a) Concurrency
b) Enabling techniques
c) Data persistence
d) Design process
a) Functional requirements
b) Design constraints
c) Quality attribute requirements
d) None of the above
a) Abstraction
b) Coupling cohesion
c) Decomposition
d) Modularization
e) Encapsulation/information hiding
f) Option a & c
g) Option a, b,d,e
h) Option a,b,c,d,e
i) None of the above
Testing Scenarios
A. Identifying defects which might go undetected during execution of separate test cases.
B. error conditions
A. class diagrams
B. sequence diagrams
C. collaboration diagrams
A. True
B. False
A. Scenario #
B. Reference document
C. User id
A. Basic flows
B. Alternate flows
C. Both A & B
D. none of the above
B. Hypothetical stories
A. Test scenario
B. Test development
C. both A & B
B. Business rules
C. Normal conditions.
10. Is it necessary to consider exception flow while modeling use case diagram for test scenarios
A. True
B. False
c. Both a and b
b. Completeness of quality
c. User satisfaction
a.4
b.2
c.5
d.3
4. What is an Inspection?
c. Both a and b
5.What is Walkthrough?
a. Find anomalies
b. improve the s/w product
a. Analytical technique
b. both a and c
c. Dependability
d. Integrity level
e. both c and d.
a. Static techniques
b. Integrity level.
c. Analytical techniques
d. both a and c
e. both a and b
9. RunCharts is an example of
a. Statistical based
b. Statistical tests
c. Trend Analysis
d. Prediction
a. Statistical based
b. Statistical tests
c. Trend Analysis
d. Prediction
SOFTWARE ENGINEERING
2) The Software Requirements Specification does not contain which of the following ?
5) Quantifiable requirements are the one which give Mathematical Value for any System
a) True b) False
a)True b)False
10) .NET Platform with SQL Database are to be implemented at which stage
a) Low level Requirement b)High level Requirement c)Business Application Goal
d) Feature List
11) why should the s/w engineer need to analyze the requirements?(check box)
a.spiral model
b.waterfall maodel
c.prototyping model
d.CMM
a.small projects
b.complex projects
c.accommodating change
a.people
b.process
c.product
d.project
16.prototype is a
TESTING-DEVELOPMENT
1.The process of preparation of complete set of test cases to be performed during testing is the
test development process. say true or false
a.True
b.False
a.Entry criteria
b.Exit criteria
b.EP
c.EG
a.set of inputs
b.execution pre-condition
c.expected outcomes
6.Multiple test cases could be generated for a single scenario with multiple test conditions. Say
true or false
a.true
b.false
7.Equivalence partitioning divides the output data of a software unit into partions of data from
which test cases can be derived.say true or false
a.true
b.false
8.In Equivalence partitioning, the test cases are designed to cover each partion at least
a.once
b.twice
c.thrice
d.none of the above
9.What is a technique that consists of developing a test cases and data that focuses on input and
output boundaries of a given function
a.Equivalence partitioning
c.Both a and b
10.Is Boundary value analysis identify the error at the boundaries rather than finding those that
exists in the center of the output domain.say true or false
a.true
b.false
SOFTWARE TESTING
D. None
6) Each process model follows a particular _____ in order to ensure access in process of software
development
A).Two
B).Three
C).four
9.Formal review is conducted by subject matter experts in the absence of the author.state true or
false
A).True
B).false
A).Avoids rework
B).Regression testing
B).Defect tracking
13).Defect testing
A).Development team
B).Build manager
C).Test team
14.The two ways of review like formal review and informal review is done in which type of
review?
A).Self review
B).peer review
15.Build verification and performing the test runs are part of Test Execution process.state True
or false
A).True
B).False
SOFTWARE QUALITY
a)SMDL
b)TickIT
c)SLOI
d)CMMI
a)TQM
b)PCDQ
c)TSM
d)PDCA
a)Verification process
c)Review process
a)Defect Resolution
b)Coverage Analysis
c)Risk Management
d)Test Management
a)Checking
b)Usability
c)validity
d)validation
a)Activity cost
b)Quality cost
c)Time cost
d)None of the above
a)1:5
b)1:8
c)1:10
d)1:2
8.Defects caught internally deal by discarding or repairing the defective items called
a)appraisal cost
c)prevention cost
a)cross_functional
b)ad_hoc
c)Bottom-up
d)Top-down
a)Design cost
b)Coding cost
c)Maintance cost
d) Testing cost
SOFTWARE CONSTRUCTION
c.Process
a.Minimizing complexity
b.Anticipating change
d.Standards in construction
a.ProgrammingLanguages
b. Unified Modeling Language
c.Mainframe
4. We should construct software that allows bugs to be easily found and fixed.
a.True
b.False
a.True
b.False.
