Product Specification
`
`
CONTENTS
A. Features………………………………………….…………… 1
B. Technical Parameters…………………………..…...... 1
C. Appearance & Structure……………………………… 3
D. Function………………………………………………………. 3
E. Product Structure
D.1 Dimension…………………………………...…..... 5
D.2 Cable Routing………….………….………….….. 6
F. Installation…………………………………………………. 7
`
`
FEATURES
TECHNICAL PARAMETERS
Protrusion ≤ 50 mm
Page 1 of 28
`
TECHNICAL PARAMETERS
Page 2 of 28
`
FUNCTION
• For combined ODF, the final termination sub rack have optical fiber leading-
in, fixture, and protection devices that provide the following functions: 1.
Leads in the optical cable and fixes it on the rack. Protects the optical cable
and the fiber core from being damaged. 2. After the optical cable is
stripped, the fiber core is protected by protection device and led to fiber
termination unit after being fixed. 3. The metallic part of the optical cable
and the rack is insulated. 4. The metallic protection sheath and the
reinforced core after fixture has connect a high-voltage ground device.
• For combined ODF, the final termination sub rack have fiber termination
unit that is used for splicing, operating, installing, and maintaining fiber
cores and fiber pigtails. The final terminal unit is secure and protect the
connecting part from being displaced, avoid the influence caused by
external forces, and ensure the coiling fiber core and fiber pigtails from
being damaged.
Page 3 of 28
`
FUNCTION
• For combined ODF, the final termination sub rack, cable distribution sub
rack, horizontal cabling channel, and perpendicular cabling channel are
configured in a complete set within the scope of full capacity.
Page 4 of 28
`
DIMENSIONS
900mm
300
450 mm
2200 mm
HDODF
40U Capacity
Page 5 of 28
`
CABLE ROUTING
10
Page 6 of 28
`
INSTALLATION
Page 7 of 28
`
INSTALLATION
A. FLOOR INSTALLATION
1.0 Determine the cabinet location
1100 mm
Page 8 of 28
`
INSTALLATION
A. FLOOR INSTALLATION
1.0 Determine the cabinet location
Page 9 of 28
`
INSTALLATION
Page 10 of 28
`
INSTALLATION
Page 11 of 28
`
INSTALLATION
Page 12 of 28
`
INSTALLATION
Page 13 of 28
`
INSTALLATION
Page 14 of 28
`
INSTALLATION
2.3.3 Tap the expansion bolt using a claw hammer until the
expansion tube is driven into the holes.
Page 15 of 28
`
INSTALLATION
3.1.2 Align the expansion bolt holes on the floor with the
installation holes of the base, fit the spring washers and plain
washers on the four expansion bolts, insert them to the
installation holes, and tighten the expansion nuts a bit (do not
fasten them).
3.1.3 Adjust the horizontal level of the base using an industrial
horizontal ruler, and tighten the expansion bolts to fix the base.
Page 16 of 28
`
INSTALLATION
3.2.2 Fit the spring washers and plain washers on the four
expansion bolts, insert them to the installation holes, and
tighten the expansion nuts a bit (do not fasten them).
Page 17 of 28
`
INSTALLATION
FDU Installation
Page 18 of 28
`
INSTALLATION
Page 19 of 28
`
INSTALLATION
2.0 Stripping:
a) After strip the optical cable according to the
requirements, clean the bare fiber.
b) Install the fiber protection tube and make sure that each
bundle of bare fibers is enclosed in the same tube.
c) Use insulation tape to wrap the stripping point of the
optical cable.
Page 20 of 28
`
INSTALLATION
6.0 Lay the bare fibers with the fiber protection tubes at the
right part of the cabinet. The bare fibers hang down
naturally. Put the bare fibers into the cabling cycle, bind
them using cable straps after being spliced.
Page 21 of 28
`
INSTALLATION
6.0 Lay the bare fibers with the fiber protection tubes at the
right part of the cabinet. The bare fibers hang down
naturally. Put the bare fibers into the cabling cycle, bind
them using cable straps after being spliced.
Page 22 of 28
`
INSTALLATION
1.1 Connect one end of the patch cord to the adapter of the
splitter, and the other end to the adapter of the integrated
splicing and termination unit.
1.2 Hang the patch cord on the left cabling plates of the
splitter and the integrated splicing and termination unit.
Page 23 of 28
`
INSTALLATION
1.3 Coil the patch cord around the optical fiber post.
Page 24 of 28
`
INSTALLATION
Page 25 of 28
`
INSTALLATION
Page 26 of 28
`
INSTALLATION
3.2 Fill in the route identity label on the door panel of the
integrated splicing and termination unit.
