Professional Documents
Culture Documents
GGN DD 033 - D0 PDF
GGN DD 033 - D0 PDF
December 2018
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning of NH-31 D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur - Salsalabari section in the State of West Bengal on EPC mode
SUMMARY OF REVISIONS
Approved By
Description of
Rev Date
modification/revision
Name/Position Signature
NMDC–RLIANCE–RIZZANI JV 2
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning of NH-31 D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur - Salsalabari section in the State of West Bengal on EPC mode
TABLE OF CONTENTS
1. INTRODUCTION…………………………………………………………………4
1.1 SCOPE
1.2 GEOMETRIC DESCRIPTION
2. DESIGN OF FIXED ABUTMENT (A1)…………………………………………5-73
3. DESIGN OF FREE ABUTMENT (A2)…………………………………………74-145
4. DESIGN OF ABUTMENT PILE CAP………………………………………….146-161
5. DESIGN OF PIER P1 & P2…………………………………………………….162-217
6. DESIGN OF PIER PILE CAP………………………………………………….218-235
7. DESIGN OF SEISMIC RESTRAINERS & PEDASTAL……………………..236-245
8. DESIGN OF TEST PILE………………………………………………………..246-251
NMDC–RLIANCE–RIZZANI JV 3
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to
Four Laning of NH-31 D from Km. 113+200 to km. 154+854 (Package-2-A) of
Ghoshpukur - Salsalabari section in the State of West Bengal on EPC mode
1 INTRODUCTION
The project scope is to widening of NH-31D from km 113.200 near Ghoshpukur to chainage
of 154.854 near Salsalabari. The project is an upgradation of existing two lane highway to
four lane highway. This report summarizes the design calculation of Major Bridge at
chainage 121+255
.
1.1 Scope
The present document constitutes the structural design for Palasbari Bridge at Chainage
121+255. The report is based on available data presented in geotechnical report submitted
on 31st October 2018 by Geotech consultants and SIMPLEX. Any changes in the basic data
may needs further revision of this report.
This bridge has been designed as 3 span simply supported bridge of center to center
expansion joint span length 24.3m (skew 25 degree). The superstructure is constitutes of
five numbers of precast RCC I – girder with cast in situ RCC deck slab. As per geotechnical
investigation report pile foundation has been adopted for designing substructure for this
bridge. The pile cap top level has been kept at 0.5m below the existing ground level. The
vertical clearance available from the soffit of the superstructure to the HFL is 0.9m. (Refer
GAD)
The deck width of the superstructure is 16.0m wide, which supports three lane carriageway
with a divided footpath on one side. However, considering future expansion provision the
superstructure has been designed considering four lane carriageway without footpath. RCC
cantilever type abutment with return wall and median wall has been proposed for the bridge.
Wall type pier with open foundation has been proposed as intermediate support. Provision
of two number of pin bearing with five numbers of Pot cum PTFE bearing is provided in the
superstructure to restrict the horizontal forces during seismic. Seismic stopper has been
provided in all pier cap and abutment cap as an additional protective measure for prevention
of dislodgement. (Refer GAD)
The detailed report of design calculation of individual element of bridges has been attached
in the following sections. The design of pile cap is on hold and it shall be issued following
the comments of the proof checker on pile and pile reactions.
NMDC–RLIANCE–RIZZANI JV 4
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal
A1_Fx-121+255_skew 5
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197
DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Designed By: Checked By: Date
Bengal
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
1. General
This design note pertains to the design of abutment . Superstructure consists of
precast PSC girder,supported on POT PTFE bearing.
The substructure consists of RCC wall type abutment on open foundation.
1 IRC : 6 2017
3 IRC : 78 2014
3. Loads
1 Dead load (Due to self weight of superstructure, substructure, foundation and backfill weight)
2 Superimposed Dead Load (SIDL) excluding wearing course due to crash barrier, footpath and railing
(if present)
3 Superimposed Dead Load (SIDL) due to wearing course
4 Carriageway live load Future widening keeping in mind
Max P case
Max Mt case
5 Footpath Live Load (FPLL) (if footpath is present)
6 Earth pressure due to backfill
7 Buoyancy in HFL case
Wind load is not considered as it is not governing
A1_Fx-121+255_skew 6
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197
DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Designed By: Checked By: Date
Bengal
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
5. Design Philosophy
Design is done using limit state method
ULS and SLS strengths of abutment section is checked using Fagus software
Basic combination is used for checking ULS strength. Rare combination is used for checking
stress. Quasi-permanent combination is used for checking crack width.
