Description Quantity Total Quantity Unit Remarks UMD TMD Unit Price Total Price

PEC Conductor
120mm2 PVC/Cu Y/G Cable 30 30.9 km 3 % Contingency added 0.04 1 -
3 % Contingency added / Via duct
Cable tray for PEC with 50mm support intervals 30 30.9 km containment - -
Allowance for Brass Tower Earth Clamp
Allowance for Braided Copper Strip @ Expansipon Joints
Earthing @ Pier
Pier with Monopile Pile Foundation 234 As per Via duct Overall Plan
70mm2 PVC/Cu-Y/G cable 31 7,254 m 0.03 218 -
Earth Plate/Termination-350mm from edge of pier cap 2 468 nos 70mm2 PVC/Cu Cable 0.2 94 -
Earth plate for viaduct structural bonding 2 468 nos -
Earth plate for stray current measurement at all pier locations 1 234 nos -
Bonding to Handrail Base Plate @ every Pier typical 2 468 nos 0.3 140 -
Earth Plate Single Hole Flush w/ Concrete with Plastic cover @ RC Pier 1 234 nos 0.2 47 -
Single Hole Cast-in Socket Clamp Flush on surface of Pier Cap 1 234 nos 0.2 47 -
110mm welding @ Rebar 6 1,404 nos 0.66 927 -
Connection to PEC by Earth Clamp-High Strength Split Bolt connector @ Every Pier 2 468 nos For bonding PEC and Copper Wire 0.33 154 -
32mm uPVC conduit for future extension 3 702 m 0.17 119 -
50mm uPVC duct 26 6,115 m 0.17 1,040 -
100mm uPVC duct 3 27 m only on double track piers 0.17 5 -
Earthing for Cable Trays and supports 1Cx6mm2 PVC ECC cable throughout Viaduct of 11.3km 10 11,300 m 3 number of trays, bonded per length 1 mtr -

Pier with Four Pile Foundation 128 As per Via duct Overall Plan -
70mm2 PVC/Cu-Y/G cable 31 3,968 m 0.03 119 -
Earth Plate/Termination-350mm from edge of pier cap 2 256 nos 70mm2 PVC/Cu Cable 0.2 51 -
Earth plate for viaduct structural bonding 2 256 nos -
Earth plate for stray current measurement at all pier locations 1 128 nos -
Bonding to Handrail Base Plate @ every Pier typical 2 256 nos 0.3 77 -
Earth Plate Single Hole Flush w/ Concrete with Plastic cover @ RC Pier 1 128 nos 0.2 26 -
Single Hole Cast-in Socket Clamp Flush on surface of Pier Cap 1 128 nos 0.2 26 -
110mm Thermowelding 8 1,024 nos 0.66 676 -
Connection to PEC by Earth Clamp-High Strength Split Bolt connector @ Every Pier 2 256 nos For bonding PEC and Copper Wire 0.33 84 -
32mm uPVC conduit for future extension 3 384 m 0.17 65 -
50mm uPVC duct 26 3,328 m 0.17 566 -
100mm uPVC duct 3 39 m only on double track piers 0.17 7 -
Tunnel Earthing 3.7 km -
500mm brackets @ average of 12m distance where the PEC is fixed 2 74 Nos as given in Linewide earthing note. 7 0.33 24 -
70mm2 PEC Cross Bonding conductor @ every 100m 17.5 648 m 0.33 214 -
Earth Bonding conductor-16mm2 @ Every 36m 17.01 629 m 0.02 13 -
32mm Dia uPVC Duct through rail plinth @ every 100m 10.09 373 m 0.2 75 -
65mm uPVC Pipe 5 185 m 0.2 37 -
High Strength Split Bolt connector 2 nos @ every 100m 2 74 Nos For bonding PEC and Copper Wire 0.33 24 -
Earthing for Cable Trays and supports 1Cx6mm2 PVC ECC cable throughout Tunnel of 3.7km 10 3,700 m 3 number of trays, bonded per length 1 mtr -
Cuts & Covers 659 m -
500mm brackets @ average of 0.5m distance where the PEC is fixed 2 1,318 Nos 0.33 435 -
70mm2 PEC Cross Bonding conductor @ every 100m 17.38 115 m 0.03 3 -
Earth Bonding conductor-16mm2 @ Every 36m 12.4 144 m -
32mm Dia uPVC Duct through rail plinth every 100mm 12.32 81 m 0.2 16 -
Earth Plate, Single Hole Flush w/ Concrete with Plastic cover @ 36m interval 4 46 nos 0.2 9 -
Bonding to handrail / Fence-70mm2 PVC/CU Cable-50mm conduit- Indicative only subject to finalisation 5.32 22 m 0.33 7 -
110mm Thermowelding 4 17 nos 0.66 11 -
High Strength Split Bolt connector 2 nos @ every 100m 2 10 For bonding PEC and Copper Wire 0.33 3 -
Piers at the Elevated Stations - R70, R71, R72- Earthing - Pier No : C03, C06 3 -
7 nos of 50mm uPVC sleeve for electrical earthing embedded in piers 375.2 1125.6 m - -
4 nos of 50mm uPVC sleeve for clean earthing embedded in piers 214.4 643.2 m -
Piers at the Elevated Stations - R70, R71, R72- Lightning Protection - Pier No : C01, C02,C04, C05,C07 to C13 3 -
2 nos of 50mm uPVC sleeve for lightning protection embedded in piers 215.6 646.8 m - -
PVC test Clamp box of size 195x150x75mm with covers 22 66 nos -

