DAILY REPORT

Project : PEMBANGUNAN SARPAS BUKIT ASAM Weather


SPK No. : 4160093022 Rain :
Date : 15 Maret 2020 Drizzle :
Working Time : 08.00 - 17.00 WIB
Progress Fisik Remark
No. Description Sat Qty
Previous Today Cumulatif

1 Pekerjaan pasangan batu bata, pemasangan atap


2 Pekerjaan painting primer plate tank water fire figthing pcs 6 3 3 6
3 Install fit up plate shel 5 tanki 100A pcs 5 3 2 5
4 Welding plate shel 3 tanki 100B

MAN POWER CAR, EQUIPMENT, TOOLS Remark


No. Position Qty Hours No. Name Sat. Qty
1 PM MK 1 Prs 8 1 Excavator PC 200 unit 1
2 PM PT. BDM 1 Prs 8 2 Compressor 390 CFM unit 1
3 SM PT. BDM 1 Prs 8 3 Mesin Bore Magnet unit 4
4 Finance PT. BDM 1 Prs 8 4 Travo las 250A unit 2
5 Admin 2 Prs 16 5 Mobil 4WD unit 3
6 Drafter PT. BDM 1 Prs 8 6 Forklift 2 ton nit 1
7 Surveyor PT. BDM 1 Prs 8 7 Welding Machine 500A unit 7
8 Ast. Surveyor PT. BDM 1 Prs 8 8 Blasting pot set 1
9 Quality Control Civil 1 Prs 8 9 Electrical Chain unit 1
10 Mechanical Engineer MK 1 Prs 8 10 Bus unit 2
11 Electrical Engineering MK 1 Prs 8 11 Waterpas Leveling unit 1
12 Project Control 1 Prs 8 12 Theodolit unit 1
13 HSE BDM 2 Prs 16 13 Grinda 4" unit 4
14 Sandblaster 3 Prs 24 14 Grinda 7" unit 2
15 Mechanic 1 Prs 8 15 Mesin Bor Seng unit 2
16 Welder 6 Prs 48 16 Bar Bending unit 1
17 Fitter 5 Prs 40 17 Bar Cutter unit 1
18 Supervisor Mechanikal 1 Prs 8 18 Mesin pompa air unit 3
19 Security 2 Prs 16 19 Vibrator concrete unit 2
20 Operator Excavator 1 Prs 8 20 Elpiji 12 kg unit 4
21 Painting 3 Prs 24 21 Oksigen btl 6
22 Team Bending plate 4 Prs 32 22 Genset 60 KVA btl 1
23 Driver 3 Prs 24 23 Machine cut otomatic unit 1
24 Civil Man 27 Prs 216 24 Mesin molen unit 2
25 Mechanical Man 16 Prs 128 25 Tripot gawang unit 1
26 Electrical Man 3 Prs 24 26 Genset 30 KVA unit 1
27 Welder Inspector 1 Prs 8 27 Mesin Bending plate unit 1
28 Supervisor Sipil 1 Prs 8 28 Machine cut wheel 14" unit 2
Total 92 Prs 728 Total 58

Prepared by, Approved by,


PT. Elnusa Fabrikasi Konstruksi PT. Elnusa Petrofin

( Marhuaso Agung ) ( Fadio Romanza )


Project Manager MK Project Leader
DOCUMENTATION
Project : PEMBANGUNAN SARPAS BUKIT ASAM
SPK No. : 4160093022
Date : 15 Maret 2020
Working Time : 08.00 - 17.00 WIB

Description : Pekerjaan pasangan batu bata, pemasangan atap Description : Pekerjaan sand balasting plate tank water fire figthing

Description : Install fit up plate shel 5 tanki 100A Description : Welding plate shel 3 tanki 100B

You might also like