A1_Fx-121+255_skew 7
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
A1_Fx-121+255_skew 8
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
A1_Fx-121+255_skew 9
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
For Piles
5.26
Dia of piles 1.20 m y
3.03
61.170m Bearing Lvl
CTL
2.28 0.85 60.820m
0.00
0.80
1.18 0.3
GL 59.500m
Distance between bearing c/l and mid of shaft sec at bottom in long. dirn. = 0.01 m
C/l of bearing is to the right of c/l of shaft
Eccentricity Shaft c/l to fdn c/l = 0.01227091 m
1.7 Partial Safety Factors
Partial safety factor for relevant loads are presented here
(As per Annex B of IRC:6-2017)
A1_Fx-121+255_skew 10
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
- - 0.75 -
Seismic Effect (During construction)
A1_Fx-121+255_skew 11
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
For Loads Unfactored load combinatins for verification of equilibrium as per IRC:78-2014
(For Verification of Equilibrium)
Basic Comb Seismic Comb
Load Overturnin Overturning or
Resisting Resisting
g or Sliding Sliding
Dead Load 1 1 1.00 1.0
SIDL (except surfacing) 1 1 1.00 1.0
SIDL (surfacing) 1 1 1.00 1.0
Live load and associated loads
1 0 - -
(Leading)
Live load and associated loads
1 0 1 0
(Accompanying)
Water Current - 0 1.0 -
Buoyancy 1.0 - 1.0 -
Earth Pressure 1 - 1.0 -
Live Load Surcharge 1 0 1 -
Thermal Load (Leading) 1 0 1 -
Thermal Load (Accompanying) 1 0 1 -
Seismic Effect (During service) - - 1.0 -
- - 1 -
Seismic Effect (During construction)
A1_Fx-121+255_skew 12
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
1.5 1 1.35 1 1
Backfill (adding effect)
1.35 1 1.35 1 1
Backfill (relieving effect)
Water Current 1 1 1 0 1
- - 0.75 0 0
Seismic Effect (During construction)
Unfactored Loads as per Cl. 706.1 of IRC:78-2014 has been considered for base pressure check
For Materials
Basic Seismic
Material
Comb Comb
Concrete 1.5 1.5
Reinforcing steel 1.15 1.15
SIDL
Excluding wearing course
Self weight of crash barrier = 1.0 t/m
Self weight of railing = 0 t/m
Transverse eccentricity of crash barrier (with footpath case) = 0.00 m
Transverse eccentricity of crash barrier (without footpath case) = 0.00 m
Transverse eccentricity of railing = 0.00 m
Total weight of footpath/services 0.00 t
Transverse eccentricity of footpath/services = 0.00 m
A1_Fx-121+255_skew 13
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
Temperature variation = 30 oC
Factor by which seismic force is increased for design of foundation in long = 1.35 (Cl.219.8, IRC 6 2017)
Factor by which seismic force is increased for design of foundation in Trans = 1
1.12 Sign Convention
Resisting moment (about toe) Positive
Overturning moment (about toe) Negative
A1_Fx-121+255_skew 14
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 033
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
2 Load Calculation from Superstructure
A1_Fx-121+255_skew 15
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 033
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
2.3 SIDL (wearing course)
With Footpath Case
Load intensity due to wearing course = 2.2 t/m3
DL of wearing course = 80.19 t
Total reaction on abutment (SIDL excluding w/c) = 40.095 t
A1_Fx-121+255_skew 16
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 033
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
A1_Fx-121+255_skew 17
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
= 3.20E+06 t/m^2
d2 = FL3/3EI = 0.0014 mm
A1_Fx-121+255_skew
18
