ODF

Product Specification

`
`

CONTENTS

A. Features………………………………………….…………… 1
B. Technical Parameters…………………………..…...... 1
C. Appearance & Structure……………………………… 3
D. Function………………………………………………………. 3
E. Product Structure
D.1 Dimension…………………………………...…..... 5
D.2 Cable Routing………….………….………….….. 6
F. Installation…………………………………………………. 7

`
`

FEATURES

• 19-23" standard frame, modularized splicing unit, termination unit or


integrated splicing & termination unit
• Applicable to different capacity optical fiber communication projects
• Easy to install, expand and maintain
• Modularized design

TECHNICAL PARAMETERS

Bending Radius 7-25 mm

Apex Offset 0-50 μm

Protrusion ≤ 50 mm

Optical Fiber Depression ≤ 125 mm; Bending Radius is


Depression/Protrusion between 7-10 mm
≤ -0.02R3+1.3R2-31R+325 when the bending
radius is other values
Insertion Loss ≤ 0.35 dB (APC)
Return Loss ≥ 65 dB (APC)
Insertion loss ≤ 0.5 dB (APC)
Interchangeability
Return loss ≥ 65 dB (APC)

50N 10min L=22cm additional loss ≤ 0.2 dB


Tensile Test
50N 10min L=22cm Return loss variable ≤ 5
dB
`

Page 1 of 28
`

TECHNICAL PARAMETERS

Insulation Resistance >1000MQ/500 V DC

Withstand Voltage >3000 V DC/min

Working Temperature -5℃~+45℃

Relative Humidity ≤85%(+30℃)

Storage Temperature -25℃~+55℃

Frame Structure fully enclosed rodent proof

Cable Bending Radius 15D

Page 2 of 28
`

APPEARANCE AND STRUCTURE

• The coating of the ODF is clean.


• The color is even without sagging or insufficient coverage.
• The metallic parts are free from burrs and corrosion. The plastic parts are
not deformed.
• The surface of the plastic parts are free from burrs and cracks.
• The color of the plastic parts are even.

FUNCTION

• For combined ODF, the final termination sub rack have optical fiber leading-
in, fixture, and protection devices that provide the following functions: 1.
Leads in the optical cable and fixes it on the rack. Protects the optical cable
and the fiber core from being damaged. 2. After the optical cable is
stripped, the fiber core is protected by protection device and led to fiber
termination unit after being fixed. 3. The metallic part of the optical cable
and the rack is insulated. 4. The metallic protection sheath and the
reinforced core after fixture has connect a high-voltage ground device.

• For combined ODF, the final termination sub rack have fiber termination
unit that is used for splicing, operating, installing, and maintaining fiber
cores and fiber pigtails. The final terminal unit is secure and protect the
connecting part from being displaced, avoid the influence caused by
external forces, and ensure the coiling fiber core and fiber pigtails from
being damaged.

Page 3 of 28
`

FUNCTION

• For combined ODF, perpendicular cabling channel is provided within the


rack. Horizontal channels shall be provided between sub racks. Through the
movable connector, the fiber core sequence can be rapidly and
conveniently dispatched and the sequence of the optical transmission
system can be changed to implement flexible fiber jumping between
different sub racks.

• For combined ODF, the final termination sub rack, cable distribution sub
rack, horizontal cabling channel, and perpendicular cabling channel are
configured in a complete set within the scope of full capacity.

• To access the splice-tray, patch panel can be swing- type/pivot-type, which


can either be swung to the left or right as long as the pivot point is located
on the side where the patchcord is routed from so that patchcord will not
be stretched.

Page 4 of 28
`

DIMENSIONS

900mm
300

450 mm
2200 mm

HDODF
40U Capacity

Frame Size 144 FDU Rack


Cabinet Capacity
L*W*H(mm) Capacity

HDODF 40U 900*450*2200 10

Page 5 of 28
`

CABLE ROUTING

10

Page 6 of 28
`

INSTALLATION

Page 7 of 28
`

INSTALLATION

A. FLOOR INSTALLATION
1.0 Determine the cabinet location

1.1 Plan the space for installation


450 mm

1100 mm

There are four


installation
holes at the
bottom of the
rack.