5,360 -
Description Quantity Unit Remarks UMD TMD Unit Price Total Price
Earthing
Earth Grid 150 Sq.mm Hard drawn Bare Copper (24x24M) 193 M Grid Spacing 8M - -
Exo-thermic welding 32 No 0.66 21 -
Earth Pit- For Transformer -Earth Rod 17.2mm thick and 3x1.2mm Long Cu Rod Minimum 2 No 0.66 1 75 150
Clean Earth Pit-AC- 16mm thick and 2x1.5mm Long Cu pipe electrode 2 No 0.66 1 75 150
Clean Earth Pit-DC-16mm thick and 2x1.5mm Long Cu pipe electrode 2 No 0.66 1 75 150
GI Strip-Cable Clamp 6 No 0.2 1 -
GI Strip-Rod Clamp 6 No 0.2 1 -

Connected to every 10th


Galvanised Steel Plate (3.5x30mm) 3 No reinforcement bar to be clarified 0.2 1 -
Clean Earth bar-AC--50x6mm- 6 way 1 No 0.2 0 500 500
Clean Earth bar-DC--50x6mm- 6 way 1 No 0.2 0 500 500
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 52 No 0.2 10 500 26,000
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No 0.2 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 2 No 0.2 0 -
Copper clad 48 No 0.75 36 -
Coupler 42 No 0.14 6 6 252
Driving Stud 6 No 0.14 1 11 66
Spike 6 No 0.14 1 11 66
Test Link 6 No 0.66 4 -
Boring 6 No 0.33 2 -
Welding No 0.33 - -

Bonding Cables
1x25mm2 Cu/LSFOH-Y/G Cable 260 M 0.02 5 16.4 4,264
1x50mm2 Cu/LSFOH-Y/G Cable 1,379 M 0.03 41 28.08 38,713
1x70mm2 Cu/LSFOH-Y/G Cable 259 M 0.04 10 38.74 10,034
1x120mm2 Cu/LSFOH-Y/G Cable 881 M 0.04 35 60.06 52,883
1x240mm2 Cu/LSFOH-Y/G Cable 143 M 0.05 7 133.78 19,131
Cable Tray
100mm cable Tray 115 M 0.17 20 17.59 2,028
150mm cable tray 169 M 0.2 34 21.53 3,635
300mm Cable Tray 42 M 0.2 8 33.41 1,388
600mm Earth Cable Tray 28 M 0.33 9 76.21 2,127
75mm uPVc Duct in Floor Slab 164 M 0.2 33 -
75mm uPVc Duct 333 M 0.2 67 -
358 162,037
1.Generator Earthing on Hold.Conductor size and number of earth pits shall be developed in next design stage