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Transverse direction:
Z = Zone factor = 0.36
A1_Fx-121+255_skew
19
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from 033
KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
4.0 Calculation of Earth Pressure Co-efficient & Dynamic increament : (As per IRC-6:2017)
LWL Case:
Input : gsat = 2.0 t/m3
3
Density of Earth g dry = 1.8 t/m
gsub = 1.0 t/m3
Angle of internal friction of soil f = 30 deg = 0.524 radians
Angle of friction between wall and earthfill d = 20 deg = 0.349 radians
Angle which earth face makes with the vrtical a = 0 deg = 0.000 radians
Slope of earthfill b = 0 deg = 0 radians
Live Load surcharge = 1.20 m
Horizontal Seismic Coefficient ah = 0.18
Vertical seismic coefficient av = 0.12
Slope of earthfill i = 0 deg = 0 radians
Angle of earthface of wall with vertical a' = 0 deg = 0 radians
Width of abutment in dir. normal to traffic direction = 16.0 m
Skew angle = 25 deg = 0.436 radians
F1
F2 4.850 6.650 m
Ka = cos2(f-a) = 0.297
cos2a*cos(d+a)*[1+sqrt(sin(f+d)*sin(f-b)/cos(a-b)*cos(d+a)]2
Kp = cos2(f+a) = 6.105
cos a*cos(d-a)*[1-sqrt(sin(f+d)*sin(f+b)/cos(a-b)*cos(d-a)]
2 2
Calculation of forces and moments at Bottom of foundation due to live load surcharge and
earth pressure
Foundation Bottom:
Sno. Item Pressure Width Height Force Fl Lever arm Ml Fv
2
(t/m ) (m) (m) (T) (T) (m) (Tm) (T)
1 F1 0.603 17.65 6.650 70.792 70.792 3.325 235.383 0.5H
2 F2 3.340 17.65 6.650 196.057 196.057 2.793 547.587 0.42H 71.677
A1_Fx-121+255_skew
20
Calculation of active earth pressure for dynamic increment
F1 6.650 m
F2 4.850
Abutment Base:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 4.850 51.630 51.630 2.425 125.203 H/2 0.000
2 F2 2.436 17.654 4.850 104.288 104.288 1.601 166.913 H/3 38.127
Dynamic increamnet component
1 F1 0.346 17.654 4.850 29.625 29.625 3.201 94.830 0.66H 0.000
2 F2 1.397 17.654 4.850 59.807 59.807 2.425 145.032 H/2 21.680
Foundation Bottom:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 6.650 70.792 70.792 3.325 235.383 H/2 0.000
2 F2 3.340 17.654 6.650 196.057 196.057 2.195 430.247 H/3 71.677
Dynamic increamnet component
1 F1 0.346 17.654 6.650 40.620 40.620 4.389 178.281 0.66H 0.000
2 F2 1.915 17.654 6.650 112.410 112.410 3.325 373.763 H/2 40.749
A1_Fx-121+255_skew
21
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from
KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
5.0 Calculation of Earth Pressure Co-efficient & Dynamic increament : (As per IRC-6:2017))
HFL Case:
F1
F3 4.850 6.650 m
p3 p1 59.350 (HFL)
p4 p2
F2 0.350 2.150
F4
59.000 (Top of heel)
F5
p4 1.800 57.200 (Bottom of Foundation)/LWL
p5 p2
Ka = cos2(f-a) = 0.308
cos2a*cos(d+a)*[1+sqrt(sin(f+d)*sin(f-b)/cos(a-b)*cos(d+a)]2
Above HFL
Horizontal coefficient Kh=Kacos d = 0.303 0.279
Vertical coefficient Kv=Kasin d = 0.053 0.102
Calculation of forces and moments at Bottom of foundation due to live load surcharge and
earth pressure
Foundation Bottom:
Sno. Item Pressure Width Height Force Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
1 F1 0.603 17.65 4.500 47.904 47.904 4.400 210.778 0.5H 0.000
2 F2 0.654 17.65 2.150 24.823 24.823 1.075 26.685 0.5H 0.000
3 F3 2.260 17.65 4.500 89.771 89.771 4.040 362.675 0.42H 32.820
4 F4 2.454 17.65 2.150 93.145 93.145 1.075 100.131 0.5H 34.053
5 F5 0.651 17.65 2.150 12.355 12.355 0.710 8.766 0.33H 2.161
A1_Fx-121+255_skew
22
Calculation of earth pressure for seismic case
63.850 (Top of deck slab)
p1
F3
F1 6.650 m
p3 4.850 59.350 (HFL)
p4 F2 p2
F4
59.000 (Top of heel)
