Substation
Learning Objectives Equipment and
Distribution Lines
After studying this unit, you should be able to:
49
Operation and
Maintenance 5.1 INTRODUCTION
In Unit 4, you have studied about the power distribution system and its
components. You have also learnt about distribution system planning and
the general O & M objectives and practices. You will agree that the smooth
operation of the power distribution system depends on how well it is
maintained. This includes the operation and maintenance of all its
components.
The design of the substation equipment must comply with the requirement of
50 relevant Indian Standards.
Substation
We now briefly describe each one of these. Equipment and
Distribution
• Structures
Lines
Structures are required to provide entry from the overhead line to the
substation and to extend out required number of feeders. The numbers of
structures should be kept to a minimum as large number of structures
would not only be uneconomical but give an ugly look to the substation and
may prove to be obstructions in extending bus-bar, lines, etc. The main
structures required for 33/11 kV substations are:
− incoming and outgoing gantries;
− support structures for breaker, isolators, fuses, insulators, CTs
and PTs; and
− bus-bars.
• Power Transformers
You have learnt about the underlying principle and design of a power
transformer in Unit 4. The general operation and maintenance practices of
power transformers are similar to those of distribution transformers, which
are discussed in detail in Unit 6.
• Bus-bars
A bus-bar in electrical power distribution refers to thick strips of copper or
aluminum that conduct electricity within the substation (Fig. 5.1). The size
of the bus-bar is important in determining the maximum amount of current
that can be safely carried. The bus-bar should be able to carry the
expected maximum load current without exceeding the temperature limit.
The capacity of bus should also be checked for maximum temperature
under short circuit conditions.
Different types of bus-bars, namely, single bus-bar, single bus-bar with
bus sectionalizer, main and transfer bus, double bus-bar, double bus-bar
with double breaker scheme and mesh scheme are used in a substation
in accordance with the safety and reliability considerations.
Fig. 5.1: Bus-bars
• Circuit Breakers
A circuit breaker is a switching device built ruggedly to enable it to
interrupt/ make not only the load current but also the much larger
fault current, which may occur on a circuit.
A circuit breaker contains both fixed contacts and moving contacts. The
purpose of circuit breakers is to eliminate a short-circuit that occurs on a
line. Circuit breakers are found at the arrivals and departures of all lines
incident on a substation. When the circuit breaker is closed these
contacts are held together. The mode of action of all circuit breakers
consists in the breaking of the fault current by the separation of the moving
contacts away from the fixed ones. An arc is immediately established on 51
Operation and
Maintenance
separation of the contacts. Interruption of the current occurs after the arc
at these contacts is extinguished and current becomes zero.
(a) (b)
Fig. 5.2: Circuit Breakers: a) Oil Break Type Breaker; and b) SF6 Gas Breaker
The rated voltage of circuit breakers for 33 kV level is 36 kV, and for 11 kV,
it is 12 kV. The short circuit current rating is 25 kA. The 11 kV switchgear
52 is generally metal enclosed indoor type.
Substation
• Isolators Equipment and
Distribution
Isolators are mechanical switching devices capable of opening or closing
Lines
a circuit
− when a negligible current is broken or made, or
− only a small charging current is to be interrupted, or
− when no significant voltage difference exists across the
terminals of each pole.
• Control Panels
These instrument transformers are used for supplying the voltage NOTE
circuit of indicating instruments, integrating meters, other measuring
apparatus and protective relays or trip coils. These may be of single Voltage transformer
phase or three phase design and of the dry or oil immersed types. A is an instrument
voltage transformer or PT is rated in terms of the maximum burden transformer in which
(VA output) it will deliver without exceeding specified limits of error. On the secondary
voltage is
the other hand, a power transformer is rated by the secondary output it
substantially
will deliver without exceeding specified temperature rise. All voltage proportional to the
transformers are designed for a standard secondary voltage of 110 V primary voltage and
or 110 / 3 V. phase angle near to
zero for an
• Earthing Arrangements appropriate direction
Earthing has to be provided for of connection.
− safety of personnel,
− prevention of and minimizing damage to equipment as a result
of flow of heavy fault currents, and
− improved reliability of power supply.
The basic grounding system is in the form of an earth mat with risers. 55
Operation and
Maintenance
Risers of MS flat are generally provided. Earth mat is provided within the
substation area. The earth rods are connected to the station earth mat.
The earthing must be designed so as to keep the earth resistance as low
as possible. Earthing practices have been discussed in Unit 6 of the
course BEE-002.
