Learning Objectives
• To define what is hazard, risk and danger
• Risk control
Copyright@NIOSH 2005(2) 3
Overview Of Risk And
Risk Assessment
Copyright@NIOSH 2005(2) 4
Definitions
• Hazard: A source or a situation with a
potential for harm in terms of human
injury or ill health, damage to property,
damage to the environment or a
combination of these
Copyright@NIOSH 2005(2) 5
Definitions
Copyright@NIOSH 2005(2) 6
Risk Assessment
Copyright@NIOSH 2005(2) 7
Basic Principles Of
Risk Management
1. Integrate Risk Management as part
of planning at all levels of business
2. Accept all risks
3. Make risk decisions appropriately
(depending on level of risk)
4. Manage the risk
Copyright@NIOSH 2005(2) 8
Why Carry Out
Risk Assessment?
• Gives organisations a more effective way
of managing hazards
• Requirement of the law e.g.
– OSHA 1994, CIMAH Regulations 1996 &
USECHH Regulations 2000
• Requirement of OSH management
system standards:
– MS 1722:2003,
– OHSAS 18001 and
– ISO 14001, etc.
Copyright@NIOSH 2005(2) 9
Risk Assessment Should Be
Carried Out For:
• Routine and non-routine activities
including emergencies
• Before Operation
• During Operation
• After Operation
Copyright@NIOSH 2005(2) 11
When To Review
Risk Assessment
• Types of review:
– initial review
– periodic review
Copyright@NIOSH 2005(2) 12
When To Review
Risk Assessment
• Review whenever there are changes:
– internal
• Before modification, changes or introduction of
new
– Materials, machinery or processes, working
procedures
– external
• Amendments of national laws and regulations
• Developments in OSH knowledge and technology
Copyright@NIOSH 2005(2) 13
Who Will Carry Out
Risk Assessment
• Person or persons trained to identify hazard and
risk assessment
– In some cases legally competent person,
example : Chemical Health Risk Assessor
• Involvement of supervisors
Copyright@NIOSH 2005(2) 14
Basic Components Of
Risk Management
• Hazard Identification
• Risk Assessment
• Risk Control
• Review
Copyright@NIOSH 2005(2) 15
The Process of
Risk Management
Start
Classify Activities
(Work, Product, Services, Activities)
Identify Hazards
Copyright@NIOSH 2005(2) 17
SOURCES OF HAZARDS
Man Unsafe acts
Machinery Installation, layout and design of
equipment
Materials Substances such as chemicals and
gases use in the workplace
Method The way people carry out their
work
Media Workplace condition i.e. air quality,
ventilation, lighting, noise, vibration
etc.
Copyright@NIOSH 2005(2) 18
Classification and
Potential Sources of Hazards
Classification Example of Potential Sources of
of Hazards Hazards
Copyright@NIOSH 2005(2) 19
Classification and
Potential Sources of Hazards
Classification Example of Potential Sources of
of Hazards Hazards
Copyright@NIOSH 2005(2) 20
Pre-Assessment –
Information Gathering
• Information on the facilities, processes and
activities of the organization, including:
– Area Map
– Site plan(s); own and neighbor
– Process flow-charts
– Inventory of materials (raw materials,
chemicals, wastes, products, sub-products)
– Toxicology and other health and safety data
– Monitoring data
Copyright@NIOSH 2005(2) 21
Pre-Assessment –
Classifying Work Activities
• Geographical areas within/outside the
premises
• Stages in a production process, or in the
provision of a service
• Defined the tasks (e.g. driving, window
cleaning)
• Identify the working groups
• Land use, previous property use, future use
Copyright@NIOSH 2005(2) 22
Methods Of
Identifying Hazards
• Review of documents and publications
• Hazard Analysis
Copyright@NIOSH 2005(2) 23
Document Review
Copyright@NIOSH 2005(2) 24
Inspection and Observation
• Types of inspections: statutory
inspection, periodic inspection, formal
and informal inspection
Copyright@NIOSH 2005(2) 25
Inspection and Observation
• Activities - to involve supervisors,
managers and employees
Copyright@NIOSH 2005(2) 26
Exposure Monitoring
• Types of monitoring: area and personal
monitoring.
• Monitoring of:
– Noise
– Heat
– Radiation
– Air contaminants
– Chemicals etc.