F5
p4 57.200 (Bottom of foundation)
p5 p2
Abutment Base:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 4.500 47.904 47.904 2.600 124.550 H/2 0.000
2 F2 0.654 17.654 0.350 4.041 4.041 0.175 0.707 0.5H 0.000
3 F3 2.260 17.654 4.500 89.771 89.771 1.835 164.730 H/3 32.820
4 F4 2.454 17.654 0.350 15.163 15.163 0.175 2.654 0.5H 5.543
5 F5 0.106 17.654 0.350 0.327 0.327 0.116 0.038 0.33H 0.057
Foundation Bottom:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 4.500 47.904 47.904 4.400 210.778 H/2 0.000
2 F2 0.654 17.654 2.150 24.823 24.823 1.075 26.685 0.5H 0.000
3 F3 2.260 17.654 4.500 89.771 89.771 3.635 326.318 H/3 32.820
4 F4 2.454 17.654 2.150 93.145 93.145 1.075 100.131 0.5H 34.053
5 F5 0.651 17.654 2.150 12.355 12.355 0.710 8.766 0.33H 2.161
A1_Fx-121+255_skew
23
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197 DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Designed By: Checked By: Date
state of West Bengal
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Live Load
Max Reaction Case i/c Lane deduction factor/congetion factor Without Impact
P = 136.5 t eL 0.9
ML = 126 t-m
MT = 23 t-m
HT = 0
Max MT Case
P = 98 t eL 0.918367347
ML = 90 t-m
MT = 412.8
HT = 0
Normal Case
Fh-u(Rq+Rg) 0.98025 t
Long force 36.5 t
Fh/2+u(Rq+Rg) 36.51975 t
A1_Fx-121+255_skew 24
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197 DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Designed By: Checked By: Date
state of West Bengal
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Seismic Case
u (Rq) 1.365 t
Fh 5t
Trans Seismic Long Seismic
u(Rq+Rg) = 21.05975 t
Fh-u(Rq+Rg) -13.5598 t
Fh/2+u(Rq+Rg) 21.05975 t
Normal Case
Fh-u(Rq+Rg) 0.67525 t
Long force 33.47975 t
Fh/2+u(Rq+Rg) 33.4798 t
Seismic Case
u (Rq) 0.98 t
Fh 22.77 t Remember to remove lane deduction from here
Trans Seismic Long Seismic
u(Rq+Rg) = 29.55975 t
Fh-u(Rq+Rg) 4.59525 t
Fh/2+u(Rq+Rg) 29.5598 t
A1_Fx-121+255_skew 25
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
3 Max MT case
Live Load Reaction on abutment = 19.60 t Max MT Case Reaction
A1_Fx-121+255_skew 26
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
4 Max Rxn case
Live Load Reaction on abutment = 27.30 t Max P Case Reaction
Longitudinal Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
3 lane Class A 13.09 -13.09 0.18 51.37 123.80 24.55 Max MT
1 lane 70R-W + 1 lane Class A 13.36 -13.36 0.18 53.38 123.80 25.07 Max P
Transverse Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
3 lane Class A 13.09 -13.09 0.18 171.22 37.14 81.84 Max MT
1 lane 70R-W + 1 lane Class A 13.36 -13.36 0.18 177.94 37.14 83.58 Max P
Vertical Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
3 lane Class A 43.62 -43.62 0.59 51.37 37.14 24.55 Max MT
1 lane 70R-W + 1 lane Class A 44.54 -44.54 0.61 53.38 37.14 25.07 Max P
A1_Fx-121+255_skew 27
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Transverse Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 13.36 -13.36 0.18 177.94 37.14 83.58
SL2 13.09 -13.09 0.18 171.22 37.14 81.84
Vertical Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 44.54 -44.54 0.61 53.38 37.14 25.07
SL2 43.62 -43.62 0.59 51.37 37.14 24.55
Transverse Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 13.36 -13.36 80.8 359.3 37.14 83.58
SL2 13.09 -13.09 80.8 348.8 37.14 81.84
Vertical Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 44.54 -44.54 81.2 107.8 37.14 25.07
SL2 43.62 -43.62 81.2 104.6 37.14 24.55
A1_Fx-121+255_skew 28