Page 27 of 28
`
INSTALLATION
Page 28 of 28
China Telecommunication Technology Labs
TEST REPORT
TEST REPORT
Sample Qty ODF *1 , Patchcord 10 pcs , splicing tray and distribution tray 2 pcs
Sample Status The sample is in good condition,Comply with the inspection requirements
Inspection List
Unqulified Classfies
NO. TEST ITEM Conclusions
CLASS B CLASS C
Ⅰ.Frame
7 Appearence 〇 Qualified
10 Appearence 〇 Qualified
13 Appearence 〇 Qualified
2 Ruturn Loss 〇
3 radius of curvature 〇
End Face
4 Apex Offset 〇
Size
5 Fiber Sunken (Bulge) 〇
China Telecommunication Technology Labs
Inspection List
Unqulified Classfies
NO. TEST ITEM Conclusions
CLASS B CLASS C
8 Appearence 〇 Qualified
Mechanical
9 Additional losses 〇 Qualified
durability test
10 Return Loss Variation 〇 Qualified
11 Appearence 〇 Qualified
14 Appearence 〇 Qualified
17 Appearence 〇 Qualified
20 Appearence 〇 Qualified
26 Appearence 〇 Qualified
Test Report
Ⅰ. Test Conclusion
1. GPX167 Frame
1. GPX167 Frame
NO
TEST ITEM Unit Technical Requirement Test result Conclusions
.
mm Optical entry , fasten and protect Height x Width Qualified
function : Should have optical entry and x depth
ground wire unit . a.) Entry optical cable 2200*840*300
and fasten it on the frame , protect the
fiber and confirm do not damage fiber. b.)
After stripe cable,should have device to
protect them . c.)Partial insulation of
metal. d.) The fixed metal cable
sheath should be able to connect to the
Function high voltage grounding device.
2 Requirement --- Fiber end connect : Should have end Compliant Qualified
connector unit . This unit should easier
for pigtail connect ,fiber splicing ,protect
the pigtail .
--- Line function : There should be set a Compliant Qualified
vertical line channel .Quick and
convenient scheduling fiebr number
--- Capacity : Every ODF capacity and unit Compliant Qualified
capacity should describe in the manual ,
It should be configured in a complete set
--- Marking Function : Frame and unti should Compliant Qualified
have complete record part , for easier to
recognize the fiber number.
--- Fiber storage function : Fame and Unti Compliant Qualified
should have enough space to storage
redundant fiber cable .
--- PLC Splitter installation and connect Compliant Qualified
(optional) :Should have space for PLC
splitter use
China Telecommunication Technology Labs
1. GPX167 Frame
NO Conclusio
TEST ITEM Unit Technical Requirement Test result
. n
Use metal parts with coating Compliant Qualified
treatment,The coating should have
good adhesion Adhesion
3 Coating adhesion mm cannot lower than GB/T
9286-1998 requirement .
4 Voltage tolerance level -- Frame High pressure protection No Qualified
grounding with frame ≥ 3000V , breakdown,
No breakdown, no flying arc no flying arc
5 Insulation resistance MΩ Frame High pressure protection >1x105 Qualified
grounding with frame ≥ 1000MΩ
6 Burning test s Match standard below : a. The test Burning time Qualified
sample is not burning b.The after leaving
combustion time does not exceed fire:
10s after leaving the flame. First : 2 s
Second: 3s
No falme
7 High -- ODF surface should clear and Compliant Qualified
Temp smooth and clear , The color is
test Appearence uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .
8 Voltage -- Frame High pressure protection Compliant
tolerance grounding with frame ≥ 3000V ,
level No breakdown, no flying arc
9 Insulation MΩ Frame High pressure protection Compliant
resistance grounding with frame ≥ 1000MΩ
10 Low ODF surface should clear and Compliant Qualified
Temp smooth and clear , The color is
test Appearence uniform and without coating
leak .No rust of metal.Plastic parts
have no deformation .
11 Voltage Frame High pressure protection No
tolerance grounding with frame ≥ 3000V , breakdown,
level No breakdown, no flying arc no flying arc
12 Insulation MΩ Frame High pressure protection >1x105
resistance grounding with frame ≥ 1000MΩ
China Telecommunication Technology Labs
No content
China Telecommunication Technology Labs
1# A 14.54
B 14.29
2# A 13.24
B 13.64
3# A 11.83
NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
code End face Value
1# A 35.37
B 22.78
2# A 27.31
B 36.89
3# A 42.31
6# A 38.02
B 40.04
7# A 27.86
B 19.11
8# A 36.05
B 42.34
9# A 29.51
B 40.74
10# A 25.76
B 41.44
China Telecommunication Technology Labs
NO Technical
TEST ITEM Unit Test Conclusions Conclusions
. Requirement
code End face Value
1# A 21
B 23
2# A 30
B 9
3# A 30
Test Report
NO Conclusi
TEST ITEM Unit Technical Requirement Test result
. ons
23 - No mechanical Compliant
damage, shedding or Conclusi
Appearence
deformation will be ons
allowed after the test.
24 dB ≤0.2 1310nm: 0.00~0.08
Salt spray
test Additional losses
25 dB ≤5 1310nm:0~0
Return Loss Qualified
Variation
26 - No mechanical Compliant
damage, shedding or
Appearence
deformation will be
allowed after the test.
27 dB ≤0.2 1310nm: 0.01~0.02
Shaking
Test Additional losses
28 dB ≤5 1310nm:1 ~ 1
Return Loss
Variation
No Content