Page 8 of 28
`

INSTALLATION

A. FLOOR INSTALLATION
1.0 Determine the cabinet location

1.2 Location Marking

Place the line-drawing template at the position where


the cabinet will be installed, and mark the anchor hole
drilling locations using a marking pen.

Page 9 of 28
`

INSTALLATION

2.0 Expansion Bolt


2.1 Determine the Drill Bit
Remove the paper plate. If the floor surface is too hard
or too smooth to settle the drill bit, use a chisel to punch
a pit before drilling.

2.2 Drilling Holes


Drill Φ10 holes using a percussion drill. Clean the debris
using a vacuum cleaner when you drill the holes.

Page 10 of 28
`

INSTALLATION

2.3 Expansion Tube installation


2.3.1 Fasten the expansion bolt
clockwise until the guiding rib can
not fall out of the guiding slot.

2.3.2 Insert the expansion bolt


vertically into the hole.

2.3.3 Tap the expansion bolt using a


claw hammer until the expansion
tube is driven into the holes.

2.4 Bolt and Accessories Unscrewing

2.4.1 Fasten the expansion bolt


clockwise until the nut cannot fall
out of the bolt.

2.4.2 Turn the bolt


counterclockwise, remove it, and
take off the spring washer and plain
washer.

Page 11 of 28
`

INSTALLATION

3.0 Fixing the Cabinet


3.1 Opening the Cabinet Door

3.2 Positioning the Cabinet


3.2.1 Remove the fiber spool unit, place the cabinet at the
planned position, and align the expansion bolt holes with the
holes in
the cabinet.
3.2.2 Fit the spring washers and plain washers on the four
expansion bolts, insert the expansion bolts into the
expansion
tubes, and tighten the expansion nuts a bit (do not fasten
them).
3.2.3 Adjust the horizontal level of the cabinet using an
industrial horizontal ruler, and tighten the expansion bolts
`
to fix the cabinet.

Page 12 of 28
`

INSTALLATION

B. ANTI-STATIC FLOOR INSTALLATION


1.0 Determine the base location
1.1 Plan the space for installation
There are four installation holes at the bottom of the rack.

1.2 Base Outline


Remove the antistatic floor at the position where the cabinet
will be installed. Place the line-drawing template at the
corresponding cement ground, and mark the anchor hole
drilling locations using a marking pen.

Page 13 of 28
`

INSTALLATION

2.0 Expansion Bolt


2.1 Determine the Drill Bit

Remove the paper plate. If the floor


surface is too hard or too smooth
to settle the drill bit, use a chisel to
punch a pit before drilling.

2.2 Drilling Holes

Drill Φ10 holes using a percussion drill. Clean the


debris using a vacuum cleaner when you drill the holes.

Page 14 of 28
`

INSTALLATION

2.3 Expansion Tube installation


2.3.1 Fasten the expansion bolt clockwise until the guiding rib
can not fall out of the guiding slot.
2.3.2 Insert the expansion bolt vertically into the hole.

2.3.3 Tap the expansion bolt using a claw hammer until the
expansion tube is driven into the holes.

2.4 Bolt and Accessories Unscrewing

2.4.1 Fasten the expansion bolt


clockwise until the nut cannot fall
out of the bolt.

2.4.2 Turn the bolt


counterclockwise, remove it, and
take off the spring washer and plain
washer.
`

Page 15 of 28
`

INSTALLATION

3.0 Fixing the Cabinet


3.1 Installing the base
3.1.1 Unscrew the height locking bolts using an adjustable
wrench, and adjust the height of the base. Ensure that the
height scale on the base indicates the height of the antistatic
floor. Tighten the height locking bolts.

3.1.2 Align the expansion bolt holes on the floor with the
installation holes of the base, fit the spring washers and plain
washers on the four expansion bolts, insert them to the
installation holes, and tighten the expansion nuts a bit (do not
fasten them).
3.1.3 Adjust the horizontal level of the base using an industrial
horizontal ruler, and tighten the expansion bolts to fix the base.

Page 16 of 28
`

INSTALLATION

3.2 Positioning the Cabinet

3.2.1 Determine the front direction of the cabinet, place


the cabinet on the base, and align the installation holes of
the base with the installation holes of the cabinet.

3.2.2 Fit the spring washers and plain washers on the four
expansion bolts, insert them to the installation holes, and
tighten the expansion nuts a bit (do not fasten them).

