water Demand Calculation I Approved

12 MECHANICAL IPL-1600-J105-ANK-MEC-212 Data Sheet For Jet Nozzle I Approved

6 of 8
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
STATUS SOFT PDF PDF REMARKS

13 MECHANICAL IPL-1600-J105-ANK-MEC-213 Data Sheet For Fog Nozzle I Approved

14 MECHANICAL IPL-1600-J105-ANK-MEC-214 Data Sheet For Hvlr Monitor - 1000 Gpm I Approved

15 MECHANICAL IPL-1600-J105-ANK-MEC-215 Data Sheet For Mvws Nozzles I Approved

16 MECHANICAL IPL-1600-J105-ANK-MEC-216 Data Sheet For Foam Maker / Foam Chamber I Approved

17 MECHANICAL IPL-1600-J105-ANK-MEC-217 Data Sheet For Foam Deflector / Foam Pourer I Approved

18 MECHANICAL IPL-1600-J105-ANK-MEC-218 Data Sheet For Foam Concentrate I Approved

19 MECHANICAL IPL-1600-J105-ANK-MEC-219 Data Sheet for Foam Proportioner I Approved

20 MECHANICAL IPL-1600-J105-ANK-MEC-220 Overall Fire Water Network Layout I Comment

Details of Ladder and Platform for Foam Concentrate


21 MECHANICAL IPL-1600-J105-ANK-MEC-221 Tank A Approved

22 MECHANICAL IPL-1600-J105-ANK-MEC-222 Datasheet for Sluice Gate A Approved

7 of 8
DWG/ DOC AVAILABLE

Submittal Code
Sr. No DISCIPLINE Drawing/ Document No. Drawing Document Title Status PRESENT SCANNED
STATUS SOFT PDF PDF REMARKS

Sch. for
Description
ANK.

Total for Pre Engineering 100.00%


Total for Detail Engineering 100.00%
Total for As Built 0.00%
Overall Total 200.00%

Description Sch. for


ANK.

General (Pre Engineering) 100.00%


General 2.56%
Process 21.15%
Piping 12.18%
Civil 14.10%
Electrical 25.64%
Instrument 11.54%
Mechanical 12.82%
Total 200.00%

Discipline Total Doc.


as per DCI

General (Pre Engineering) 1


General 4
Process 33
Piping 19
Civil 22
Electrical 40
Instrumentation 18
Mechanical 20
TOTAL 157

Total Doc.
as per DCI
General (Pre Engineering) 1
General 6
Process 53
Piping 36
Civil 32
Electrical 43
Instrumentation 25
Mechanical 22
TOTAL 218