Professional Documents
Culture Documents
NOTES :
H I J K L M N O 1. METRIC UNITS USED THROUGHOUT.
ZONE D ZONE C ALL DIMENSIONS IN MILLIMETERS (mm)
UNLESS NOTED OTHERWISE (U.N.O).
2. LEVELS IN METERS WITH REFERENCE.
3. ELEVATION
TB4 TB4 TB4 TB4 TB4 TB4 TB9 TB8
- EL = EXCAVATION LEVEL
- SL = STRUCTURE LEVEL
GRID 23 - FFL = FINISH FLOOR LEVEL
- BEL = BOTTOM EXCAVATION LEVEL
SCALE 1 : 200 TB4 REBARS AND CONNECTION ARE TYPICAL
4. LEAN CONCRETE 100mm Thk : K-100
5. ALL DIMENSION HERE IN ARE SUBJECT TO CHANGE
AS PER SITE CONDITION.
6. CONCRETE GRADE:
K L M N O - PILECAP & TIE BEAM ; FC'= 25 MPA
- SLABS ON GRADE ; FC'= 32 MPA
- COLUMNS
BASEMENT 1 & BASEMENT 2 ; FC'= 55 MPA
GROUND FLOOR, 1ST FLOOR & 2ND FLOOR ; FC'= 35 MPA
7. STEEL GRADE BJTD40
8. CONCRETE COVER:
- PILE CAP = 50MM FOR BOTTOM, SIDES AND TOP
(TOP LAYER BELOW OF THE SLAB REINFORCEMENT)
TB4 TB4 TB9 TB8 - PIT COVER = 40MM
- SLAB TOP COVER = 20MM INTERNAL, 40MM EXTERNAL
- TIE BEAM & BEAM = 40MM TO TIES
- COLUMN = 40MM TO TIES
- SHEAR WALL = 40MM
P4 P5 P5 P4 P4 9. THIS DRAWING PRODUCE IN CROSS REFERENCE
WITH STRUCTURAL IFC DRAWING :
DWG NO: -17025-FD-S-1-0200-C
-17025-FD-S-1-0231-B TO 0234-A
BASEMENT 2 ZONE C
TIE BEAM GRID 23 ZONE C
Bar schedule - bending shapes No. PERUBAHAN / REVISION TGL / DATE
Proyek/Project :
4 2 19 10.69 21.37 47.55
IKEA - 2
5 2 19 8.18 16.35 36.38 JAKARTA GARDEN CITY
6 8 19 9.00 72.00 160.20 Konsultan M&E/Mechanical & Electrical Consultant :
SHOP DRAWING
Oleh/By init. sign. Tanggal/Date
Digambar/Drawn RYU 27 May 2019
Diperiksa/Checked GFS
Diperiksa/Checked
Diperiksa/Checked
STARTER BARS REFER TO DRAWING NO.:
- IK2-BAM-B2-SC-D-6500 TO 6515 Disetujui/Approved MRA
PILE CAP REINFORCEMENT REFER TO DRAWING NO.: Project No./ Drawing No./ Scale/
0 0.2 0.4 0.6 0.8 1 Metres 0 0.5 1 1.5 2 2.5 Metres 0 2 4 6 8 10 Metres No. Proyek No. Gambar Skala Rev
- IK2-BAM-B2-SC-D-6200 TO 6220
Scale 1:20 @A1 Scale 1:50 @A1 Scale 1:200 @A1 1:200
P10065 IK2-BAM -B2-SC-D-6339
1:50/1:20
00
A1 (841 x 594mm)