3.2.3 Adjust the horizontal level of the cabinet using an


industrial horizontal ruler, and tighten the expansion bolts
to fix the cabinet.

Page 17 of 28
`

INSTALLATION

FDU Installation

Remove the packing of the splitter. Take out the floating


nuts, and install them to the corresponding 19-inch
installation holes. Fit the panel screws into the mounting
ears of the splitter, and tighten the screws to fix the splitter.

Page 18 of 28
`

INSTALLATION

Leading in, Stripping, Fixing, and Grounding Optical Fibers


Leading in the Fiber Optic Cable
Lead in the optical cable through the cable leading-in hole at
the middle top of the cabinet..

Page 19 of 28
`

INSTALLATION

Stripping and Fixing the Fiber Optic Cable

1.0 Preparation: Strip about 3.5 m of the optical cable, and


reserve about 50 mm of the strength member and about 30
mm of the metal layer.

2.0 Stripping:
a) After strip the optical cable according to the
requirements, clean the bare fiber.
b) Install the fiber protection tube and make sure that each
bundle of bare fibers is enclosed in the same tube.
c) Use insulation tape to wrap the stripping point of the
optical cable.

Page 20 of 28
`

INSTALLATION

Stripping and Fixing the Fiber Optic Cable

3.0 Insert the strength member


into the hole in the fixing post.

4.0 Install the hoop iron to fix the optical cable.


5.0 Fix the strengthen member.

6.0 Lay the bare fibers with the fiber protection tubes at the
right part of the cabinet. The bare fibers hang down
naturally. Put the bare fibers into the cabling cycle, bind
them using cable straps after being spliced.

Page 21 of 28
`

INSTALLATION

6.0 Lay the bare fibers with the fiber protection tubes at the
right part of the cabinet. The bare fibers hang down
naturally. Put the bare fibers into the cabling cycle, bind
them using cable straps after being spliced.

Grounding the Fiber Optic Cable

Lead the 8 mm2 ground wire


from the ground flag to the
protection ground.

Page 22 of 28
`

INSTALLATION

Laying the Patch Cord

1.0 Patch Cords inside the Cabinet

1.1 Connect one end of the patch cord to the adapter of the
splitter, and the other end to the adapter of the integrated
splicing and termination unit.

1.2 Hang the patch cord on the left cabling plates of the
splitter and the integrated splicing and termination unit.

Page 23 of 28
`

INSTALLATION

1.3 Coil the patch cord around the optical fiber post.

Page 24 of 28
`

INSTALLATION

2.0 Patchcords between Racks


There are two scenarios:
Scenario 1: Patch cords between the integrated splicing and
termination unit and another cabinet
A.1 Lead in the patch cord from the fiber leading-in hole at
the left of the cabinet.
A.2 Hand the patch cords on the left cabling plate of the
inte-grated splicing and termination unit.
A.3 Insert the adapter of the patch cord to the adapter port
of the integrated splicing and termination unit.
A.4 Coil the patch cords around the optical fiber post.

Page 25 of 28
`

INSTALLATION

2.0 Patchcords between Racks


B.1 Lead in the patch cord from the fiber leading-in hole at
the left of the cabinet.
B.2 Hand the patch cords on the left cabling plate of the
splitter.
B.3 Insert the adapter of the patch cord to the adapter port
of the splitter.
B.4 Coil the patch cords around the optical fiber post.

Page 26 of 28
`

INSTALLATION

3.0 Filling in Route Identity Label


3.1 Fill in the route identity label on the door panel of the
optical splitter unit.

3.2 Fill in the route identity label on the door panel of the
integrated splicing and termination unit.

3.3 Fill in the route identity label at the joint of pigtail.


`

Page 27 of 28
`

INSTALLATION

Closing the Cabinet Door

Checklist after the installation

Page 28 of 28
China Telecommunication Technology Labs

Report code: F16X76622

TEST REPORT

Product Name: Optical Distribution Frame


Model : GPX167
Manufacturer: Nanjing Huamai technology Co.,Ltd
Test type : First inspection of product certification