Lightning Protection
Description Quantity unit Remarks UMD TMD Unit Price Total Price
LP-Concrete pits with 1200mm Solid Copper Rod 12 No. 0.66 7.92 75 900
500 Air terminal rod c/w muiltiple point & Air rod base. 10 No. 2 20.00 -
Down conductor 12 No. - -
25x3 Copper Tape (PVC Covered) 651 M - 25 16,268
70mm2 Pvc insulated copper cable 197 M 0.13 25.64 17.3 3,412
Bond to conductor 5 No. 0.33 1.65 -
Copper tape to rebar bond -U bold rod clamp 12 No. 0.2 2.40 36 432
Square Tape Clamp 18 No. 0.2 3.60 18 324
Metallic DC Clips-Class H insulation at every 500mm interval 1,301 No. CA-020-Fu 0.14 182.20 6.5 8,459
32mm conduit 848 M 0.14 118.71 -
Clamp with prewelded tail 24 No. 0.17 4.08 -
Cu tape to Cable Clamp 24 No. 0.2 4.80 -
Rod to Cable Clamp 24 No. 0.2 4.80 -
U Bolt Rod Clamp 24 No. 0.2 4.80 36 864
Solid Copper Rod or Copper Cladded steel rod 180 No. 0.2 36.00 195 35,100
Coupler 168 No. 0.75 126.00 6 1,008
Driving Stud 12 No. 0.14 1.68 11 132
Spike 12 No. 0.14 1.68 11 132
Test Link 12 No. 0.14 1.68 -
Boring 12 No. 0.66 7.92 -
Welding No. 0.33 - -
0.33 - -
555.55 67,030.16
Description Quantity Unit Remarks UMD TMD Unit Price Total Price
Earthing
Earth Grid 150 Sq.mm Hard drawn Bare Copper (24x24M) 310 M 8 Meter Spacing / below 600mm -
Exo-thermic welding 65 No. 0.66 42.90 -
Earth Pit-Transfomer 2 No. 0.66 1.32 75 150
Clean Earth Pit-AC-16mm-3 nos-1.5m Long copper electrodes 6 No. 0.66 3.96 75 450
Clean Earth Pit-DC-16mm-3 nos-1.5m Long copper electrodes 6 No. 0.66 3.96 75 450
GI Strip-Cable Clamp 4 No. 0.66 2.64 0 -
2 No.
Connected t o every 10th reinforcement bar to
Galvanised Steel Strip (3.5x3.0mm) be clarified 0.2 0.40 0 -
GI Strip-Rod Clamp 4 No. 0.2 0.80 0 -
Clean Earth bar-AC--50x6mm- 6 way 2 No. 0.2 0.40 500 1,000
Clean Earth bar-DC--50x6mm- 6 way 2 No. 0.2 0.40 500 1,000
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 46 No. 0.2 9.20 500 23,000
EEB-2-Earth Bar-Type-2- 50x6mm - 10-way 1 No. 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-21 way 1 No. 0.2 0.20 0 -
Copper clad 112 No. 0.2 22.40 0 -
Coupler 98 No. 0.75 73.50 6 588
Driving Stud 14 No. 0.14 1.96 11 154
Spike 14 No. 0.14 1.96 11 154
Test Link 14 No. 0.14 1.96 0 -
Boring 14 No. 0.66 9.24 0 -
Welding No. 0.33 - 0 -
Bonding Cables
1x25mm2 Cu/LSFOH-Y/G Cable 260 M 0.33 85.80 16.4 4,264
1x50mm2 Cu/LSFOH-Y/G Cable 1,379 M 0.02 27.57 28.08 38,713
1x70mm2 Cu/LSFOH-Y/G Cable 259 M 0.03 7.77 38.74 10,034
1x120mm2 Cu/LSFOH-Y/G Cable 881 M 0.04 35.22 60.06 52,883
1x240mm2 Cu/LSFOH-Y/G Cable 143 M 0.05 7.15 133.78 19,131
Cable Tray
100mm cable Tray 115 M 0.17 19.60 17.59 2,028
150mm cable tray 190 M 0.33 62.65 21.53 4,087
600mm Earth Cable Tray 49 M 0.2 9.78 76.21 3,727
75mm uPVc Duct in Floor Slab 164 M - - -
75mm uPVc Duct 333 M - - -
432.95 161,813.48
Lightning Protection
Description Quantity unit Remarks UMD TMD Unit Price Total Price
LP-Concrete pits with 1200mm Solid Copper Rod 16 No. 0.66 11 75 1,200
15x500 Air terminal rod c/w muiltiple point & Air rod base. 12 No. 2 24 0 -
Down conductor 16 No. - 0 -
25x3 Copper Tape (PVC Covered) 494 M - 25 12,358
70mm2 Pvc insulated copper cable 478 M 0.13 62 17.3 8,268
Copper tape to rebar bond -U bold rod clamp 16 No. 0.2 3 36 576
Square Tape Clamp 10 No. 0.2 2 18.00 180
Metallic DC Clips-Class H insulation at every 500mm interval 989 No. 0.14 138 6.5 6,426
32mm conduit 972 M 0.14 136 0 -
Clamp with prewelded tail 32 No. 0.17 5 0 -
Cu tape to Cable Clamp 32 No. 0.2 6 0 -
Rod to Cable Clamp 32 No. 0.2 6 0 -
U Bolt Rod Clamp 32 No. 0.2 6 36 1,152
Solid Copper Rod or Copper Cladded steel rod 240 No. 0.2 48 195 46,800
Coupler 224 No. 0.75 168 6 1,344
Driving Stud 16 No. 0.14 2 11 176
Spike 16 No. 0.14 2 11 176
Test Link 16 No. 0.14 2 0 -
Boring 16 No. 0.66 11 0 -
Welding No. 0.33 - 0 -
634.32 78,655.07
1.Generator Earthing on Hold.Conductor size and number of earth pits shall be developed in next design stage
Description Quantity Unit Remarks
Earthing UMD TMD Unit Price Total Price
Earth Grid 120Sq.mm Harc drawn Bare Cu. Conductor (68x18mm) 398 mtr Below 1000mm Ground level - 0 -
Exo-thermic welding 36 No. 0.66 23.76 0 -
Earth Pit-Transformer 2 No. 0.66 1.32 75 150
Clean Earth Pit-AC 3 No. 0.66 1.98 75 225
Clean Earth Pit-DC 3 No. 0.66 1.98 75 225

Galvanised Steel Strip (3.5x30mm) 2 No. 0.2 0.40 0 -


To be clarified
GI Strip-Cable Clamp No. 0.2 - 0 -
GI Strip-Rod Clamp No. 0.2 - 0 -
Clean Earth bar-AC 1 No. 0.2 0.20 500 500
Clean Earth bar-DC 1 No. 0.2 0.20 500 500
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 20 No. 0.2 4.00 500 10,000
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No. 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 1 No. 0.2 0.20 0 -
Copper clad 64 No. 0.75 48.00 0 -
Coupler 56 No. 0.14 7.84 6 336
Driving Stud 8 No. 0.14 1.12 11 88
Spike 8 No. 0.14 1.12 11 88
Test Link 8 No. 0.66 5.28 0 -
Boring 8 No. 0.33 2.64 0 -
Welding No. 0.33 - 0 -
Bonding Cables -
1X240mm2 CU/LSFOH CABLE 109 mtr 0.03 3.27 133.78 14,573
1X120mm2 CU/LSFOH CABLE 565 mtr 0.02 11.30 60.06 33,938
1X70mm2 CU/LSFOH CABLE 192 mtr 0.03 5.76 38.74 7,438
1CX50mm2 CU/LSFOH CABLE 1,894 mtr 0.04 75.75 28.08 53,175
1X25mm2 CU/LSFOH CABLE 1,055 mtr 0.03 31.66 16.4 17,306
Via duct PEC 1C x120sq.mm LSFOH cable 160 mtr 0.02 3.20 60.06 9,610
600mm Earthing cable tray 54 mtr 0.03 1.62 76.21 4,123
uPVC Duct 3,761 mtr Size not mentioned 0.04 150.43 -

