Check the appropriate box. If "FAIL" is checked, make a comment describing the issue, remedy and record the repair time in the Field Maintenance Logbook. Lock
out / Tag out procedures MUST be performed.
Refer to 360°
for picture #s
Action PASS FAIL Reference
Verify all PPE is available, JSA is complete, and lock out / tag Obtain PPE and documentation as
1
out procedures are followed prior to all repairs (if necessary)
necessary
Check overall condition and cleanliness of the shaker (skid, Perform general cleaning and
2
basket, springs, etc..)
maintenance
Check that all protections and guards are in place and
3 3, 4, 6
functional (motor caps, spring sleeves, etc.)
Repair or replace as necessary
Check for missing or loose hardware (bolts, covers, gaskets,
4
etc.)
Replace as necessary
Check motor bearing temperatures while processing mud If surface temperature exceeds 90°C
5 6
(all motors). Record in Field Maintenance Log
(194 °F), contact shop
Check that the control panels and junction boxes are closed
6 5
with all bolts/screws properly fastened
Replace missing bolts/screws
Check for damage on all buttons and switches and verify
7 5
that they are working properly.
Repair or replace as necessary
Visually check all cables and cable glands for tightness,
8 1, 2, 6
sheath wear, and cuts.
Repair or replace as necessary
Record the shaker total operating hours in the Field
9
Maintenance Log
10 9, 10 Check feeder for cracks or leaks Repair or replace as necessary
Check all mud hoses, pipes and valves for cracks, leaks, and
11
functionality.
Repair or replace as necessary
09-May-2012
9067002 Rev –
STEM 2
MONTHLY MONGOOSE PT/MONGOOSE PRO/MEERKAT ELECTRIC FIELD MAINTENANCE CHECKLIST
Check the appropriate box. If "FAIL" is checked, make a comment describing the issue, remedy and record the repair time in the Field Maintenance Logbook. Lock out /
Tag out procedures MUST be performed.
Refer to 360°
for picture #s
Action PASS FAIL Reference
5 3 Lubricate deck adjustment jacks with multi-purpose grease approximately 10 shots per jack
Check deck adjustment jacks functionality for travel through no more than 2 degree change from side to
6 1, 3
deck adjustment range.
side at any given time
7 Remove screens from screen bed
Inspect the screen bed p-seal gaskets, p-seal retainer bars,
8 1, 7 and the screen bed construction for wear, tear, loose or Replace as needed
missing bolts, and grommets.
Inspect the half pipe on the interior and exterior for Repair or repaint as needed. For structural
9 9
excessive wear, cracks, or missing paint.
cracks contact the shop
Inspect the drip lip at the discharge of the basket. Ensure all Contact shop if the drip lip has been modified
10 1, 7
bolts are present and properly torqued.
or replaced. Bolt torque = 68 N-m (50 ft-lbs)
Open all control panels and junction boxes, clean Repair/replace as necessary, ensure silica bag
debris/corrosion, inspect and tighten all terminals inside, does not contact terminals and that o-ring is
11 5, 6 replace silica bags, clean door and box flame paths (mating properly seated in the groove. Apply a thin
surfaces), inspect door gaskets, inspect o-rings for cuts or coat of multi-purpose grease along the
twists, and grease all cover fastening screws flamepath and over the o-ring.
Lubricate control panel doors hinges with silicon grease or
12 5
petroleum jelly
Manually cycle all the breakers inside control panel to check
13 5
their functionality
Contact shop if damaged
60/70 frame = 434 N-m (320 ft-lbs)
14 6 Check motor bolt torque 30/35 frame = 244 N-m (180 ft-lbs)
15 3, 4 Locate and verify the presence of shipping brackets.
If all maintenance activities are completed, securely
install/close all covers, panels, boxes, guards, and screens
16 with all appropriate fasteners and proceed to next step.
Otherwise stop here and continue with maintenance
activities
Ensure proper procedures and checks are performed and re-
energize control panel, test Emergency Stop button, test
17
on/off switches, test mode switch (if applicable), and verify
Contact the shop if not working
all indicator lights are working
09-May-2012
9067002 Rev –
Notes
09-May-2012
9067002 Rev –
STEM 3
YEARLY MONGOOSE PT/MONGOOSE PRO/MEERKAT ELECTRIC FIELD MAINTENANCE CHECKLIST
Check the appropriate box. If "FAIL" is checked, make a comment describing the issue, remedy and record the repair time in the Field Maintenance Logbook. Lock
out / Tag out procedures MUST be performed.
Refer to 360°
for picture #s
Action PASS FAIL Reference
Verify all necessary PPE is available, JSA is complete, and Obtain PPE and documentation as
1
necessary lock out / tag out procedures are followed
necessary
09-May-2012
9067002 Rev –
STEM 4
2 YEAR MONGOOSE PT/MONGOOSE PRO/MEERKAT ELECTRIC FIELD MAINTENANCE CHECKLIST
Check the appropriate box. If "FAIL" is checked, make a comment describing the issue, remedy and record the repair time in the Field Maintenance Logbook. Lock
out / Tag out procedures MUST be performed.
Refer to 360°
for picture #s
Action PASS FAIL Reference
Verify all necessary PPE is available, JSA is complete, and Obtain PPE and documentation as
1
necessary lock out / tag out procedures are followed
necessary
Notes
09-May-2012
9067002 Rev –
Preventative Maintenance - 360° Rig Maintenance & Inspection STEM
6 3 4
9
8 2
1
10 7 5
09-May-2012