BILL OF QUANTITY

JASA KONSULTAN RANCANGAN TEKNIK TERINCI (RTT)


PERPANJANGAN RUNWAY (400X45) M2 TERMASUK AFL DAN PEMBANGUNAN FASILITAS PENUNJANGNYA
SERTA PENINGKATAN DAYA DUKUNG RUNWAY
BANDARA I GUSTI NGURAH RAI - BALI
DI BANDARA INTERNASIONAL I GUSTI NGURAH RAI - BALI

VOLUME HARGA SATUAN JUMLAH HARGA


NO. URAIAN
JUMLAH
JUMLAH BOBOT SATUAN (Rp.) (Rp.)
SATUAN
I BIAYA LANGSUNG PERSONIL
1
Team Leader Ahli Madya Tek. Sipil (S2 Tek. Sipil - 15 th) - Ahli Madya 1.00 6.00 6.00 MM
2
Ahli Teknik Landasan Terbang/Jalan (S2 Tek. Sipil - 10 th) - Ahli Madya 1.00 6.00 6.00 MM
3 Ahli Teknik Dermaga (S2 Tek. Sipil / Tek. Kelautan - 10 th) - Ahli
1.00 4.00 4.00 MM
Madya
4 Ahli Geoteknik (S2 Tek. Sipil - 10 th) - Ahli Madya 1.00 4.00 4.00 MM
5 Ahli Struktur (S1 Tek. Sipil - 10 th) - Ahli Madya 1.00 4.00 4.00 MM
6 Ahli Teknik Sungai dan Drainase (S1 Tek. Sipil - 10 th) - Ahli Madya 1.00 3.00 3.00 MM
7 Ahli Geodesi (S1 Tek. Geodesi - 10 th) - Ahli Madya 1.00 3.00 3.00 MM
8 Ahli Teknik Listrik Bandara (DIII Tek. Listrik Bandara (diutamakan) / S1
1.00 4.00 4.00 MM
Tek. Elektro - 5 th)
Ahli Operasional dan Navigasi Bandara (DIII Tek.Bangunan dan
9 1.00 4.00 4.00 MM
Landasan (diutamakan) / S1 Tek.Sipil dgn Kompetensi Terkait - 5 th)
10 Asisten Ahli Teknik Landasan Terbang (S1 Tek. Sipil - 5 th) 1.00 6.00 6.00 MM
11 Asisten Ahli Teknik Dermaga (S1 Tek. Sipil / Tek. Kelautan - 5 th) 1.00 4.00 4.00 MM
12 Asisten Ahli Geoteknik (S1 Tek. Sipil - 5 th) 1.00 4.00 4.00 MM
13 Asisten Ahli Struktur (S1 Tek. Sipil - 5 th) 1.00 4.00 4.00 MM
14 Asisten Ahli Teknik Sungai dan Drainase (S1 Tek. Sipil - 5 th) 1.00 3.00 3.00 MM
15 Asisten Ahli Geodesi (S1 Tek. Geodesi - 5 th) 1.00 3.00 3.00 MM
16 Asisten Ahli Teknik Listrik Bandara (DIII Tek. Listrik Bandara / S1 Tek.
1.00 4.00 4.00 MM
Elektro - 3 th)
17 As. Ahli Operasional dan Navigasi Bandara (DIII Tek. Bangunan dan
1.00 4.00 4.00 MM
Landasan / S1 Tek. Sipil dgn Kompetensi Terkait - 3 th)
18 Quantity Surveyor Bidang Sipil (S1 / T. Sipil -5 th) 1.00 4.00 4.00 MM
19 Quantity Surveyor Bidang Listrik (DIII Teknik Listrik Bandara / S1 -
1.00 4.00 4.00 MM
T.Elektro - 3 th)
20 CAD Operator (D3 / Teknik Sipil - 3 th) 2.00 6.00 12.00 MM
21 Administrasi Teknik (D3 / 3 th) 1.00 6.00 6.00 MM
22 Surveyor (D3 / Geodesi / Tek. Sipil / Tek. Kelautan - 5 th) 2.00 3.00 6.00 MM
JUMLAH I
II BIAYA LANGSUNG NON PERSONIL
A MASA PERENCANAAN
1 Biaya Perjalanan Survey 2x
a. Biaya Tiket Pesawat CGK-DPS-CGK 21.00 2.00 42.00 PP
b. Biaya akomodasi 21.00 10.00 210.00 org.hari
2 Biaya Perjalanan Koordinasi Perencanaan 2x
a. Biaya Tiket Pesawat CGK-DPS-CGK 10.00 2.00 20.00 PP
b. Biaya akomodasi 10.00 6.00 60.00 org.hari
B MASA PELELANGAN
1 Biaya Selama Proses Lelang Pekerjaan Fisik 2x
a. Biaya Tiket Pesawat CGK-DPS-CGK 3.00 3.00 9.00 PP
b. Biaya akomodasi 3.00 9.00 27.00 org.hari
C MASA PELAKSANAAN KONSTRUKSI
1 Biaya Perjalanan Koordinasi Pelaksanaan 5x
a. Biaya Tiket Pesawat CGK-DPS-CGK 3.00 5.00 15.00 PP
b. Biaya akomodasi 3.00 15.00 45.00 org.hari
JUMLAH II
III BIAYA PENGUKURAN DAN PENGUJIAN
1 Pengukuran dan Pemetaan Topografi 385000.00 1.00 385000.00 m2
2 Mobilisasi dan demobilisasi 1.00 1.00 1.00 ls
3 Pengujian Geoteknik (offshore)
a. Borehole dan SPT 9.00 1.00 9.00 titik
(termasuk pengambilan disturbed & undisturbed sample )
b. CPTu 4.00 1.00 4.00 titik
b. CPT 5.00 1.00 5.00 titik
