You are on page 1of 4

Technical Requirement for Server Room & TCR Revision: 1/2004

1.0 SERVER ROOM

The server room will house the main servers, backbone switches,
patch panels and fiber termination.

There must be NO water or liquid pathway, sources and outlets in the


ceiling above the rack. This includes waste water pipes, chilled water
pipes, hot water pipes, sewer pipes, rain water down pipes, etc.

Architectural Specifications:
No Description Minimum Specifications and Size
1 Room 7,000mm x 4,000mm*
2 Raised Floor ‰ Raised by 250mm unless specified in
the BQ.
3 Floor, Walls and ‰ Fire Rated
Ceiling ‰ Semi glass wall
‰ Dust Free Finishes
4 Door ‰ 400mm Doubled leaf door (glass with
aluminium frame)

1/4
Technical Requirement for Server Room & TCR Revision: 1/2004

M&E Specifications:
No Description Minimum Specifications and Size
1 Air-conditioning ‰ Total heat dissipated by equipments in
the room: 50,000 BTU*
‰ Operating temperature 20°C ± 5% with
Temperature measured at remote
corner.
‰ Operating hours: 24 x 7
‰ Alternate and Auto start Split Unit Air-
cond.
‰ Central Air-conditioning / return air not
required.
2 Humidity 50% RH
3 Fire Fighting Heat sensor / smoke detector with
Argonite Gas
NO SPRINKLER SYSTEM
4 Grounding Grounding Bus Bar with independent
grounding not more than 1.0Ω (Refer to
JKR Standard LS1 for earthing installation)
5 Power Source For Central UPS:
‰ 60A Isolator - 3 phase essential
supply*
(Tap from MSB).
‰ 60A Isolator – 3 phase normal supply*
(Tap from MSB or SSB).
‰ 4 nos (min) utility s/s/o 13A in general
DB.

(Please refer to Schematic Diagram


attached)

For Standalone UPS:


‰ 8 nos (min) utility s/s/o 13A dedicated
DB in Server Room.*

5 Telecommunication DP 20 way
Lines
6 Security System Card Access System

2/4
Technical Requirement for Server Room & TCR Revision: 1/2004

Raised Floor Specifications:


No Description Minimum Specifications and Size
1 Material Cement Plaster sandwiched between steel
top sheet and bottom steel pan
2 Panel tile size 600mm x 600mm with pedestals and
stringers
3 Panel Thickness Overall thickness – 45mm
4 Floor Height 250mm to accommodate under floor
IT/power cable trunking
5 Floor Finishing Smooth, Anti Static and High Pressure
laminate
6 Understructure Rigid Grid with stringer
7 Concentrated Load 1000lb
8 Maximum load per 2000lb
tile
9 Uniform Load 260lb/ft2
10 Rolling Load 600lbs load on a 6” diameter x 1 ½” width
wheel for 10,000 passes
11 Impact Load 120lbs drop from a height of 12”
12 Ramp Slope 1/10
13 Power Source All utility s/s/o 13A under the raised floor
must be of metal clad type.*

1.1 General Requirements


‰ The complete floor must be sturdy, rigid, smooth, level, and
free from rocking, rattles, and squeaks and noise.
‰ Raised floor cable service openings (Cable Grommet) to be
provided at respective equipment racks. These outlets shall
accommodate wiring for IT and power.
‰ Airflow panels to be steel welded with 25% open air
perforated top sheet with adjustable damper assembly.
Panels shall be capable of supporting design load of 1000lbs
per square inch anywhere on the panel. Adequate amount of
Airflow panels shall be provided and distributed evenly to
cool and maintain the room to the specified temperature.
‰ To provide 2 units of panel tilting devices, dual rubber
suction cup type with metal handle and pressure release
knob.

3/4
Technical Requirement for Server Room & TCR Revision: 1/2004

2.0 TELECOMMUNICATION CLOSET ROOM (TCR)


The TCR will house the equipment rack, network switches, patch
panels and fiber termination.

There must be NO water or liquid pathway, sources and outlets in the


ceiling above the rack. This includes waste water pipes, chilled water
pipes, hot water pipes, sewer pipes, rain water down pipes, etc.

Architectural Specifications:
No Description Minimum Specifications and Size
1 Room 2,000mm x 2,000mm

2 Floor, Walls and ‰ Dust Free Finishes


Ceiling

M&E Specifications:
No Description Minimum Specifications and Size
1 Air-ventilation ‰ 1 nos aircond-duct outlet from Central
Airconditioning and
‰ 1 nos exhaust fan or enough airflow
ventilation.
2 Power Source ‰ 2 nos (min) utility s/s/o 13A from
essential supply.

4/4