• Reactive Compensation
Reactive compensation (as indicated by system studies of the network)
has to be provided. It is always a good idea to ensure a power factor
correction for transformers, since even when they are operating on low
load (e.g., during the night) they absorb reactive power, which must be
compensated to avoid unnecessary loadings and losses. You can recall
this aspect from Appendix 1 to Unit 4. Shunt capacitors (Fig. 5.6) are
connected on the secondary side (11 kV side) of the 33/11 kV power
transformers. The capacitors are generally of automatic switched type.
The automatic system of the capacitor bank has the task of switching in
the necessary capacitance according to the load requirements at each
given moment.
• Station Battery/DC Supply Arrangement
Fig. 5.6: Shunt Capacitors Station batteries supply energy to operate protection equipment such as
breakers and other control, alarm and indicating equipment (Fig. 5.7). The
station batteries are a source for operating DC control system equipment
during system disturbances and outages. During normal conditions the
rectifier provides the required DC supply. However, to take care of rectifier
failure, a storage battery of adequate capacity is provided to meet the DC
requirements.
Normally, in a 33/11 kV substation, the DC system is of 30 cells consisting
of 15 lead acid storage batteries or Nickel-Cadmium batteries. The battery
is connected in parallel with a constant voltage charger and critical load
circuits. The charger maintains the required voltage at battery terminal and
supplies the normally connected loads. This sustains the battery in fully
charged condition. The correct size battery charger has to be selected for
the intended application.
• Auxiliary Supply Transformer
Fig. 5.7: Battery Bank
An Auxiliary Supply Transformer of adequate capacity is required to be
provided for internal use for lighting loads, battery charging, oil filtration
plant, etc. The supply should be reliable. In a substation it is normally
provided from a station transformer connected on 33 or 11 kV bus bar.
• Fire Fighting System
In view of the presence of oil filled equipment in a substation, it is
important that proper attention is given to isolation, limitation and
extinguishing of fire so as to avoid damage to costly equipment and
reduce chances of serious dislocation of power supply as well as ensure
safety of personnel. The layout of the substation itself should be such that
the fire should not spread to other equipment as far as possible. Fire
56
Substation
extinguishers of the following type must be provided: Equipment and
− Carbon dioxide extinguisher, and Distribution
Lines
− Dry chemical powder extinguisher.
Carbon dioxide (CO2 type) extinguisher and Dry chemical powder type
extinguisher should conform to IS: 2878 and IS:2171, respectively. For oil
fire, foam type extinguishers are used (see Unit 7, BEE-002 also). The fire
fighting equipment should be maintained and kept in top condition for
instant use as per IS: 1948-1961 “Fire Fighting Equipment and its
Maintenance including Construction and Installation of Fire Proof Doors-
Fire Safety of Buildings (General)”.
List the equipment being used in your utility for the construction of
33/11 kV substation along with their typical ratings.
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
Transformers can be mounted outdoors (Figs. 5.8 and 5.9) in one of the
57
Operation and
Maintenance following ways: Plinth mounting, H-pole mounting and direct
mounting. We describe these mountings, in brief.
(a) (b)
Fig. 5.8: Transformer Mountings: a) Plinth Mounting; and b) H-Pole Mounting
• Protection System
• Lightning Arrestors
11 kV lightning arrestors 9 (kV) of outdoor type are used for diverting the
lightning surges to earth resistance of earth. The lightning arrestor should
be installed on the HT side and its lead should be kept at a minimum.
• LT Distribution Box
For transformers of 100 kVA and above, sheet metal LT distribution box
consisting of LT breaker and fuse cut-outs is provided from where
distribution feeders are to be taken out. The size of the box has to be
suitable for accommodating MCCB, fuse cut-outs, cable connectors,
bus-bars, etc.
• Reactive Compensation
List the equipment and their typical ratings, being used in the distribution
substations of your utility. Are all the protection equipment listed above
being used?
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
59
Operation and
Maintenance 5.4 DISTRIBUTION LINE EQUIPMENT
• supports,
• cross-arms,
• insulators,
(a)
• earthing knob,
• earthing coil,
• conductors,
• line accessories,
(b)
Fig. 5.10: a) Overhead
• guard wires, and
Lines Mounted
• LT line spacers.
on Cross-arm
Poles;
We describe each one of these, in brief.
b) Close-up
• Supports
Ø Wood poles: Chemically treated wood poles are used for distribution
lines. The advantage of using wood poles is that they are low in cost.
However, they are susceptible to decay. The specifications for wood
poles are covered by IS:876 and IS:5978. According to this standard,
60 the timber suitable for poles has been classified into three groups
Substation
depending upon its strength. For example, IS 6056 for jointed wood Equipment and
poles for overhead lines specifies that sal, deodar, chir, kail, wood be Distribution
used. Jointed wood poles with wire bound lap joint are considerably Lines
less expensive and found to be very suitable for LT and HT lines in
rural areas.