383.23 152,273.77

Lightning Protection
Bonding at roof struture with copper tape 24 No. 0.33 7.92 -
25x3mm Copper Tape 304 M 0.13 39.52 25 7,600
Square tape clamp 16 No. 0.2 3.20 18 288
DC Clip 693 No. 0.14 96.96 6.5 4,502
uPVC Duct for Copper Tape 304 No. Size not mentioned 0.17 51.68 -
Steel Boss (furse cat. No EB001)Mild steel with Bimetallic and Spring washer 32 No. - -
1Cx70mm2 LSFOH cable 583 M 0.13 75.78 17.3 10,084
50mm dia uPVC Sleeve 583 M - -
LP-Lightning Pits 32 No. 0.66 21.12 75 2,400
Clamp with prewelded tail 64 No. 0.2 12.80 0 -
Cu tape to Cable Clamp 64 No. 0.2 12.80 0 -
Rod to Cable Clamp 64 No. 0.2 12.80 0 -
U Bolt Rod Clamp 64 No. 0.2 12.80 36 2,304
Solid Copper Rod or Copper Cladded steel rod 480 No. 0.75 360.00 195 93,600
Coupler 448 No. 0.14 62.72 6 2,688
Driving Stud 32 No. 0.14 4.48 11 352
Spike 32 No. 0.14 4.48 11 352
Test Link 32 No. 0.66 21.12 0 -
Boring 32 No. 0.33 10.56 0 -
Welding 32 No. 0.33 10.56 0 -

Note : Generator earthing is not given as the same shall be developed in the next DCP stage
Description Quantity Unit Remarks
Earthing UMD TMD Unit Price Total Price
Earth Grid 120Sq.mm Harc drawn Bare Cu. Conductor (33x18M) 204 mtr Below 1000mm Ground level - 0 -
Exo-thermic welding 24 No. 0.66 15.84 0 -
Earth Pit-Transformer 2 No. 0.66 1.32 75 150
Clean Earth Pit-AC 3 No. 0.66 1.98 75 225
Clean Earth Pit-DC 3 No. 0.66 1.98 75 225

Galvanised Steel Strip (3.5x30mm) 2 No. 0.2 0.40 0 -


To be clarified
GI Strip-Cable Clamp No. 0.2 - 0 -
GI Strip-Rod Clamp No. 0.2 - 0 -
Clean Earth bar-AC 1 No. 0.2 0.20 500 500
Clean Earth bar-DC 1 No. 0.2 0.20 500 500
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 20 No. 0.2 4.00 500 10,000
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No. 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 1 No. 0.2 0.20 0 -
Copper clad 64 No. 0.75 48.00 0 -
Coupler 56 No. 0.14 7.84 6 336
Driving Stud 8 No. 0.14 1.12 11 88
Spike 8 No. 0.14 1.12 11 88
Test Link 8 No. 0.66 5.28 0 -
Boring 8 No. 0.33 2.64 0 -
Welding No. 0.33 - 0 -
Bonding Cables -
1X240mm2 CU/LSFOH CABLE 109 mtr 0.03 3.27 133.78 14,573
1X120mm2 CU/LSFOH CABLE 565 mtr 0.02 11.30 60.06 33,938
1X70mm2 CU/LSFOH CABLE 192 mtr 0.03 5.76 38.74 7,438
1CX50mm2 CU/LSFOH CABLE 1,894 mtr 0.04 75.75 28.08 53,175
1X25mm2 CU/LSFOH CABLE 1,055 mtr 0.03 31.66 16.4 17,306
Via duct PEC 1C x120sq.mm LSFOH cable 160 mtr 0.02 3.20 60.06 9,610
600mm Earthing cable tray 54 mtr 0.03 1.62 76.21 4,123
uPVC Duct 3,761 mtr Size not mentioned 0.04 150.43 0 -

375.31 152,273.77
Lightning Protection
Bonding at roof struture with copper tape 24 No. 0.33 7.92 0 -
25x3mm Copper Tape 387 M 0.13 50.25 25 9,663
Square tape clamp 32 No. 0.2 6.40 18 576
DC Clip 763 No. 0.14 106.75 6.5 4,956
uPVC Duct for Copper Tape 387 No. Size not mentioned 0.17 65.71 0 -
Steel Boss (furse cat. No EB001)Mild steel with Bimetallic and Spring washer 40 No. - 0 -
1Cx70mm2 LSFOH cable 376 M 0.13 48.88 17.3 6,505
50mm dia uPVC Sleeve 376 M - 0 -
LP-Lightning Pits 40 No. 0.66 26.40 75 3,000
Clamp with prewelded tail 80 No. 0.2 16.00 0 -
Cu tape to Cable Clamp 80 No. 0.2 16.00 0 -
Rod to Cable Clamp 80 No. 0.2 16.00 0 -
U Bolt Rod Clamp 80 No. 0.2 16.00 36 2,880
Solid Copper Rod or Copper Cladded steel rod 600 No. 0.75 450.00 195 117,000
Coupler 560 No. 0.14 78.40 6 3,360
Driving Stud 40 No. 0.14 5.60 11 440
Spike 40 No. 0.14 5.60 11 440
Test Link 40 No. 0.66 26.40 0 -
Boring 40 No. 0.33 13.20 0 -
Welding 40 No. 0.33 13.20 0 -

Note : Generator earthing is not given as the same shall be developed in the next DCP stage
Description Quantity Unit Remarks
Earthing UMD TMD Unit Price Total Price
Earth Grid 120Sq.mm Harc drawn Bare Cu. Conductor (33x18M) 204 mtr Below 1000mm Ground level - 0 -
Exo-thermic welding 24 No. 0.66 15.84 0 -
Earth Pit-Transformer 2 No. 0.66 1.32 75 150
Clean Earth Pit-AC 3 No. 0.66 1.98 75 225
Clean Earth Pit-DC 3 No. 0.66 1.98 75 225