China Telecommunication Technology Labs


China Telecommunication Technology Labs

China Telecommunication Technology Labs

TEST REPORT

Product name ODF Model GPX167

Nanjing Huamai Technology


Applicant Production Date 2016.08.30
Co., Ltd.
Nanjing Huamai Technology
Manufacturer Test type First inspection
Co., Ltd.
No.66, Fengze Road, Industrial Zone, Dongshan Street, Jiangning District,
Production
Nanjing, Jiangsu Province
Address
12

Date 2016.10.29 sample sender Zhumengtong

Sample Qty ODF *1 , Patchcord 10 pcs , splicing tray and distribution tray 2 pcs

Sample Status The sample is in good condition,Comply with the inspection requirements

Test standard YD/T 778-2011《ODF》

The GPX167 ODF of this company , after testing , conclusion as follow :


Test Item : 44
Measured project:44
Inspection
Unrelated item:0
Conclusion
Unqualified item:0 ( B 0 , C0 )
This prduct is qualified. Match the standard.
Signed date : 2016.12.13

Test according to China Telecommunication Technology Labs engagement letter


Remarks
1609056 . TLC<ODF>

Approve : review: Principal inspector:


China Telecommunication Technology Labs

Inspection List

Unqulified Classfies
NO. TEST ITEM Conclusions
CLASS B CLASS C
Ⅰ.Frame

1 Appearence & Structure 〇 Qualified

2 Fucntion Requirement 〇 Qualified

3 Coating adhesion 〇 Qualified

4 Voltage tolerance level 〇 Qualified

5 Insulation resistance 〇 Qualified

6 Combustion experiment 〇 Qualified

7 Appearence 〇 Qualified

8 High Temperature Dielectric strength 〇 Qualified

9 Insulation resistance 〇 Qualified

10 Appearence 〇 Qualified

11 Low Temperature Dielectric strength 〇 Qualified

12 Insulation resistance 〇 Qualified

13 Appearence 〇 Qualified

14 Damp heat test Dielectric strength 〇 Qualified

15 Insulation resistance 〇 Qualified


16 Salt spray test Appearence 〇 Qualified
Ⅱ. Fiber optical connetcor

1 Insertion Loss 〇 Qualified

2 Ruturn Loss 〇

3 radius of curvature 〇
End Face
4 Apex Offset 〇
Size
5 Fiber Sunken (Bulge) 〇
China Telecommunication Technology Labs

Inspection List

Unqulified Classfies
NO. TEST ITEM Conclusions
CLASS B CLASS C

6 Insertion Loss 〇 Qualified


Interchangeability
7 Return Loss 〇 Qualified

8 Appearence 〇 Qualified
Mechanical
9 Additional losses 〇 Qualified
durability test
10 Return Loss Variation 〇 Qualified

11 Appearence 〇 Qualified

12 Tensile Test Additional losses 〇 Qualified

13 Return Loss Variation 〇 Qualified

14 Appearence 〇 Qualified

15 High Temperature Additional losses 〇 Qualified

16 Return Loss Variation 〇 Qualified

17 Appearence 〇 Qualified

18 Low Temperature Additional losses 〇 Qualified

19 Return Loss Variation 〇 Qualified

20 Appearence 〇 Qualified

21 Damp heat test Additional losses 〇 Qualified

22 Return Loss Variation 〇 Qualified


23 Appearence 〇 Qualified
24 Salt spray test Additional losses 〇 Qualified

25 Return Loss Variation 〇 Qualified

26 Appearence 〇 Qualified

27 Shaking Test Additional losses 〇 Qualified

28 Return Loss Variation 〇 Qualified


China Telecommunication Technology Labs

Test Report
Ⅰ. Test Conclusion
1. GPX167 Frame

NO. TEST ITEM Unit Technical Requirement Test result Conclusions

mm Size: Height have 2600mm ,2200mm Height x Width


and 2000mm three type . Width better to x depth
choose integer multiples of 120mm , 2200*840*300
1 depth better to choose 300mm ,
Appearence 450mm,600mm . Size tolerance should
& Structure less than ±2mm, Vertical tolerance
should not over 3mm. Qualified
--- Mechanical activity:The mechanical part Compliant
should be rotated flexibly , The opening
angle of the door should not be less
than 110°, The gap should not be
greater than 3mm.
--- Frame structure: The structure should Compliant
be firm,No loosening of fastener
--- Optical cable bending radius: When the Compliant
optical cable enters the frame, the
allowable bending radius should be no
less than 15 times of the diameter of the
optical cable.
--- Protection tube , fiber and pigtail Compliant
bending radius : When optical cable
through the hole of steel panel,should
have protection tube and gasket .Fiber
and pigtail allowable benidng radius
cannot less than 30mm , Non-sensitive
optical fiber, allowable bending radius
not less than 15mm
--- Appearence : ODF coating surface Compliant
should smooth , Color uniformity, No
rust of metal.Plastic parts have no
deformation .
--- Logo should clear ,complete and no Compliant
error.
China Telecommunication Technology Labs

