Professional Documents
Culture Documents
alexandre.kral@s2m.fr
SUMMARY
• Created in : 1907
• Collaborators : 46,775 people
• SKF worldwide : present in more than 130 countries
• Distributors network : 15,000 distributors
• Certifications : ISO 14001 & OHSAS 18001
1) SKF Magnetic Mechatronics (S2M)
Vernon Yokohama :
sales & service
Calgary
Pinghu :
workshop
Dubai :
sales & service
SUMMARY
S S
N N
Dr d Da
Axial Bearing
0.6 0.3
0.6 0.3
0.15 0.6
0.15
2. S2M TECHNOLOGY - CONTROL UNIT
Power Amplifiers
Power Supply
Control
Monitoring
2. S2M TECHNOLOGY - Cabinet overview (E300 V2)
Turbo-compressor
7-9 axes
2. S2M TECHNOLOGY - Cabling
2. S2M TECHNOLOGY - Communication
On Site Remotely
SKF remote
assistance
Server with
MBScope
• Reduce costs
Maintenance functions:
Calibration tools
• self centring
• sensibility tuning
• Transfer functions
SKF S2M
SKF S2M Upstream SKF S2M
“Robust” Gas Canned
Magnetic Bearing Magnetic Bearing Magnetic Bearing
(pH>3) (pH>3)
(pH>3)
Zone excluded
Up to 700m
Instrumentations
Pressure
Temperature
Vibrations Instrumentations
Temperature
Oil pollution Speed Installation
Sensors online
Speed sensor
Vibration
monitoring Monitoring
Manuel
monitoring
Monitoring
online
monitoring
Active magnetic bearings advantages
Magnetic bearing
Contact free and Oil free
• No friction, No wear
• No lubricant, no lube oil system
Alarm • High peripheral speed
Maintenance • Environmental friendly
system • Energy efficient (lower operating costs)
Cabinet
Very long
schedule
Less Auxiliaries:
• Smaller footprint
Easier to transport
Up to 700m Gain of space
• Less monitoring equipment
Instrumentations • Practically no maintenance
llation online • Increased Availability
monitoring
Monitoring
Monitoring
• Bearing loads and process loads
• Rotor displacement
• Safety shutdowns
• Built-in condition monitoring
TurboExpander
Compare Oil bearings to Active magnetic bearings
Turboexpander on Oil bearing Turboexpander on Magnetic bearing
Taille Frame 3 : Taille Frame 3 : GAIN
Poids: ≈12T Poids: ≈7,5T
Place:
4,5T
place:
6,5m²
3m 2,4m 2,4m
3m 20m3
7,4m 4,6m
Energy
Energy consumption:
Oil-bearing (motor pump): 30KW-50KW Cabinet: 3KW-5KW Divide by 10
Monitoring
Manuel and online monitoring: Online monitoring only:
Oil Bearing (≥ 9 sensors): AMB: 9 internal signals
More pertinent
Oil skid: (≥ 8 sensors): Controller: 5 courant signals (Force image) Signals (force).
Cooling system(≥ 2 sensor): Less Information
No force image to trait and store
Environment
Seal technology:
Labyrinth: Buffer gas Flared or recycled Buffer gas Re-injected No flare,
Oil recycling and transportation Extra costs Less risk
Risk of pollution & fire
3. a) Turbo-Expander
Speed
Alliance
JUPC
Al Jubail
QAPCO
Total
N’Kossa
Dow Chemical Agip KCO
Freeport Kashagan
Shell
shearwater
South BP
Sonatrach Pars 6,7,8 Shah Deniz
In Salah Dolphin
RASGAS
STATOIL
Sleipner T STATOIL STATOIL
STATOIL GASCO Kollsness
Troll Kollsnes
Karstoe Port Said
Power
3. a) Turbo-Expander
Process Units
Mafi-Trench / Port Saïd – 9.5MW @ 9.250 rpm Cryostar / Dolphin (Qatar) – 6,6 MW at 12 800 rpm Turbokholod – 1,7 MW to 4MW at 18 000 rpm
(> 30 expanders for Gazprom)
Compressor and HS motor
3. b) Compressor trains:
COMPRESSORS HS MOTORS
(2013)
211 161
ICL
REPH
GE 12MW ICL natural Integrated compressor Siemens 3MW PV52 / REPH 6.3MW with Siemens HS Drive
Polyethylene
Compare Compressor trains
3.c) Energy applications
COMPRESSORS 228
MOTORS 189
TURBOEXPANDERS 547
Others 92
Unparalleled Experience
EPCs
More then 1000 machines Oil & Gas equipped with SKF magnetic bearings
351 units
EX - USSR
271 units
149 units Europe
N. America
95 units
Asia & Pacific
16 units 33 units
N. America Africa
134 units
Middle East
• Unparalleled experience
4)Marking projects
41 Turbo-expanders
with SKF S2M AMB
in Qatar
4)Marking projects Russia, Ukraine, Central Asia.
220 machines
supplied by S2M in
less than 10 years
Marking projects: Off-shore (platform)
1 turbo-
2 turbo-expanders
2 turbo-expanders expanders
1 motor +
1 Compressor
2 turbo-expanders 1 turbo-expanders
Marking projects: Off-shore (platform)
8 turbo-expanders
1 turbo-expanders 8 turbo-expanders
Prelude
4)Marking on-going projects
SUBSEA applications:
Ormen Lange pilot finalisation Asgard Project
(commissioning planed in 2015)
120 km
-1100 m