Ø Concrete poles: Concrete poles are more expensive than wood poles
but cheaper than steel tubular poles. Concrete poles are of three types:
− Old and second hand rails and Rolled Steel (RS) joists are
frequently used as supports for overhead lines. The portion
embedded in the ground should be protected by concrete muff
and the remaining portion by regular paint unless galvanised
steel is used.
Ø Lattice type supports: These are fabricated from narrow base steel
structures. They are light in weight and economical and can be
assembled at site if bolted construction is used. Normally both welded
and bolted types are used.
• Cross-arms
The shape and length of the cross-arms depend upon the desired
configuration of conductors. The following types of cross-arms and
brackets are used:
− top clamps.
• Insulators
You have learnt that an electrical insulator resists the flow of electricity.
Application of a voltage difference across a good insulator results in
negligible electrical current. Insulators made of glazed porcelain, tough
glass and polymers are used for supporting the conductors. Porcelain
insulators prevent the electrical current from energizing the power pole.
The earthing knob is used for supporting the neutral-cum-earth wire used
for earthing of metal parts of supporting structures of low-tension lines,
i.e., 400/230 V lines. The knob is generally made of cast iron 52x42 mm
and its electrical resistance is not to exceed 200 mega ohms. Moreover,
the breaking strength at the neck of the knob is not to be less than
11,500 kg when force is applied.
• Earthing Coil
Two types of earthing arrangements are used. One is with GI pipe and the
other is with GI wire. In case of GI pipe earthing, 40 mm dia and 2500 mm
long pipe is used for earthing of supports and fittings. GI wire is used for
earthing of lines. Generally 8 SWG wire with 115 turns, 50 mm dia and
1500 mm length is used.
• Line Accessories
This is the associated equipment required for fastening the conductors to
supports and taking off the power or supply points such as joints material,
clamps and compounds. For lines up to 33 kV, the following fittings are
used:
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
Due to the fast growth in load densities in major towns and cities, 33 kV, 11 kV
and LT underground cables are being used to meet the ever growing demand
of electric power. The underground cable system has attained
considerable importance in distribution networks. This is because in
towns and cities, almost all roads are already occupied by LT, HT overhead
lines, telephone lines, street lights, advertising boards, etc., on either side of
the roads. Further, high-rise buildings make it difficult to go for overhead
systems for sub-transmission or distribution. Moreover, the overhead system
with bare conductors is prone to frequent breakdowns causing interruption in
power supply. Uninterrupted power supply can be maintained by employing
underground cable ring system. The underground cabling system is
particularly important for metropolitan cities, city centres, airports and defence
services.
• Sizing of Cables
While making joints and terminations, it is essential to know the size and
type of the cable in order to select appropriate kits for joints and
terminations. The kits contain the accessories required along with
instruction sheets for step-by-step procedure for making joints and
terminations. The cable and end terminations should be prepared as per
the dimensional drawing and procedure given in the instruction sheet.
Types of Joints and Terminations
The joint is considered to be the weakest link in the system but the overall
reliability of a distribution system depends on it. Therefore, jointing
accessories and techniques have an important and critical role
despite their comparative low value in the overall investment.
The following types of joints and terminations are used:
− cast iron moulded,
− epoxy resin type,
− heat shrinkable,
− cold shrinkable, and
− ‘push on’ type.
The heat shrinkable, cold shrinkable and ‘push on’ type joints and
terminations do not need any setting time and can be taken into service
immediately.
List the reasons for using underground cables. State the selection
criteria, sizing, jointing and terminating of underground cables.
………………………………………………………………………………………
………………………………………………………………………………………
………………………………………………………………………………………
The power distribution utility must formulate such planned outage schemes at
different times of the year (depending upon the load demands) for different
maintenance periods in such a fashion that consumer supply is least affected.
NOTE
This also involves putting in place a system for handling customer complaints
Source: Special report about power supply breakdowns.
on CEA website
“Guidelines for Project Customer Relationship Management System
Management and
Performance Evaluation A trouble call management facility should be provided to attend to the power
of Sub-transmission and supply interruptions promptly and to improve the reliability of power supply as
Distribution Project”. well as minimise the down time. It should also attend to fuse off calls promptly
as well as the complaints of the customer on quality of supply. A computer
based facility provided in the substation/complaint attending centre would
certainly improve this aspect of O&M.
v Firstly, replacement of the parts that are worn out during the
normal operation must be carried out from time to time.