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Transverse Seismic
ML due ML due
ML (about
to HL to P MT (about HL HT
Pmax Pmin footing c/l)
Load Case (about (about footing c/l) Seismic Seismic
due to HL
toe) toe)
t t t-m t-m t-m t t t
SL1 13.36 -13.36 -147.5 -31.7 509.8 147.5 37.14 83.58
SL2 13.09 -13.09 -147.5 -31.0 499.2 147.5 37.14 81.84
Vertical Seismic
ML due ML due
to HL to P MT (about ML (about HL HT
Pmax Pmin
Load Case (about (about footing c/l) footing c/l) Seismic Seismic
toe) toe)
t t t-m t-m t-m t t t
SL1 44.54 -44.54 -147.5 -105.5 152.9 147.5 37.14 25.07
SL2 43.62 -43.62 -147.5 -103.3 149.8 147.5 37.14 24.55
A1_Fx-121+255_skew 29
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Designed By: Checked By: Date
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
SUMMARY:
Earth Pressure: Live Load Surcharge:
A1_Fx-121+255_skew 30
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
0.3 1.30
0.4 3.03
c 0.80 0.00
1.18
a HFL
0.97
0.35
0.80
0.00 d
0.00 1.80
1.80
1.98 1.98
4.76
C.G. Cl of Fdn
Width of abutment b = 16.00 m Width of pilecap = 16.00 m
Return Wall is on 2 side b/cos q = 17.6540467 m b/cos q = 17.654047 m
Horizontal distance of abutment shaft bottom from vertical face = 0.40 m
Horizontal distance of CG of abutment shaft from vertical face = 0.40 m
Normal Case
Moments about c/l of foundation
A1_Fx-121+255_skew
31
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
"e" fro mC/L
Horizontal Lever Arm Hor.Lever Arm ML about ML about ML about
Component Weight ML of
from shaft at bottom c/l from toe toe C/L C/L
foundation
t m t-m m t-m m t-m t-m
Standard Dirt Wall Bracket 5.96 1.566 9.3 3.95 23.5 -1.85 -11.0 0.0
Dirt Wall 40.12 1.432 57.5 3.82 153.0 -1.43 -57.5 0.0
Abutment Cap
94.19 0.441 41.6 2.82 266.0 -0.44 -41.7 0.0
(uniform)
Abutment Cap
0.00 0.000 0.0 2.82 0.0 -0.04 0.0 0.0
(varying)
Abutment Shaft 34.26 0.000 0.0 2.38 81.6 0.00 0.0 0.0
Total 174.5 108.3 524.2 -110.3 0.0
Seismic Case
Weight Full Design Seismic Forces
Component
t r1 r2 r3
Dirt Wall Bracket 6.0 1.1 1.3 0.7
Dirt Wall 40.1 7.2 9.0 4.8
Abutment Cap
94.2 17.0 21.2 11.3
(uniform)
Abutment Cap
0.0 0.0 0.0 0.0
(varying)
Abutment Shaft 34.3 6.2 7.7 4.1
Foundation 378.4 68.1 85.2 45.4
θ is skew angle Put % of Exposed pile cap where seismic force to be considered 1
A1_Fx-121+255_skew
32
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
Vert. Lever
Hor.Lever Arm from Arm from
ML due to HL (about toe) ML due to V (about toe) MT
toe foundation
bottom
m m t-m t-m t-m
3.95 6.4 6.9 0.8 2.6
3.82 5.1 37.1 5.5 13.9
2.82 3.2 54.2 9.6 20.3
2.38 2.8 0.0 0.0 0.0
2.38 2.3 14.1 2.9 5.3
112.2 18.9 42.1
Vert. Lever
Hor.Lever Arm from
Arm from ML due to HL ML due to V MT
bearing c/l
shaft bottom
m m t-m t-m t-m
3.95 6.4 2.1 0.8 8.6
3.82 5.1 11.1 5.5 46.4
2.82 3.2 16.3 9.6 67.8
2.38 2.8 0.0 0.0 0.0
2.38 2.3 4.2 2.9 17.6
33.7 18.9 140.4
A1_Fx-121+255_skew
33
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
Vert. Lever
Hor.Lever Arm from
Arm from ML due to HL ML due to V MT
bearing c/l
shaft bottom
m m t-m t-m t-m
3.95 6.4 2.1 2.8 2.6
3.82 5.1 11.1 18.4 13.9
2.82 3.2 16.3 31.9 20.3
2.82 2.8 0.0 0.0 0.0
2.38 2.3 4.2 9.8 5.3
33.7 62.9 42.1
Seismic Case
Longitudinal Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 174.5 174.5 108.3 0.0 0.0 0.0
Seismic Force on
6.3 -6.3 51.8 20.9 31.4 11.8
Substr.
A1_Fx-121+255_skew
34
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 174.5 174.5 108.3 0.0 0.0 0.0
Buoyancy -4.5 -4.5 0.0 0.0 0.0 0.0
Seismic Force on
6.3 -6.3 51.8 20.9 31.4 11.8
Substr.