Copyright@NIOSH 2005(2) 27
Biological Monitoring
• Biological monitoring is a regular
measuring activity where selected
validated indicators of the uptake of toxic
substances in the human body are
determined in order to prevent health
impairment
Copyright@NIOSH 2005(2) 29
Medical Surveillance
– Substance is hazardous
Copyright@NIOSH 2005(2) 31
Job Safety Analysis (JSA)
Copyright@NIOSH 2005(2) 32
Job Safety Analysis (JSA)
• Note:
– The term JSA includes the formulation
of safe work procedures using written
instructions for workers
•No water flow occurs if both pumps fail or if the control valve fails.
•If the individual initiating event probabilities P(A), P(B), and P(C) are known,
then the probability of P(T) the top or end event can be calculated.
Copyright@NIOSH 2005(2) 36
Risk Assessment
Copyright@NIOSH 2005(2) 37
Types of Risk Assessment
Approach:
Copyright@NIOSH 2005(2) 38
Determining Severity
– Harm to health
– Damage to property
– Damage to environment
– Or the combination of the above
Copyright@NIOSH 2005(2) 39
Severity
Determine severity categories i.e.:
• Fatality
Copyright@NIOSH 2005(2) 41
Likelihood
Copyright@NIOSH 2005(2) 42
Qualitative Risk Table
Severity Likelihood
Very Likely Likely Unlikely Highly Unlikely
Fatality High High High Medium
Major Injuries High High Medium Medium
Minor Injuries High Medium Medium Low
Negligible Injuries Medium Medium Low Low
Copyright@NIOSH 2005(2) 43
Semi - Quantitative
Risk Assessment
Determine severity categories i.e.:
• 4: Fatality & Permanent Disability
Copyright@NIOSH 2005(2) 44
Semi - Quantitative
Risk Assessment
Determining Likelihood of Occurrence of
Hazard
• 4: Daily
• 3: Weekly
• 2: Monthly
1 2 3 4
SEVERITY
First Aid
and Near 1 1 2 3 4
Misses
Less than
or 4 days 2 2 4 6 8
MC
More than
4 days MC 3 3 6 9 12
Fatality &
Permanent 4 4 8 12 16
Disability
Copyright@NIOSH 2005(2) 46
Quantitative
Risk Assessment
• Where the hazards presented by the
undertaking are numerous and complex,
and may involve novel processes, for
example in the case of large chemicals
process plants, detailed and sophisticated
risk assessments will be needed, and it is
appropriate to carry out a detailed
quantitative risk assessment
Copyright@NIOSH 2005(2) 47
Quantitative
Risk Assessment
Copyright@NIOSH 2005(2) 48
Quantitative
Risk Assessment
Copyright@NIOSH 2005(2) 49
Quantitative
Risk Assessment
• Where such methods and techniques are
used it is important that they are carried
out by suitably qualified and experience
assessors
Copyright@NIOSH 2005(2) 50
Decision For Action
AS LOW AS REASONABLY PRACTICABLE (ALARP)
PRINCIPLE
Copyright@NIOSH 2005(2) 52
Risk Control
Copyright@NIOSH 2005(2) 53
Principle of Control
•Housekeeping
•Substitution •Training and
•General
•Modify process education
ventilation
•Enclosure •Worker rotation
•Continuous area
•Local exhaust •Enclosure of
monitoring
•Fugitive worker
•Dilution
emission control •Personal
ventilation
•Isolation monitoring
•Automation or
•Personal
remote control
protective devices
Copyright@NIOSH 2005(2) 54
Consideration In Implementing
Risk Control
• Review measures regularly; modify if
necessary
Copyright@NIOSH 2005(2) 55
Consideration In Implementing
Risk Control
Copyright@NIOSH 2005(2) 56
Hierarchy Of Control
MOST EFFECTIVE
Elimination - remove the hazard.
FAIRLY EFFECTIVE
Substitution - use less hazardous one.
Isolation – isolate the work area i.e. X-ray machine in
restricted room
Engineering Control – design, isolation at source,
barricade, guarding,
LEAST EFFECTIVE
Administrative Control – safe work procedure, isolation
i.e. reduce exposure time and limit, training, signage etc
PPE - last resort. Copyright@NIOSH 2005(2) 57
Summary
Copyright@NIOSH 2005(2) 58