In the daily operation of the substation it is the duty of the attendant to inspect
the equipment externally and remedy any abnormality that does not require
disconnection of the apparatus. During this inspection, a watch is required to
be kept for deposits of dust and dirt on the equipment, heating of contacts,
joint or some part, low oil level and oil leakages, etc. Checks should also be
made to ensure that
• the locks and doors of the switch house are in good condition,
68 • no leaks have developed in the roof,
Substation
• the ventilating and heating systems are operating normally, Equipment and
• the prescribed safety aids are in place and in good order, Distribution
Lines
• the earthing connections remain unbroken,
• the packing of the cables entering or leaving a cable trench or tunnel
within the premises are intact,
• the ventilating louvers are not damaged, and
• the access roads leading to the oil filled apparatus are unobstructed,
and will allow the approach of the fire engines in the event of an oil fire
during an emergency.
Switchgear site tests during operational maintenance stage vary from utility
to utility depending upon the quality of upkeep of the equipment and
environmental conditions of the site. These generally involve the following
checks and tests:
• General checks include inspection and checking of
− the tightness of terminal connection, piping junctions and bolted joints;
− painting and corrosion protection;
− cleanliness;
− cracking and chipping of bushings;
− foundation bolts; and
− lubrication of contacts and moving parts of the circuit breakers.
• Electrical circuit checks include checking of
− insulation check;
− dielectric strength of the insulating oil;
− level of the oil;
− quality of SF6 gas/ insulating medium such as humidity content, filling
pressure or density except for sealed apparatus;
− leakage of oil, etc.
• Mechanical tests include
− inspection of operating circuits (hydraulic, pneumatic, spring charged)
and consumption during operation; 69
Operation and
Maintenance
− verification of correct rated operating sequence (recharging, etc).
Even though the vacuum switchgear does not require elaborate maintenance
like the oil insulated switchgear, it is still necessary to make periodic routine
inspection. The absence of ionized gas and carbon during interruption
removes the major source of insulation contamination.
The staff responsible for the pre-monsoon inspection should carry all the
necessary equipment such as ropes, petroleum jelly, cotton waste and
sufficient O&M materials like insulators, discs, nuts for the pins, binding wire,
etc.
In the routine maintenance practices, all the tree clearances are done
and all the minor defects like damaged insulators, improper pin binding,
loose jumpering and loose stays are rectified during the inspection itself. All
the insulators are cleaned, all AB switches are lubricated and defective blades
replaced. The defects that may take considerable time for rectification are
noted down and attended within the next one week. Examples are insertion of
poles, replacement of damaged conductors, replacement of damaged
supports, etc.
Line clear books are very important records. Pages in these books are serially
numbered and no paper from this book is used for any other purpose. If any
page is to be destroyed, the custodian specifically mentions the reasons for
doing so. It is attested by his/her dated signature. The line clear books are
reviewed periodically by the Competent Authority.
The status of the capacitor is determined by the voltage at the highest voltage
bus available at the substation. It is subject to the maximum permissible
voltage at the bus on which the capacitor bank is connected and the loading
factor. The loading factor is the ratio of the total MVA load on the bus at which
the capacitor is installed to the MVAR rating of the capacitor. Accordingly, the
switching on/off of the capacitor bank is done as per Table 5.1.
For 132 kV level 140 140 - 130 132 - 128 128 - 122 122
For 66 kV level 70 70 - 68 68 - 65 65 - 60 60
For 33 kV level 30 35 - 34 34 - 32 32 - 30 30
71
Operation and
The loading factor and the status of capacitor switch are given in Table 5.2.
Maintenance
When working with energized power lines, linemen must use protection to
eliminate any contact with the energized line. Some distribution-level voltages
can be worked using rubber gloves. The limit of how high a voltage can be
worked using rubber gloves varies from company to company according to
different safety standards and local laws. You may like to refer to Units 6
and 7, Block 2 (BEE-002) for more information.
For high voltage and extra-high voltage transmission lines, specially trained
personnel use so-called “live-line” techniques to allow hands-on contact with
energized equipment. In this case, the worker is electrically connected to the
high voltage line so that he is at the same electrical potential. The lineman
wears special conductive clothing which is connected to the live power line, at
an instant such that the line and the lineman are at the same potential allowing
the lineman to handle the wire safely. Since training for such operations is
lengthy, and still presents a danger to personnel, only very important
transmission lines are the objects of live-line maintenance practices.
…………………………………………………………………………………..
…………………………………………………………………………………..
The ratio of primary line length to its concerned secondary distribution line
length is one of the important factors that influence the performance of
primary distribution. Over the years, large scale expansion of the urban
system and rural electrification programme in the country has resulted in
considerable expansion of Low Tension (LT) distribution network. The size of
the distribution transformers has been constantly increasing to meet the
increasing demand due to load growth.
5.7 SUMMARY
5. List the different types of underground cables in use today. What criteria
are used for the selection of these cables?
7. Give reasons why underground cabling is being opted for in urban areas.
What are its advantages?
75
Operation and
Maintenance
76