As appeared in January 2013 PBE Copyright CSC Publishing www.powderbulk.

com

New installation

A
pffels Fine Coffees, Santa Fe ity for small-batch and high-volume
Springs, Calif., produces a production runs. When planning the

Tubular drag
wide range of custom- facility, the company needed to install
blended regular and flavored whole- a conveying system that would effi-
bean and ground coffees and other ciently and gently move the coffee

cable coffee ingredients for food stores, pri-


vate labelers, and food-service estab-
lishments. The company imports
beans and ground coffee through the
production process without diminish-
ing product quality.
conveyors hand-picked green coffee beans and
custom-blends and roasts them to
Finding better conveyors
help
make the whole-bean and ground cof-
fee products that are packaged in 1- In the past, the company used bucket
ounce to 5-pound valve bags for elevators, augers, and pneumatic pres-

company distribution. In early 2004, the com-


pany worked with an engineering
firm to design and build a new ad-
sure conveying systems to move the
beans and ground coffee through the
blending, roasting, grinding, flavoring,
turn green vanced computer-aided roasting facil- and packaging processes. However,

coffee beans
into smooth
blends

A coffee roaster specifies


tubular drag cable
conveyors for a new facility’s
production process to
reduce operating costs and
improve production
efficiency.

The freshly roasted coffee beans discharge from the roasters into a hop-
per that directs them to the conveying system that gently moves them to
the holding silos.
Copyright CSC Publishing
these conveyors were maintenance- with Nohbell Corp., Bellevue, Wash.,
and labor-intensive and required ex- an engineering firm that specializes in
cessive production downtime to clean designing, developing, and imple-
between product runs to prevent cross- menting supply-chain operations for
contamination. “This kept our opera- coffee, wine, and food processors.
tion costs high and decreased our During the planning stage, the engi-
production efficiency,” says Darryl neering firm recommended that the
Blunk, Apffels president. “The con- company use enclosed tubular drag
veyors also broke the roasted coffee cable conveyors to move the beans
beans and declassified the coffee and ground coffee through the pro-
grounds because of the way they duction process. Based on the engi-
worked. This was a problem because neering firm’s experience in the
we want unbroken beans and a consis- coffee industry, these slow-running,
tent grind distribution at the end when dust-free conveyors would carefully
we package the final product.” convey the friable roasted beans and
ground coffee without breaking the
When the company decided to build beans or stratifying the grounds. And
the new facility, it worked closely because of how the conveyors move