1. GPX167 Frame

NO
TEST ITEM Unit Technical Requirement Test result Conclusions
.
mm Optical entry , fasten and protect Height x Width Qualified
function : Should have optical entry and x depth
ground wire unit . a.) Entry optical cable 2200*840*300
and fasten it on the frame , protect the
fiber and confirm do not damage fiber. b.)
After stripe cable,should have device to
protect them . c.)Partial insulation of
metal. d.) The fixed metal cable
sheath should be able to connect to the
Function high voltage grounding device.
2 Requirement --- Fiber end connect : Should have end Compliant Qualified
connector unit . This unit should easier
for pigtail connect ,fiber splicing ,protect
the pigtail .
--- Line function : There should be set a Compliant Qualified
vertical line channel .Quick and
convenient scheduling fiebr number
--- Capacity : Every ODF capacity and unit Compliant Qualified
capacity should describe in the manual ,
It should be configured in a complete set
--- Marking Function : Frame and unti should Compliant Qualified
have complete record part , for easier to
recognize the fiber number.
--- Fiber storage function : Fame and Unti Compliant Qualified
should have enough space to storage
redundant fiber cable .
--- PLC Splitter installation and connect Compliant Qualified
(optional) :Should have space for PLC
splitter use
China Telecommunication Technology Labs

1. GPX167 Frame

NO Conclusio
TEST ITEM Unit Technical Requirement Test result
. n
Use metal parts with coating Compliant Qualified
treatment,The coating should have
good adhesion Adhesion
3 Coating adhesion mm cannot lower than GB/T
9286-1998 requirement .
4 Voltage tolerance level -- Frame High pressure protection No Qualified
grounding with frame ≥ 3000V , breakdown,
No breakdown, no flying arc no flying arc
5 Insulation resistance MΩ Frame High pressure protection >1x105 Qualified
grounding with frame ≥ 1000MΩ
6 Burning test s Match standard below : a. The test Burning time Qualified
sample is not burning b.The after leaving
combustion time does not exceed fire:
10s after leaving the flame. First : 2 s
Second: 3s
No falme
7 High -- ODF surface should clear and Compliant Qualified
Temp smooth and clear , The color is
test Appearence uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .
8 Voltage -- Frame High pressure protection Compliant
tolerance grounding with frame ≥ 3000V ,
level No breakdown, no flying arc
9 Insulation MΩ Frame High pressure protection Compliant
resistance grounding with frame ≥ 1000MΩ
10 Low ODF surface should clear and Compliant Qualified
Temp smooth and clear , The color is
test Appearence uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .
11 Voltage Frame High pressure protection No
tolerance grounding with frame ≥ 3000V , breakdown,
level No breakdown, no flying arc no flying arc
12 Insulation MΩ Frame High pressure protection >1x105
resistance grounding with frame ≥ 1000MΩ
China Telecommunication Technology Labs

13 Damp -- ODF surface should clear and Compliant Qualified


heat smooth and clear , The color is
test uniform and without coating
Appearence
leak .No rust of metal.Plastic parts
have no deformation .

14 Voltage -- Frame High pressure protection No


tolerance grounding with frame ≥ 3000V , breakdown,
level No breakdown, no flying arc no flying arc

15 Insulation MΩ Frame High pressure protection >1x105


resistance grounding with frame ≥ 1000MΩ

16 salt Appearence - ODF surface should clear and Compliant Qualified


spray smooth and clear , The color is
test uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .

No content
China Telecommunication Technology Labs

Ⅱ FC/UPC Fiber optical connector


NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
1 Insertion Loss dB ≤0.35 1310nm : 0.05~0.13 Qualified

2 Return Loss dB UPC ≥50 1310nm : 52~54 Qualified

code End face Value

1# A 14.54

B 14.29
2# A 13.24
B 13.64
3# A 11.83

3 End radius of mm PC R= 7~25 B 14.31


Face curvature APC R=5~12 4# A 13.23
Size
B 10.78
Qualified
5# A 16.32
B 15.02
6# A 11.37
B 12.82
7# A 13.94
B 13.60
8# A 14.54
B 14.20
9# A 13.78
B 13.80
10# A 13.67
B 13.30
China Telecommunication Technology Labs

NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
code End face Value

1# A 35.37

B 22.78
2# A 27.31
B 36.89
3# A 42.31

4 End Apex μm PC APC B 29.54


Face offset 0~50 4# A 13.47
Size
B 39.20
5# A 19.76
B 36.75 Qualified

6# A 38.02
B 40.04
7# A 27.86
B 19.11
8# A 36.05
B 42.34
9# A 29.51
B 40.74
10# A 25.76
B 41.44
China Telecommunication Technology Labs

NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
code End face Value

1# A 21

B 23
2# A 30
B 9
3# A 30

5 End Fiber nm PC sunken≤125 B 24


Face Sunken (radius of 4# A 5
Size (Bulge) curvature about
B 15
7~10mm)
5# A 16
PC sunken≤ B 20
-0.02R3+1.3R3-31R
6# A -5
+325
B 36 Qualified
PC Bulge≤50 7# A 24
APC±100
B 2
8# A 13
B 15
9# A 15
B 19
10# A 17
B 27
China Telecommunication Technology Labs

Test Report
NO Conclusi
TEST ITEM Unit Technical Requirement Test result
. ons

6 interchang Insertion Loss dB ≤ 0.5 1310nm: 0.12~0.16


7 eability Return Loss dB UPC≥48 1310nm:51~52
8 - No mechanical Compliant
damage, shedding or
Appearence
Mechanical deformation will be
durability allowed after the test.
9 test Additional losses dB ≤0.2 1310nm: 0.02

10 Return Loss dB ≤5 1310nm:1


Variation
11 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
Tensile Test allowed after the test.
12 Additional losses dB ≤0.2 1310nm: 0.01~0.07
13 Return Loss dB ≤5 1310nm:1~1
Variation Qualified
14 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
High
allowed after the test.
Temperatur
15 e Additional losses
dB ≤0.2 1310nm: 0.00~0.13

16 Return Loss dB ≤5 1310nm:0~1


Variation
17 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
Low
allowed after the test.
Temperatur
18 dB ≤0.2 1310nm: 0.01~0.02
e Additional losses

19 Return Loss dB ≤5 1310nm:0~1


Variation
20 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
Damp heat allowed after the test.
21 test dB ≤0.2 1310nm: 0.02~0.07
Additional losses
22 Return Loss dB ≤5 1310nm:0~1
Variation
China Telecommunication Technology Labs

23 - No mechanical Compliant
damage, shedding or Conclusi
Appearence
deformation will be ons
allowed after the test.
24 dB ≤0.2 1310nm: 0.00~0.08
Salt spray
test Additional losses

25 dB ≤5 1310nm:0~0
Return Loss Qualified
Variation

26 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
allowed after the test.
27 dB ≤0.2 1310nm: 0.01~0.02
Shaking
Test Additional losses

28 dB ≤5 1310nm:1 ~ 1
Return Loss
Variation

No Content
China Telecommunication Technology Labs

Testing conditions for environmental and mechanical


properties
Test Item Condition
Test temperature: 55℃±2℃
High temperature
Test Time: 2h
Test temperature: -25℃ ± 3℃
Low temperature
Test Time: 2h
Test temperature: 40℃±2℃
Damp heat test
Relative humidity: 93% ± 3%
Test Time: 48h
Frequency range: 10Hz ~ 55Hz
Shaking
sweep frequency : every min each octave
Tolerance : ±10%
Swing: 0.75 single shaking
Last time: 30min
Test temperature: 35℃ ± 2℃
Salt spray test
Test Time:48h
Brine strength : 5%
Loading : 50N
Tensile
Loading time:10min
Load rating :50N/min ~250N/min
Distance:22~28cm
Insert and pulling : 500 times
Mechanical durability
Height : (20±2)mm , blue flame , time : 30s
Burning
China Telecommunication Technology Labs