c. DGPS Positioning System, Pengukuran kedalaman air laut 9.00 1.00 9.00 titik
VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN
JUMLAH
JUMLAH BOBOT SATUAN (Rp.) (Rp.)
SATUAN
4 Pengujian Geoteknik (onshore)
a. Borehole dan SPT 5.00 1.00 5.00 titik
(termasuk pengambilan disturbed & undisturbed sample )
b. CPT 5.00 1.00 5.00 titik
5 Survey Quary
a. Biaya perjalanan 3.00 4.00 12.00 org.quarry
b. Pengambilan sampel 5.00 3.00 15.00 smpl.quarry
6 Pengujian Laboratorium
a. Undisturbed samples :
- Kadar air 75.00 1.00 75.00 sampel
- Relatif density 75.00 1.00 75.00 sampel
- Berat isi 75.00 1.00 75.00 sampel
- Kuat tekan bebas 75.00 1.00 75.00 sampel
- Konsolidasi manual 75.00 1.00 75.00 sampel
- Triaxial unconsolidated undrained (UU) 37.00 1.00 37.00 sampel
- Triaxial consolidated undrained (CU) 37.00 1.00 37.00 sampel
- Permeability falling head 75.00 1.00 75.00 sampel
- Permeability constant head 75.00 1.00 75.00 sampel
- Kuat geser langsung automatic (CD) 75.00 1.00 75.00 sampel
b. Disturbed samples :
- Analisa saringan 75.00 1.00 75.00 sampel
- Analisa hidrometer 75.00 1.00 75.00 sampel
- Berat jenis 75.00 1.00 75.00 sampel
- Atterberg limit 75.00 1.00 75.00 sampel
- Pemadatan standar 75.00 1.00 75.00 sampel
- CBR (standard soaked) 75.00 1.00 75.00 sampel
- CBR (standard unsoaked) 75.00 1.00 75.00 sampel
7 Penyelidikan Sistem Perkerasan Runway Eksisting
a. PCI ( Survey visual) 1.00 1.00 1.00 ls
b. Core drill 60.00 1.00 60.00 titik
c. Pengujian laboratorium Ekstraksi sample coring 30.00 1.00 30.00 test
d. Pengujian laboratorium Kepadatan dan tinggi sample coring 60.00 1.00 60.00 test
e. Tes GPR 1.00 1.00 1.00 ls -
f. Tes Pit 8.00 1.00 8.00 titik
g. Pemantauan muka air tanah 6.00 1.00 6.00 titik
h. Borehole 30.00 1.00 30.00 titik
JUMLAH III
IV BIAYA OPERASIONAL
1 Sewa kendaraan roda empat 2.00 6.00 12.00 bulan
2 Biaya komunikasi/telepon 1.00 6.00 6.00 bulan
3 Sewa peralatan kantor 1.00 6.00 6.00 bulan
4 Alat tulis kantor 1.00 6.00 6.00 bulan
5 Sewa kantor 1.00 6.00 6.00 bulan
JUMLAH IV
V BIAYA LAPORAN
1 Laporan Pendahuluan 5.00 1.00 5.00 buku
2 Laporan dan Gambar Pengukuran dan Pemetaan Topografi (A2) 5.00 1.00 5.00 buku
3 Laporan PCI 5.00 1.00 5.00 buku
4 Laporan GPR 5.00 1.00 5.00 buku
5 Laporan dan Gambar Layering Sistem Runway Eksisting 5.00 1.00 5.00 buku
6 Laporan Pengujian Perkerasan Runway Eksisting 5.00 1.00 5.00 buku
7 Laporan Penyelidikan Tanah 5.00 1.00 5.00 buku
8 Laporan Review Kajian KKOP 5.00 1.00 5.00 buku
9 Laporan Akhir 5.00 1.00 5.00 buku
10 Laporan Detail Desain Struktur, Elektrikal dan Drainase 5.00 1.00 5.00 buku
11 Gambar Detail Desain Struktur, Elektrikal dan Drainase (uk. A3) 5.00 1.00 5.00 buku
12 Laporan Perhitungan Volume 5.00 1.00 5.00 buku
13 Rencana Anggaran Biaya (RAB dan BOQ) 5.00 1.00 5.00 buku
14 Rencana Kerja & Syarat (RKS) dan Spesifikasi Teknis 5.00 1.00 5.00 buku
15 Ringkasan Eksekutif 5.00 1.00 5.00 buku
16 Softcopy (CD) 5.00 1.00 5.00 keping
17 Laporan Dokumentasi Kerja 3.00 1.00 3.00 buku
JUMLAH V -
VOLUME HARGA SATUAN JUMLAH HARGA
NO. URAIAN
JUMLAH
JUMLAH BOBOT SATUAN (Rp.) (Rp.)
SATUAN
REKAPITULASI BIAYA DESIGN
I BIAYA LANGSUNG PERSONIL Rp -
II BIAYA LANGSUNG NON PERSONIL Rp -
III BIAYA PENGUKURAN DAN PENGUJIAN Rp -
IV BIAYA OPERASIONAL Rp -
V BIAYA LAPORAN Rp -
TOTAL Rp -
DIBULATKAN Rp -
PPN 10% Rp -
TOTAL Rp -
Terbilang :