The roasted beans discharge from the holding silos (right) into a convey-
ing system that moves them vertically and then horizontally above the
two grinders (bottom left).
Copyright CSC Publishing
material through the enclosed tubes, between them during conveying and
they would also reduce maintenance minimizes residue on the tube walls.
and cleaning requirements and im- To minimize downtime between
prove production efficiency and prod- product runs, a food-grade clean-out
uct quality. disc mounted on the cable keeps the
tubes clean, and a continuously oper-
ating air-knife at the outlets blows air
The company sent samples to a rec- across the discs when they pass to dis-
ommended conveyor supplier for lodge any material from them.
testing. The supplier, Cablevey Con-
veyors, Oskaloosa, Iowa, manufac-
tures custom-designed conveying The production process equipment
systems for the food processing, agri- and conveying systems are fully auto-
culture, wood, and other bulk solids mated and integrated with a central
industries. The tests proved success- controller, allowing remote control
ful, and the company’s engineers and monitoring of the entire process
worked with the supplier’s engineer- from one location. Using the con-
ing team to custom-design eight con- troller interface, an operator creates a
veying systems for the new facility. recipe for a custom-blended coffee
product and pushes the start button.
The controller then automatically
The tubular drag cable conveyors opens and closes the necessary valves
and conveying system discharges to The central controller can activate
In late 2004, the supplier’s techni- move the beans and ground coffee the conveying system’s first dis-
cians installed eight Model 4000 Se- through the production process, from charge (right) to direct the beans to
ries tubular drag cable conveyors, bag-break station to packager. the flavoring room, the second or
some of which have multiple dis- third discharge to direct them to
charges, in the company’s new roast- one of the grinders, or a fourth dis-
ing facility. Each conveyor consists of To make a custom-blended coffee charge to direct them to the pack-
two 4-inch-diameter enclosed tube product, an operator empties the spec-
sections (an infeed and a return tube) aging room conveying system.
ified bags of green coffee beans into a
with a turnaround section at one end bag-break station’s hopper. The beans
and a variable-speed 5-horsepower discharge from the hopper into a the system’s four discharges: the fla-
drive-and-sprocket assembly at the small bucket elevator that moves the voring room, one of two grinders, or
other. The turnaround section con- beans up and over to a hopper that the packaging room conveying sys-
nects the infeed and return tubes at the connects with sizing and screening tem. If the beans are directed to a
infeed end and includes an automatic equipment. This equipment removes grinder, the ground coffee discharges
cable-tensioning device. The drive- off-size beans and any foreign materi- into the fifth conveying system, which
and-sprocket assembly connects the als, such as sticks or rocks. The beans can move it to either one of four de-
tubes at the discharge end, forming a are weighed and then discharged into gassing silos or to the packaging
continuous circuit. If necessary, a the first tubular drag cable conveying room conveying system via the sys-
strategically placed mechanical cor- system, which moves them to one of tem’s two discharges. The sixth con-
ner in the conveying circuit redirects six silos. To blend the beans, the con- veying system moves the ground
material at a horizontal or vertical troller activates the appropriate silo coffee from the degassing silos to ei-
right angle. The conveyor is con- discharge valves to gravity-discharge ther the flavoring room or the packag-
structed of stainless steel, making it the correct combination of beans into ing room conveying system via the
suitable for food-grade applications. a large hopper, which discharges to system’s two discharges.
the second conveying system, which
moves the blend to one of two roasters
A continuous flexible stainless steel for roasting via the system’s two dis- The packaging room conveying sys-
cable is installed inside the enclosed charges. tem is the seventh system, and it
tubes, and solid, food-grade, ultra- moves both regular and flavored cof-
high-molecular-weight polyethylene fee beans and ground coffee to one of
(UHMW-PE) circular discs are The roasted beans discharge into the four packaging stations via the sys-
mounted on the cable at regular inter- third conveying system, which moves tem’s four discharges. The company
vals. The discs are shaped to ease ma- them to one of 12 holding silos. The uses the eighth conveying system to
terial movement and reduce controller activates the appropriate put rework back into the production
degradation. Since the discs are holding silo discharge valves to grav- process. By way of this system’s two
nearly the same diameter as the tubes, ity-discharge the beans into the fourth discharges, material can be moved to
their narrow clearance with the tube conveying system, which can move either the third conveying system that
walls ensures that the material stays the beans to one of three locations via connects to the holding silos or the
Copyright CSC Publishing
fourth conveying system that con- cause the conveyors move the beans
nects with the grinders, flavoring so gently. They’ve really helped us
room, and packaging room conveying improve and maintain the quality of
system. our whole-bean and ground-coffee
products.”
According to Guillermo Contreras,
Apffels production manager, the According the Blunk, if the company
company operates the conveying sys- expands the current production
tems at 85 percent of their maximum process or adds a new one, the sup-
100-foot-per-minute rate and can plier will be the first one he calls for
move 3,000 pounds of ground coffee conveyors. “Their conveying systems
from a grinder to the degassing silos have enabled us to consistently pro-
in about 45 minutes. Overall, the eight duce top-quality products and easily
conveying systems have a total of maintain a dust-free, sanitary opera-
1,970 feet of tubing. To ensure safety tion for more than seven years now,
during operation, if a cable is ten- which is critical from a food-safety
sioned too quickly or breaks or a turn- standpoint,” he says. “They’ve been a
around-section cover is opened, the good partner and have always been
system automatically shuts down and responsive. We definitely challenged
sounds an alarm to alert the operators. them with this installation, but there
were things we discovered during the
installation process that helped them
Improving the production process improve and enhance their conveyors,
so I think it’s been a win-win situation
Since installing the tubular drag cable for both of us.” PBE
conveyors in the new roasting facility,
the clean-out time between product
runs and the maintenance and labor
requirements have significantly de- Note: Find more information on this
creased. “The clean-out discs inside topic in articles listed under “Mechan-
the tubes take out just about every- ical conveying” in Powder and Bulk
thing, leaving little to no residue on Engineering’s Article Index in the De-
the tube walls, so it only takes about cember 2012 issue and at PBE’s web-
fifteen to twenty minutes between site, www.powderbulk.com, and in
products,” says Contreras. “We’ve books available through the website in
been using them for more than seven the PBE Bookstore. You can also pur-
years, and I haven’t had to do much to chase copies of past PBE articles at
them, other than maintain the gear www.powderbulk.com.
boxes, turn-arounds, and drives. And
if a cable or disc ever breaks, we just
have to a splice in a new cable section Cablevey Conveyors,
or mount a new disc on the cable and Oskaloosa, IA
we’re running again. It only takes 641-673-8451
about an hour, depending on where
the break occurs, and I keep plenty of www.cablevey.com
spare parts onsite. We once had to re-
place a full cable and the system was
only down for about half a day, which
is much less time than it would take to
fix the bucket elevators.”

The conveying systems have also im-


proved the company’s production ef-
ficiency and product quality. “The
conveyors maintain the grind consis-
tency as they move the ground coffee
through the process to packaging,”
says Blunk. “We’ve also seen a signif-
icant decrease in bean breakage be-

You might also like