L1 GREY STRUCTURE AND FINISHING WORKS (COMMON AREA) OF PAVILION 2 & 3 AT EIGHTEEN

L2 PROJECT MILESTONES
GENERAL AND ENGINEERING AND
CONSTRUCTION WORKS
TESTING AND HANDING OVER
PRELIMINERIES PROCUREMENT COMMISSIONING AND CLOSE OUT

Shop
Shop Drawing Material Delivery At
L3 MOBILIZATION PRELIMINERIES
Submittal
Drawing
Approval
Material Submittal
Approval
Purchase orders
Site
PAVILION 2 BUILDING PAVILION 3 BUILDING External Development

ENABLING RAFT SECOND ELEVATION


BASEMENT FLOOR GROUND FLOOR FIRST FLOOR THIRD FLOOR FOURTH FLOOR FIFTH FLOOR SIXTH FLOOR MUMTY FLOOR RAMP UGWT
L4 WORKS FOUNDATION FLOOR WORKS

Excavation & Earth Structure Architectural


Backfilling Works Zone - I Zone - II Zone - III Zone - IV MEP Works Parapet Wall OHWT Earth Works Concrete Works
Works Works Works

L5
Structure Architectural
Architectural Works MEP Works Structure Works MEP Works
Works Works

Bottom Slab & Foundation


Retaining Wall Ceiling Finishes Electrical Works
Columns Works
Columns
Columns Wall Finishes Plumbing Works Walls Walls
Slab & Beams
Stairs & Shear
Floor Finishes HVAC Works Top Slab Top Slab
Walls
Lift Walls
L6 Lift Walls Stair Finishes
Slab & Beams
Doors & Windows/
Slab & Beams
Ventilators

Pour 1: GL S-V/1-
Zone I ST-01 LW-01 Internal Wiring POTABLE WATER & GAS SYSTEM Split-Type Air-Conditioner System
17
Zone I
Pour 2: GL 1/J-S +
Zone II Switches & Sockets SANITARY WATER SYSTEM
18'/M-S + S/17-18'
ST-02 LW-02 Zone II
Pour 3: GL A-M/13-
Zone III Distribution Boards
18'
L7 Pour 4: GL A-D'/1-
Zone IV Communication Systems
13

IP CCTV SURVEILLANCE
SYSTEM

PUBLIC ADDRESS SYSTEM

FIRE ALARAM SYSTEM