ESTIMATED COST FOR ELCTRICAL WORK AT BOYS HOSTEL TOP FLOOR.
Date:
S.N Work Quantity Per price Total in Rs
o 1 Fan & Tube point 83 150 12450.00 2 Socket point 17 80 1360.00 3 Fan fitting 33 50 1650.00 4 Tube light fitting 48 50 2400.00 5 Main line wiring 2362 feet=23.62 150 3543.00 points Total Amount 21403.00