Professional Documents
Culture Documents
Sales Contract 1
Sales Contract 1
- Tên hàng: Trái cây chưa qua chế biến (ít nhất 2 mặt hàng)
Date: 01/11/2019
Address: Lot C21, 2F Street, Vinh Loc Industrial Park, Binh Chanh District, Ho Chi
Minh City, Vietnam
Address: 3F, Kokusai Shin-Akasaka West Bldg, 6-1-20 Akasaka, Minato-ku, Tokyo
107-0052, Japan
The Seller agrees to sell and the Buyer agrees to buy the commodities on the
following terms and conditions:
ARTICLE 2 - QUALITY
+ Premium grade AA
+ Color: Green
+ Diameter: 3 - 4.5 cm
+ Length: 16 -29 cm
In words: "United States Dollars Ten thousand, three hundred and fifty only"
ARTICLE 4 - SHIPMENT
Delivery: by sea
Shipment Date: Delivery will be carried out within one month from the signing
date, from November 11th, 2019 to December 11th, 2019.
Delivery allowance: Plus/Minus 10% for quantity, total quantity and total amount.
ARTICLE 5 - PAYMENT
1) By the T/T for 30% of contract value in advance and 70% by T/T after
receiving the copy of B/L
2) All banking charge arisen at the Buyer’s bank is as Buyer’s expense.
3) All banking charge arisen at the Seller’s bank is as Seller’s expense.
4) Payment currency: United State dollar (USD)
5) Bank of the Seller:
BENEFICIARY BANK: VIETCOMBANK VINH LOC BRANCH
ADDRESS: STREET NO.7, VINH LOC INDUSTRIAL PARK, BINH TAN
DIST, HCMC, VIETNAM.
SWIFTCODE: BFTVVNVX007
BENEFICIARY: LONG VIET IMPORT EXPORT CO., LTD.
ACCOUNT OF BENEFICIARY: 0251371024601
6) Documents required: Invoice, Packing list, B/L, C/O, Phytosanitary
certificates.
The Buyer will get the original Bill of Lading from their carrier or carrier’s
agent.
Packing: The goods to be packed as per export packing standard. The packing must
be suitable for Sea Transportation and long-time storage.
- PKG NO.1 - UP
- Dimension: L x H x W (in M)
- MADE IN VIETNAM
ARTICLE 7 - INSURANCE
ARTICLE 8 - PENALTY
In case of delay in payment (if any), BUYER shall remit to SELLER interest
calculated from the date of presentation of documents to the bank in Japan to the
date of effective receipt of due amount. The interest will be calculated at LIBOR
RATE (6 months) plus 1.5 per cent.
Seller is not liable for any penalty of delay delivery of all or any of this contract
caused by any contingency beyond its control or beyond the control of, or covered
by its contract to furnish this commodity. Such contingencies shall include, but not
limited to governmental or other restraints affecting shipment or credit, strikes,
lockouts, floods, droughts, short or reduced supply of fuel or raw materials declared
or undeclared wars revolutions, res cyclones or hurricanes, epidemics or any other
acts of good or force majeure.
ARTICLE 10 - CLAIM
The Seller as the ability for processing the inspection of goods before shipment and
to bear all expenses occurred.
In the case of loss or damage after goods landed at port of arrival all by the Buyer
shall be made claim for quantity must be presented two months after arrival of
goods at Cat Lai Port claim for quality within three months after the goods at Cat
Lai Port, and shall be confirmed in writing together with survey report of the goods
inspection office of an authorized surveyor. The survey report of this authorized
surveyor should be regards as final.
Whenever such claim is to be proved as of the seller's responsibility. The seller shall
settle without delay.
ARTICLE 11 - ARBITRATION
Any amendment and/or additional clause to this contract shall be valid only if made
in written form and duty confirmed by both sides.