Transverse Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 174.5 174.5 108.3 0.0 0.0 0.0
Seismic Force on
6.3 -6.3 12.8 69.6 29.9 39.3
Substr.
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 174.5 174.5 108.3 0.0 0.0 0.0
Buoyancy -4.5 -4.5 0.0 0.0 0.0 0.0
Seismic Force on
6.3 -6.3 12.8 69.6 29.9 39.3
Substr.
Vertical Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 174.5 174.5 108.3 0.0 0.0 0.0
Seismic Force on
20.9 -20.9 3.7 20.9 9.4 11.8
Substr.
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 174.5 174.5 108.3 0.0 0.0 0.0
Buoyancy -4.5 -4.5 0.0 0.0 0.0 0.0
Seismic Force on
20.9 -20.9 3.7 20.9 9.4 11.8
Substr.
Trapezoidal Part
Volume = 0.0 m3
Weight = 0t
3
Total Volume of foundation = 151.3 m
Total Weight of foundation = 378.36 t
A1_Fx-121+255_skew
35
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
Calculation for Return Wall
ML about
Hor.Lever Arm from toe
Weight ML about toe e about c/l of C/L of
Portion in L-L dirn.
foundation foundation
t m t-m m t-m
a 8.5 4.36 37.3 -2.0 -16.9 -1.7560952
b 2.5 3.37 8.5 -1.0 -2.5
c 0.0 3.57 0.0 -1.2 0.0
d 0.0 4.10 0.0 -1.7 0.0
Total 11.1 45.8 -19.4
Submerged height of return wall in HFL case upto foundation top level = 0.35 m
Submerged volume of return wall = 0.61 m3
Buoyancy force on return wall = -0.61 t
Longitudinal moment due to buoyancy force on return wall about toe = -2.5 t-m
Transverse moment due to buoyancy about centerline of footing = -4.7713592 t-m
Longitudinal moment due to buoyancy force on return wall about C/L of foundation = 1 t-m
A1_Fx-121+255_skew
36
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
LWL
ML about
Hor.Lever Arm from toe
Weight ML about toe e about c/l of C/L of
Portion in L-L dirn.
foundation foundation
t m t-m m t-m
a 116.8 4.36 509.6 -2.0 -231.5
b 34.6 3.37 116.8 -1.0 -34.4
c 0.00 3.57 0.0 -1.2 0.0
d 0.00 4.10 0.0 -1.7 0.0
Total 151.4 626.4 -265.9
HFL
ML about
Hor.Lever Arm from toe
Weight ML about toe e about c/l of C/L of
Portion in L-L dirn.
foundation foundation
t m t-m m t-m
a 112.1 4.36 489.2 -2.0 -222.2
b 29.1 3.37 98.1 -1.0 -28.9
c 0.00 3.57 0.0 -1.2 0.0
d 0.00 4.10 0.0 -1.7 0.0
Total 141.2 587.3 -251.1
Normal Case
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) Pmax Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 174.5 174.5 0.0 524.2 0.0 0.0 0.0 174.5 174.5 0 0 -110.3 0.0
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.36 378.36 0 0 0.0 0
Return Wall Wt. 11.1 11.1 0.0 45.8 86.3 0.0 0.0 11.1 11.1 0 0 -19.4 0
Backfill Wt. 151.4 151.4 0.0 626.4 0.0 0.0 0.0 151.4 151.4 0 0 -265.9 0
A1_Fx-121+255_skew
37
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
Seismic Case
Longitudinal Seismic
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) Pmax Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 174.5 174.5 0.0 524.2 0.0 0.0 0.0 174.5 174.5 0.0 0.0 -110.3 0.0
Seismic Force on
6.3 -6.3 -112.2 -18.9 42.1 31.4 11.8 19.9 -19.9 99.5 37.3 170 65
Substr.