Galvanised Steel Strip (3.5x30mm) 2 No. 0.2 0.40 0 -


To be clarified
GI Strip-Cable Clamp No. 0.2 - 0 -
GI Strip-Rod Clamp No. 0.2 - 0 -
Clean Earth bar-AC 1 No. 0.2 0.20 500 500
Clean Earth bar-DC 1 No. 0.2 0.20 500 500
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 20 No. 0.2 4.00 500 10,000
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No. 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 1 No. 0.2 0.20 0 -
Copper clad 64 No. 0.75 48.00 0 -
Coupler 56 No. 0.14 7.84 6 336
Driving Stud 8 No. 0.14 1.12 11 88
Spike 8 No. 0.14 1.12 11 88
Test Link 8 No. 0.66 5.28 0 -
Boring 8 No. 0.33 2.64 0 -
Welding No. 0.33 - 0 -
Bonding Cables
1X240mm2 CU/LSFOH CABLE 109 mtr 0.03 3.27 133.78 14,573
1X120mm2 CU/LSFOH CABLE 565 mtr 0.02 11.30 60.06 33,938
1X70mm2 CU/LSFOH CABLE 192 mtr 0.03 5.76 38.74 7,438
1CX50mm2 CU/LSFOH CABLE 1,894 mtr 0.04 75.75 28.08 53,175
1X25mm2 CU/LSFOH CABLE 1,055 mtr 0.03 31.66 16.4 17,306
Via duct PEC 1C x120sq.mm LSFOH cable 160 mtr 0.02 3.20 60.06 9,610
600mm Earthing cable tray 54 mtr 0.03 1.62 76.21 4,123
uPVC Duct 3,761 mtr Size not mentioned 0.04 150.43 0 -

375.31 152,273.77
Lightning Protection
Bonding at roof struture with copper tape 24 No. 0.33 7.92 0 -
25x3mm Copper Tape 328 M 0.13 42.58 25 8,188
Square tape clamp 32 No. 0.2 6.40 18 576
DC Clip 704 No. 0.14 98.49 6.5 4,573
uPVC Duct for Copper Tape 328 No. Size not mentioned 0.17 55.68 0 -
Steel Boss (furse cat. No EB001)Mild steel with Bimetallic and Spring washer 40 No. - 0 -
1Cx70mm2 LSFOH cable 376 M 0.13 48.88 17.3 6,505
50mm dia uPVC Sleeve 376 M - 0 -
LP-Lightning Pits 40 No. 0.66 26.40 75 3,000
Clamp with prewelded tail 80 No. 0.2 16.00 0 -
Cu tape to Cable Clamp 80 No. 0.2 16.00 0 -
Rod to Cable Clamp 80 No. 0.2 16.00 0 -
U Bolt Rod Clamp 80 No. 0.2 16.00 36 2,880
Solid Copper Rod or Copper Cladded steel rod 600 No. 0.75 450.00 195 117,000
Coupler 560 No. 0.14 78.40 6 3,360
Driving Stud 40 No. 0.14 5.60 11 440
Spike 40 No. 0.14 5.60 11 440
Test Link 40 No. 0.66 26.40 0 -
Boring 40 No. 0.33 13.20 0 -
Welding 40 No. 0.33 13.20 0 -

Note : Generator earthing is not given as the same shall be developed in the next DCP stage
Description Quantity Unit Remarks
Earthing UMD TMD Unit Price Total Price
Earth Grid 120Sq.mm Harc drawn Bare Cu. Conductor (15x15mm) 121 mtr Below 1000mm Ground level - 0 -
Exo-thermic welding 20 No. 0.66 13.20 0 -
Earth Pit-Transformer 2 No. 0.66 1.32 75 150
Clean Earth Pit-AC 3 No. 0.66 1.98 75 225
Clean Earth Pit-DC 3 No. 0.66 1.98 75 225

Galvanised Steel Strip (3.5x30mm) No. 0.3 - 0 -


To be clarified
GI Strip-Cable Clamp No. 0.3 - 0 -
GI Strip-Rod Clamp No. 0.3 - 0 -
Clean Earth bar-AC 1 No. 0.2 0.20 500 500
Clean Earth bar-DC 1 No. 0.2 0.20 500 500
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 15 No. 0.2 3.00 500 7,500
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No. 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 1 No. 0.2 0.20 0 -
Copper clad 64 No. 0.75 48.00 0 -
Coupler 56 No. 0.14 7.84 6 336
Driving Stud 8 No. 0.14 1.12 11 88
Spike 8 No. 0.14 1.12 11 88
Test Link 8 No. 0.66 5.28 0 -
Boring 8 No. 0.33 2.64 0 -
Welding No. 0.33 - 0 -
Bonding Cables
1X240mm2 CU/LSFOH CABLE 210 mtr 0.03 6.30 133.78 28,094
1X120mm2 CU/LSFOH CABLE 845 mtr 0.02 16.90 60.06 50,751
1X70mm2 CU/LSFOH CABLE 328 mtr 0.03 9.84 38.74 12,707
1CX50mm2 CU/LSFOH CABLE 1,287 mtr 0.04 51.49 28.08 36,145
1X25mm2 CU/LSFOH CABLE 265 mtr 0.03 7.95 16.4 4,346
Via duct PEC 1C x120sq.mm LSFOH cable 80 mtr 0.02 1.60 60.06 4,805
uPVC Duct 2,935 mtr Size not mentioned 0.04 117.41 0 -
299.77 146,459.16