6. Construction depends on which of the following
a.QA engineers.
b.Developers
c.Quality Manager.
a.QA engineers.
b.Developers
c.Quality Manager.
b.Continuous integration
10. The important decisions are taken during which of the following phases,
a.Coding Phase
b.Testing Phase.
4. To join tables on columns of the same name, the ________clause can be used?
a. ON
b. USING
c. All of the above.
5. To fetch various combinations of two/more table records ,which join can be used?
a. Inner join
b. Outer join
c. Cross join
d. Self join
6. The comparison operators that are not in equi join are
a. <=
b. >=
c. <!=>
d. =
13. A subquery that refers to a column of a table that is not in its FROM clause but can
be in the PROJECTION or in the WHERE clause is called_________.
a. Scalar subquery
b. Multiple Row subquery
c. Correlated Subquery
d. Non correlated subquery
14. A virtual table that can access the data using SQL SELECT statement is _______.
a. Index
b. Transaction
c. View
d. None of the above.
MY-SQL
5. _____________ is the process of organizing the fields and tables of a relational database
to minimize redundancy and dependency.
a. Redundancy
b. Consistency
c. Normalization
d. None of these
9. _____________ normal form contains only atomic values, and the value of each
attribute contains only a single value from that domain.
a. Third
b. First
c. Second
d. Bcnf
10. In a like clause ______________ is used for fetching the value ending with “ton”.
A. LIKE ton$
B. LIKE ^.*ton$
C. LIKE %ton
D. LIKE *ton
E. LIKE.*ton
11) To remove duplicate rows from the result set of a SELECT use the following keyword:
a) NO DUPLICATE
b) UNIQUE
c) DISTINCT
d) None of the above
15) What SQL clause is used to restrict the rows returned by a query?
a) AND
b) WHERE
c) HAVING
d) FROM
16) mysql_pconnect ()
is used to make a persistent connection to the database which means a SQL link that do not
close when the execution of your script ends.
a) True
b) False
True or False?
a) False
b) True
20) Which of the following commands should be used to create a database named “student”?
a) CREATE ?I student
b) CREATE DATABASE student
c) DATABASE /student
d) DATABSE student
21) Which one will delete the table data as well as table structure?
a) TRUNCATE
b) DROP
24) The main MySQL program that does all the data handling is called?
a) mysql.exe
b) mysql
c) mysqld
d) httpd
26) In a SELECT with a GROUP BY clause, a WHERE clause, and a HAVING clause, the WHERE
conditions are applied before the HAVING conditions.
a) True
b) Fasle
c) Either True or False
d) None of the above
a. True b. false
2. There are _____ general architectures for assessment model
a.3 b. 4 c.2 d. 5
a. true b.false
a. false b. true
6. the personal software process is a part of
a. true b. false
8. minimum requirement in CBA-IPI assessment method does not include data validation
and collection
a. true b. false
a. 5 b. 6 c.3 d. 4
a.1
b.2
c.3
d.4
2.)Process infrastructure and software process management cycle come under which of the
following stages in software engineering process?
a.process definition
c.process assessment
d.none of the above
3.)Process measurement and software product measurement come under which stage in
software engineering process?
a.process definition
b.process assessment
4.) _________ is concerned with modifying existing software systems to meet new
requirements.
5.) Which of these terms are level names in the Capability Maturity Model?
A) Performed
B) Repeated
C) Reused
D) Optimized
E) both a and d
6.) Which of the items listed below is not one of the software engineering layers?
A) Process
B) Manufacturing
C) Methods
D) Tools
(a) When a phase in the lifecycle is completed, the results fall down to the next phase and there
is no going back.(ans)
(b) When a phase in the lifecycle iterates like a ring on the spiral, moving outward from the
center.
8.)DFD represents?
b.The processes
9.The software life cycle can be said to consist of a series of phases. The classical model is
referred to as the waterfall model. Which phase may be defined as "The concept is explored
and refined, and the client's requirements are elicited?"
(a) Requirements
(b) Specification
(c) Design
(d) Implementation
(e) Integration