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Return Wall Wt. 11.1 11.1 0.0 45.8 86.3 0.0 0.0 11.1 11.1 0.0 0.0 -19.4 0.0
Backfill Wt. 151.4 151.4 0.0 626.4 0.0 0.0 0.0 151.4 151.4 0.0 0.0 -265.9 0.0
Transverse Seismic
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) P Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 174.5 174.5 0.0 524.2 0.0 0.0 0.0 174.5 174.5 0.0 0.0 -110.3 0.0
Seismic Force on
6.3 -6.3 -33.7 -18.9 42.1 29.9 39.3
Substr. 19.9 -19.9 29.9 124.5 48 217
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Return Wall Wt. 11.1 11.1 0.0 45.8 86.3 0.0 0.0 11.1 11.1 0.0 0.0 -19.4 0.0
Backfill Wt. 151.4 151.4 0.0 626.4 0.0 0.0 0.0 151.4 151.4 0.0 0.0 -265.9 0.0
A1_Fx-121+255_skew
38
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterje 14-12-2018
HFL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) P Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 174.5 174.5 0.0 524.2 0.0 0.0 0.0 174.5 174.5 0.0 0.0 -110.3 0.0
Seismic Force on
6.3 -6.3 -33.7 -18.9 42.1 29.9 39.3
Substr. 19.9 -19.9 29.9 124.5 48.1 217.0
Buoyancy on substr. -4.5 -4.5 0.0 -10.67 0.0 0.0 0.0 -4.5 -4.5 0.0 0.0 0.0 0.0
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Buoyancy on fdn. -151.34 -151.34 0 -360.40 0 0 0 -151.3 -151.3 0.0 0.0 0.0 0.0
Return Wall Wt. 11.1 11.1 0.0 45.8 86.3 0.0 0.0 11.1 11.1 0.0 0.0 -19.4 0.0
Buoyancy on Return
-0.6 -0.6 0.0 -2.5 -4.8 0.0 0.0
wall. -0.6 -0.6 0.0 0.0 1.1 0.0
Backfill Wt. 151.4 151.4 0.0 626.4 0.0 0.0 0.0 141.2 141.2 0.0 0.0 -251.1 0.0
Vertical Seismic
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) P Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 174.5 174.5 0.0 524.2 0.0 0.0 0.0 174.5 174.5 0.0 0.0 -110.3 0.0
Seismic Force on
20.9 -20.9 -33.7 -62.9 42.1 9.4 11.8
Substr. 66.3 -66.3 29.9 37.3 39 65
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Return Wall Wt. 11.1 11.1 0.0 45.8 86.3 0.0 0.0 11.1 11.1 0.0 0.0 -19.4 0.0
Backfill Wt. 151.4 151.4 0.0 626.4 0.0 0.0 0.0 151.4 151.4 0.0 0.0 -265.9 0.0
A1_Fx-121+255_skew
39
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D
from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
T-T
As'
ML
L-L
0.8
MT
As
17.65m sk
Provision of Reinforcement
T direction
2
Compression Face 140 No. 12 mm dia bar AsL' = 15833.6 mm
2
Tension Face 140 No. 20 mm dia bar AsL = 43982.3 mm
0 No. 20 mm
Spacing in Tansverse direction = 126 mm < 200.0 OK
L direction
2
Compression Face 6 No. 12 mm dia bar AsL' = 678.6 mm
2
Tension Face 6 No. 12 mm dia bar AsL = 678.6 mm
ULS and SLS strengths of abutment section is checked using AdSec 8.2 (FAGUS software).
The output summary is attached in Appendix 1.
Under ULS, moment capacity of the section is checked.
kN kN-m kN-m
1 Max P Case 0.0 345.0 9294.3
2 Min P Case 0.0 156.7 4533.8 4312.050991
3 Max ML Case 0.0 1976.3 10306.1 4198.648991
4 Min ML Case 0.0 0.0 4519.4
A1_Fx-121+255_skew
40
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D
from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Summary of Critical Load Cases from Rare Combination
P ML MT
t t-m t-m
Max P Case 655.5 630.9 23.0
Summary of Critical Load Cases from Quasi-permanent Combination (for crack width check)
P ML MT
t t-m t-m
Max P Case 526.4 325.6 0.0
Distribution Reinforcement
Distribution reinforcement = 0.25 % of gross area Cl. 710.3.4, IRC:78-2014
Distribution reinforcement per meter height = 2000 mm2/m
2
Distribution reinforcement per meter height on each face = 1000 mm /m
2
Ast,provided per meter height = 1256.6 mm /m OK
Minimum area of horizontal reinf. per meter = 25 % of Area of vertical reinf. or 0.001Ac whichever is greater
2
= 800.00 mm /m Cl. 16.3.2, IRC:112-2011
2
Total area of horizontal reinf. provided per meter = 2513.3 mm /m OK
A1_Fx-121+255_skew
41
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D
from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
2
Area of confined core ACC = 11377630.4 mm
ωw,req = 0.0083
For rectangular sections
Minimum confining reinforcement
ωwd.c ≥ max(ωw,req ; 0.12)
ωwd.c ≥ 0.12
Therefore confining reinforcement will be provided over a length of = 800.00 mm above founding top level
A1_Fx-121+255_skew
42
Document
LOUIS BERGER No.