Lightning Protection
Bonding at roof struture with copper tape 25 No. 0.33 8.25 0 -
25x3mm Copper Tape M 0.13 - 25 -
Square tape clamp No. 0.2 - 18 -
DC Clip No. 0.14 - 6.5 -
uPVC Duct for Copper Tape - No. Size not mentioned 0.17 - 0 -
Steel Boss (furse cat. No EB001)Mild steel with Bimetallic and Spring washer 25 No. - 0 -
1Cx70mm2 LSFOH cable 125 M 0.13 16.25 17.3 2,163
32mm dia uPVC Sleeve 125 M - 0 -
LP-Lightning Pits 25 No. 0.66 16.50 75 1,875
Clamp with prewelded tail 50 No. 0.2 10.00 0 -
Cu tape to Cable Clamp 50 No. 0.2 10.00 0 -
Rod to Cable Clamp 50 No. 0.2 10.00 0 -
U Bolt Rod Clamp 50 No. 0.2 10.00 36 1,800
Solid Copper Rod or Copper Cladded steel rod 375 No. 0.75 281.25 195 73,125
Coupler 350 No. 0.14 49.00 6 2,100
Driving Stud 25 No. 0.14 3.50 11 275
Spike 25 No. 0.14 3.50 11 275
Test Link 25 No. 0.66 16.50 0 -
Boring 25 No. 0.33 8.25 0 -
Welding 25 No. 0.33 8.25 0 -

451.25 81,612.50
DC -Tie in Switch Room
Description QTY Unit Remarks UMD TMD Unit Price Total Price
Earthing
Earth Grid 120 Sq.mm Hard drawn Bare Copper (30x32M) 185 M Below 400mm under foundation level - 0 -
Earth Pit 2 No For Transformer Room. 0.66 1.32 75 150.00
Exo-thermic welding 19 No 0.66 12.54 0 -
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 3 No 0.2 0.60 500 1,500.00
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 1 No 0.2 0.20 0 -
GI Strip-Rod Clamp No 0.2 - 0 -
GI Strip-Re-inforcement Bar Clamp No 0.2 - 0 -
Galvanised Steel Strip (3.5x3.0mm) No 0.2 - 0 -
Copper clad 16 No 0.75 12.00 0 -
Coupler 14 No 0.14 1.96 6 84.00
Driving Stud 2 No 0.14 0.28 11 22.00
Spike 2 No 0.14 0.28 11 22.00
Test Link 2 No 0.66 1.32 0 -
Boring 2 No 0.33 0.66 0 -
Welding No 0.33 - 0 -
Bonding cables M -
1x25mm2 Cu/LSFOH-Y/G Cable 20 M 0.02 0.40 16.4 328.16
1x70mm2 Cu/LSFOH-Y/G Cable 56 M 0.03 1.68 28.08 1,572.48
1x120mm2 Cu/LSFOH-Y/G Cable 339 M 0.04 13.56 60.06 20,366.35
225mm Cable Tray 53 M Considered as additional for cables 0.2 10.58 27.47 1,453.26
150mm cable tray 36 M Considered as additional for cables 0.2 7.13 21.53 767.33

64.71 26,265.58
Lightning Protection
25x3mm Copper Tape 192 M including sown conductor 0.13 24.96 25 4,800.00
Square tape clamp 7 No. 0.2 1.40 18 126.00
DC Clip 384 No. 0.14 53.76 6.5 2,496.00
uPVC Duct for Copper Tape 192 No. 0.17 32.64 0 -
Steel Boss (furse cat. No EB001)Mild steel with Bimetallic and Spring washer 6 No. - 0 -
LP-Lightning Pits 6 No. Lightning Pits are only shown in the layout 0.66 3.96 75 450.00
Clamp with prewelded tail 12 No. Tape and accessories are assumed 0.2 2.40 0 -
Cu tape to Cable Clamp 12 No. 0.2 2.40 0 -
Rod to Cable Clamp 12 No. 0.2 2.40 0 -
U Bolt Rod Clamp 12 No. 0.2 2.40 36 432.00
Solid Copper Rod or Copper Cladded steel rod 90 No. 0.75 67.50 195 17,550.00
Coupler 84 No. 0.14 11.76 6 504.00
Driving Stud 6 No. 0.14 0.84 11 66.00
Spike 6 No. 0.14 0.84 11 66.00
Test Link 6 No. 0.66 3.96 0 -
Boring 6 No. 0.33 1.98 0 -
Welding 6 No. 0.33 1.98 0 -

215.18 26,490.00
Description Quantity Unit Remarks
Earthing UMD TMD Unit Price Total Price

Earth Grid 120 Sq.mm Hard drawn Bare Copper (41x24M) 306 M Below 400mm under foundation level - 0 -
Exo-thermic welding 38 No. 0.66 25.08 0 -
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 5 No. 0.2 1 500 2,500.00
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 No. 0.2 0.20 0 -
Earth Pit 2 No. For Transfomer 0.66 1.32 75 150.00
Copper clad 16 No. 0.75 12.00 0 -
Coupler 14 No. 0.14 1.96 6 84.00
Driving Stud 2 No. 0.14 0.28 11 22.00
Spike 2 No. 0.14 0.28 11 22.00
Test Link 2 No. 0.66 1.32 0 -
Boring 2 No. 0.33 0.66 0 -
Welding No. 0.33 - 0 -
Bonding Cables
1x25mm2 Cu/LSFOH-Y/G Cable 19 M 0.02 0.38 16.4 311.60
1x50mm2 Cu/LSFOH-Y/G Cable 35 M 0.03 1.04 28.08 968.76
1x70mm2 Cu/LSFOH-Y/G Cable 67 M 0.03 2.00 38.74 2,583.96
1x120mm2 Cu/LSFOH-Y/G Cable 646 M 0.04 25.84 60.06 38,798.76
225mm Cable Tray 71 M 0.2 14.29 27.47 1,962.49
150mm cable tray 75 M 0.2 14.99 21.53 1,613.24
102.63 49,016.81

