2000 2000

A B C D 875 250 875


250 1750

8330
2865 5465

775
775
BARS, B.W
1490 1375 2653 2815 BARS, B.W

2400

2000
W/ 10MM LATERAL TIES

450
2000
450
1 SET
W/ 10MM LATERAL TIES
1 SET
4@100, REST @ 125 TO
2600

CENTER LINE OF COLUMN


4@100, REST @ 125 TO
CENTER LINE OF COLUMN

775
775
5680

7290
NOTES: 1. NO FOOTING SHOULD REST ON BACKFILLED MATERIALS.
3080

2. IN CASE THE SOIL CONDITION AT THE FOUNDATION LEVEL OF THE FOOTING CAN'T BE ASCERTAINED, THE CONSTRUCTOR
MUST CONSULT A SOIL EXPERT OR A GEOTECHNICAL ENGINEER AND EXPLORE THE SUBSURFACE CONDITION.
3. FOUNDATION LEVEL OF FOOTINGS LOCATED AT THE CISTERN AREA AFTER APPROVAL BY THE STRUCTURAL ENGINEER,
MAY BE ADJUSTED TO ACCOMMODATE THE DEPTH REQUIREMENTS OF THE CISTERN.

NGL
NGL

FTB
FTB
1 LEVEL C1

250

1650
1650
W/ 10MM LATERAL TIES

2000
W/ 10MM LATERAL TIES

2000
1 SET 1 SET
GROUND

450
FLOOR TO
4@100, REST @ 125 TO 4@100, REST @ 125 TO
CENTER LINE OF COLUMN ROOF
8230 CENTER LINE OF COLUMN

350
350
CENTER LINE OF COLUMN
BARS, B.W
2"thk GRAVEL BED
2"thk GRAVEL BED
1 REINFORCEMENT

C1F1 C1F2 MARK PARALLEL TO SHORT SPAN PARALLEL TO LONG SPAN REMARKS

TOP BARS BOTTOM BARS TOP BARS BOTTOM BARS


@ SUPPORT @ MIDSPAN @ SUPPORT @ MIDSPAN

A B C D
A B C D 8330
8330 2865 5465
2865 5465 1490 1375 2653 2815
1490 1375 2653 2815
2400 2
2

2600
2600

5680
5680

7000
3080
1000 1000 1000 1000 1000 1000 1000
3080

1200
900

300
TR-1

2 3

PROPOSED THREE
STOREY BUILDING Mr. Jose Corono Evangelista
S-1
S-1
Mrs. Teresita De Luna Evangelista
blk3 lot 7&8 Abba compound, Palatiw, Pasig City