- Tên hàng: Phụ liệu may mặc (ít nhất 2 mặt hàng)
Date: 01/11/2019
Address: 202/19 To Hieu, Hiep Tan Ward, Tân Phu District, Ho Chi Minh City,
Vietnam
The Seller agrees to sell and the Buyer agrees to buy the commodity on the
following terms and conditions:
ARTICLE 2 - QUALITY
+ Color: Pink
+ Size: 65x51x29 cm
ARTICLE 4 - SHIPMENT
Delivery: by sea
Transshipment: Allowed
Delivery allowance: Plus/Minus 10% for quantity, total quantity and total amount.
The Seller must send along with the goods to the Buyer documents as follows:
ARTICLE 5 - PAYMENT
1) By the T/T for 30% of contract value in advance and 70% by T/T after
receiving the copy of B/L
2) All banking charge arisen at the Buyer’s bank is as Buyer’s expense.
3) All banking charge arisen at the Seller’s bank is as Seller’s expense.
4) Payment currency: United State dollar (USD)
5) Bank of the Seller:
BENEFICIARY BANK: BANK OF CHINA ZHEJIANG BRANCH.
ADDRESS: STREET 321 FENG QI ROAD, HANGZHOU, ZHEJIANG
PROV., CHINA
SWIFTCODE: BKCHCNBJ910
BENEFICIARY: HAINING JUNCHENG TEXTILE CO., LTD.
ACCOUNT OF BENEFICIARY: 13150000000588911
6) Documents required: Invoice, Packing list, Bill of Lading, Insurance policy,
C/O form E.
The Buyer will get the original Bill of Lading from their carrier or carrier’s
agent.
- Dimension: L x H x W (in M)
ARTICLE 7 - INSURANCE
Insurance premiums are borne by the seller under CIP Incoterms 2010 conditions.
ARTICLE 8 - PENALTY
In case of shipping delay, the seller is responsible for compensation to the buyer.
Compensation will be equal to 0.1% of the contract value for more than 1 day
(including Saturday, Sunday and weekdays)
In case the seller or the buyer cancels the contract, that party will have to pay 5% of
the contract value.
a. The two parties are not responsible for the failure to perform the contractual
obligations in the case of Force Majeure. Upon the occurrence of Impossibility quite
events that are beyond the control of the parties, unforeseen and unforeseen events
include but are not limited to: war, civil war, riot, strike, natural disasters, fire,
factory failures, the intervention of the Government, the military. The affected party
will notify by fax (or email) to the other party within 03 days after the incident
occurred. Evidence of Force Majeure will be issued by the competent authority and
sent to the other party within 7 days. Past the above time, Force Majeure is not
considered.
b. In case of force majeure, the parties may agree to extend the time limit for
performing contractual obligations; If the parties do not agree or do not reach an
agreement, the time limit for performance of contractual obligations shall be
calculated for an additional period of time equal to the time of occurrence of the
force majeure event, adding a reasonable time to remedy the consequences. As a
result, if the period of time is extended over the period specified in the law
applicable to this contract, the affected party will be exempted from performing
contractual obligations.
ARTICLE 10 - CLAIM
The Seller as the ability for processing the inspection of goods before shipment and
to bear all expenses occurred.
In the case of loss or damage after goods landed at port of arrival all by the Buyer
shall be made claim for quantity must be presented two months after arrival of
goods at Saigon Port claim for quality within three months after the goods at Saigon
Port, and shall be confirmed in writing together with survey report of the goods
inspection office of an authorized surveyor. The survey report of this authorized
surveyor should be regards as final.
Whenever such claim is to be proved as of the seller's responsibility. The seller shall
settle without delay.
ARTICLE 11 - ARBITRATION
a. During the implementation of this contract, if any dispute of both parties cannot
be resolved by negotiation and if the accused is the buyer, this dispute will be
settled by the Vietnam Foreign Trade Arbitration Council. Nam, under the Vietnam
Chamber of Commerce, handled the opposite.
b. The decision of the Vietnam Foreign Trade Arbitration Council in case the
accused is the purchaser will be considered to be final for both parties.
c. Arbitration fee and other related charges will be borne by the losing party unless
otherwise agreed.
Director Director