Lightning Protection
LP-Lightning Pits 8 No 0.66 5.28 75 600.00
25x3 Copper Tape 283 M Including down conductor 0.03 8.49 25 7,077.50
DC Clip 566 No 0.14 79.27 6.5 3,680.30
Air terminal with Fixed base 4 No 2 8.00 0 -
Square Tape Clamp 6 No 0.14 0.84 18 108.00
Down conductor Drops 6 No Copper tape as shown in dwg - -
Clamp with prewelded tail 16 No 0.2 3.20 0 -
Cu tape to Cable Clamp 16 No 0.2 3.20 0 -
Rod to Cable Clamp 16 No 0.2 3.20 0 -
U Bolt Rod Clamp 16 No 0.2 3.20 36 576.00
Solid Copper Rod or Copper Cladded steel rod 120 No 0.75 90.00 195 23,400.00
Coupler 112 No 0.14 15.68 6 672.00
Driving Stud 8 No 0.14 1.12 11 88.00
Spike 8 No 0.14 1.12 11 88.00
Test Link 8 No 0.66 5.28 0 -
Boring 8 No 0.33 2.64 0 -
Welding No 0.33 - 0 -
230.52 36,289.80
Description Quantity Unit Remarks UMD TMD Unit Price Total Price
Lightning Protection
1000mm Air Rod with multiple point supported with base 4 No. 2 8 -
25x3 PVC covered copper tape 213 M 0.13 28 25 5,323
DC Clips 212.90 No. 0.14 30 6.5 1,384
Square tape clamps 10 No. 0.14 1 18 180
Exothermic welding from JC Box to Earth Ring 6 No. 0.66 4 0 -
Down conductor drops 6 No. - 0 -
Lightning Pits No. 0.66 - 75 -
Clamp with prewelded tail - No. 0.2 - 0 -
Cu tape to Cable Clamp - No. 0.2 - 0 -
Rod to Cable Clamp - No. 0.2 - 0 -
U Bolt Rod Clamp - No. 0.2 - 36 -
Solid Copper Rod or Copper Cladded steel rod - No. 0.75 - 195 -
Coupler - No. 0.14 - 6 -
Driving Stud - No. 0.14 - 11 -
Spike - No. 0.14 - 11 -
Test Link - No. 0.66 - 0 -
Boring - No. 0.33 - 0 -
Welding No. 0.33 - 0 -
71 6,886

Earthing
240mm2 hard drawn copper cable 122 m 0.2 24 -
120mm2 hard drawn copper cable 180 M 0.04 7 0 -
2 way Copper Earth bar with Single disconnecting link 2 No. 0.2 0 500 1,000
6 way Copper Earth bar with Single disconnecting link 1 No. 0.2 0 500 500
6 way Copper Earth bar with Twin disconnecting link 4 No. 0.2 1 500 2,000
8 way Copper Earth bar with Single disconnecting link 4 No. 0.2 1 -
12 way Copper Earth bar with Single disconnecting link 1 No. 0.2 0 -
12 way Copper Earth bar with Twin disconnecting link 3 No. 0.2 1 -
Exothermic welding for bonding of earth cables to the grid 12 No. 0.66 8 0 -
Exothermic welding for bonding of Earth grid 92 No. 0.66 61 0 -
Earth Pit 6 No. 0.66 4 75 450
Copper clad 48 No. 0.75 36 0 -
Coupler 42 No. 0.14 6 6 252
Driving Stud 6 No. 0.14 1 11 66
Spike 6 No. 0.14 1 11 66
Test Link 6 No. 0.66 4 0 -
Boring 6 No. 0.33 2 0 -
Welding No. 0.33 - 0 -
Bonding Cables -
since location of Earth bars are
1x25mm2 Cu/LSFOH-Y/G Cable 49 M not given cables are assumed 0.02 0.97 16.4 795
1x70mm2 Cu/LSFOH-Y/G Cable 67 M 0.03 2.00 38.74 2,584
1x120mm2 Cu/LSFOH-Y/G Cable 222 M 0.04 8.90 60.06 13,360
1x240mm2 Cu/LSFOH-Y/G Cable 154 M 0.17 26.18 133.78 20,602
Description Quantity Unit Remarks UMD TMD Unit Price Total Price
Lightning Protection
1000mm Air Rod with multiple point supported with base 3 No. 2 6 0 -
25x3 PVC covered copper tape 182 M 0.13 24 25 4,558
DC Clips 182 No. 0.14 26 6.5 1,185
Square tape clamps 10 No. 0.14 1 18 180
Exothermic welding from JC Box to Earth Ring 10 No. 0.66 7 0 -
Down conductor drops 10 No. - 0 -
Lightning Pits No. 0.66 - 75 -
Clamp with prewelded tail - No. 0.2 - 0 -
Cu tape to Cable Clamp - No. 0.2 - 0 -
Rod to Cable Clamp - No. 0.2 - 0 -
U Bolt Rod Clamp - No. 0.2 - 36 -
Solid Copper Rod or Copper Cladded steel rod - No. 0.75 - 195 -
Coupler - No. 0.14 - 6 -
Driving Stud - No. 0.14 - 11 -
Spike - No. 0.14 - 11 -
Test Link - No. 0.66 - 0 -
Boring - No. 0.33 - 0 -
Welding No. 0.33 - 0 -

Earthing
240mm2 hard drawn copper cable 130 m 0.2 26 0 -
120mm2 hard drawn copper cable 270 M 0.04 11 0 -
2 way Copper Earth bar with Single disconnecting link 2 No. 0.2 0 500 1,000
6 way Copper Earth bar with Twin disconnecting link 5 No. 0.2 1 500 2,500
8 way Copper Earth bar with Twin disconnecting link 3 No. 0.2 1 0 -
10 way Copper Earth bar with Single disconnecting link 3 No. 0.2 1 0 -
10 way Copper Earth bar with Twin disconnecting link 7 No. 0.2 1 0 -
Exothermic welding for bonding of earth cables to the grid 16 No. 0.66 11 0 -
Exothermic welding for bonding of Earth grid 64 No. 0.66 42 0 -
Earth Pit 6 No. 0.66 4 75 450
Copper clad 48 No. 0.75 36 0 -
Coupler 42 No. 0.14 6 6 252
Driving Stud 6 No. 0.14 1 11 66
Spike 6 No. 0.14 1 11 66
Test Link 6 No. 0.66 4 0 -
Boring 6 No. 0.33 2 0 -
Welding No. 0.33 - -
Bonding Cables
1x25mm2 Cu/LSFOH-Y/G Cable 51 M 0.02 1.01 16.4 830
1x120mm2 Cu/LSFOH-Y/G Cable 216 M 0.04 8.64 38.74 8,368
1x240mm2 Cu/LSFOH-Y/G Cable 252 M 0.17 42.84 133.78 33,713
Description Quantity Unit Remarks
Earthing System UMD TMD Unit Price Total Price
150mm2 Hard drawn bare Cu with 3 meter Grid Spacing (123x24M) 2,134 M 600mm below - 0 -
EEB-1-Earth Bar-Type-1-50x6mm- 6 way 32 no. 0.2 6.40 500 16,000
EEB-2-Earth Bar-Type-2- 50x6mm - 21-way 1 no. 0.2 0.20 0 -
EEB-3-Earth Bar-Type-3-50x6-10 way 1 no. 0.2 0.20 0 -
Galvanised steel plate(3.5x3mm ) connection with re-inforcement no. 0.2 - 0 -
GI Strip to Cable Clamp no. 0.2 - 0 -
GI Strip to Rod Clamp no. 0.2 - 0 -
AC Clean Earth Pit-16mm -1.5 Long Copper Electrode 2 no. 0.66 1.32 75 150
DC Clean Earth Pit-16mm -1.5 Long Copper Electrode 2 no. 0.66 1.32 75 150
Earth Pit-Transformer -17.2mm-3 x 1.2 Meter Long Cu Earth Rod 2 no. 0.66 1.32 75 150
Exothermic welds 400 no. 0.66 264.00 0 -
Copper clad 48 no. 0.75 36.00 0 -
Coupler 42 no. 0.14 5.88 6 252
Driving Stud 6 no. 0.14 0.84 11 66
Spike 6 no. 0.14 0.84 11 66
Test Link 6 no. 0.66 3.96 0 -
Boring 6 no. 0.33 1.98 0 -
Welding no. 0.33 - -

Bonding Cables
1x25mm2 Cu/LSFOH/ Y/G 840 M 0.03 25.21 16.4 13,783
1x50mm2 Cu/LSFOH/ Y/G 1,563 M 0.03 46.90 28.08 43,897
1x70mm2 Cu/LSFOH/ Y/G 209 M 0.03 6.26 38.74 8,081
1x240mm2 Cu/LSFOH/ Y/G 147 M 0.05 7.33 133.78 19,617
Bonding to PEC 30m considered-2
1x120mm2 Cu/LSFOH/ Y/G 876 M nos 0.04 35.05 60.06 52,620
75mm uPVC duct 54 M 0.2 10.80 - -
100mm Power Cable Tray 29 M 0.2 5.73 17.59 504
300mm tray 506 M 0.2 101.14 33.41 16,894
600mm Cable tray 89 M 0.33 29.53 76.21 6,819
Lightning Protection
DC-Down Conductor 10 no. - 0
70mm2 PVC insulated cable 436 M 0.03 13.08 17.3 7,543
32mm uPVC Conduit for Earth Cables 436 M 0.17 74.12 0 -
Steel Roof Canopy bonding to re-bar 10 no. 0.33 3.30 -
Rod to cable Clamp 10 no. 0.2 2.00 0 -
U Bolt Rod Clamp 10 no. 0.2 2.00 36 360
Test Link 10 no. 0.14 1.40 0 -
Concrete Inspection Pits with 1200mm solid copper rod 4 No. 0.66 2.64 75 300
Clamp with prewelded tail 8 No. 0.17 1.36 0 -
Cu tape to Cable Clamp 8 No. 0.2 1.60 0 -
Rod to Cable Clamp 8 No. 0.2 1.60 0 -
U Bolt Rod Clamp 8 No. 0.2 1.60 36 288
Solid Copper Rod or Copper Cladded steel rod 60 No. 0.2 12.00 195 11,700
Coupler 56 No. 0.75 42.00 6 336
Driving Stud 4 No. 0.14 0.56 11 44
Spike 4 No. 0.14 0.56 11 44
Test Link 4 No. 0.14 0.56 0 -
Boring 4 No. 0.66 2.64 0 -
Welding No. 0.33 - 0 -
Description STWPS NSWPS Quantity Unit Remarks UMD TMD Unit Price Total Price
50x6 way EEB-1 3 3 6 No. 6W-2D Earthbar 0.2 1.20 500 3,000
25mm2 Cu.PVC-Y/G Cable - 15 15 M 0.02 0.30 16.4 249
Bonding to PEC 20m
70mm2 Cu.PVC-Y/G Cable 25 14 159 M considered- 12 nos 0.03 4.78 38.74 6,177
High strength bolt
70mm2 Bonding clamp to PEC 6 6 12 No. connector 0.33 3.96 -