4800197-GGN-
Job No. LOUIS BERGER DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal Designed By: Checked By: Date
Abutment design
FAGUS
SECTION PROPERTIES
RESULTS
43
UR :
STRESS RESULTS
CRACK CHECK
44
LOUIS BERGER Document No.
Material property
Grade of reinforcement = 550
fyk = 550 Mpa
Modulus of elasticity Es = 200000 Mpa
Grade of concrete = M35
fck = 35
fcm = 45
Ecm = 32308 Mpa
Fyd = 440 Mpa
Clear cover = 75 mm
Ecm for short tem loading = 32308 Mpa
Ecm for long term loading = 16154 Mpa
fcteff = 2.77 Mpa
fcd = 15.61 Mpa
Creep factor φ = 1
εcu2 = 0.0035 mm
A1_Fx-121+255_skew_repaired 45
LOUIS BERGER Document No.
800
1000
ULS Capacity check
Section Sec 1 Sec 2
MED (T-M) 58 0.1
b (mm) 1000 1000
D (mm) 800 800
d (mm) 715 717
φ1 (mm) 20 16
s1 (mm) 125 125
φ2 (mm) 0 0
s2 (mm) 150 150
Ast (mm2) 2513 1608
Xumax (mm) 317 318
Xu (mm) Xu = (0.87*fyk*Ast)/(0.36*fck) 95 61
Check 1 OK OK
Astcal (mm2) Astcal =M/0.87*fyk*(d'-0.416 Xu) 1806 2
Check 2 OK OK
Ast min As per cl 16.5.1.1 IRC-112 937 939
Check 3 Ok Ok
ΔFd (T) 12.21 0.00
MED/Z + ΔFd 98.6 0.1
MRD (T-M) MRD = 0.87*fyk*Ast*(d-0.416 Xu) 81.21 53.23
Check 4 OK OK
MRD/Z 120 77
Check 5 Ok Ok 0.82011
Distribution reinforcement 0.2*Ast = 502.7
Provided distibution reinforcement
12 φ 100 C/C 1131.0 mm2
Ok
Secondary transverse reinforcement 503 mm2
Provided distibution reinforcement
12 φ 100 C/C 1131 mm2
Ok
A1_Fx-121+255_skew_repaired 46
LOUIS BERGER Document No.
A1_Fx-121+255_skew_repaired 47
LOUIS BERGER Document No.
A1_Fx-121+255_skew_repaired 48
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
13 Design of Pile Foundation
13.1 Design of Pile Foundation - Base Pressure
No. of piles = 10 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
4.8
Minimum Thickness of
Pile cap = 1.80 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.631, 8.71
Pile diameter = 1.20 m 1.631, 7.18
Area of pile = 1.131 m2
-1.631, 4.73 MT
16 1.631, 3.21
3
Unit Weight of R.C.C = 2.5 t/m B B
-1.631, 0.76
Self weight of Pile cap = 378 t
1.631, -0.76
Total Length L1+Lf = 9 m
Length of pile = 17.0 m -1.631, -
Reduction factor for pile B.M= 0.86 (IS 2911 part 1, sec iv, fig 5) 3.21 1.631, -4.73
-1.631, -
Loads on Pile 7.18 1.631, -8.71
Normal Seismic A
Maximum Pile Load = 157 t. OK 216 OK Max. horizontal load on pile = 30.45 T OK
A1_Fx-121+255_skew 49
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Calculation of loads on piles for each load combination
Comb 1
1
1196 23 538 303 0 120 33 1 153 86 30 112
L
W 2
L 1157 413 526 300 0 116 32 9 157 74 30 111
H 3
F 1029 23 480 305 0 103 29 1 133 73 30 112
L
4
991 413 468 301 0 99 29 9 137 61 30 111
SD-LWL 5
715 0 152 196 0 72 9 0 80.85 62 20 72
SD-HFL 6
549 0 92 195 0 55 6 0 60.50 49 20 72
A1_Fx-121+255_skew 50
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Seismic
7
1035 223 1748 729 62 104 107 5 216 -9 73 269
LWL - L
8
1028 297 1746 728 62 103 107 7 216 -11 73 269
9 1035 731 1120 518 208 104 69 16 189 19 56 205
LWL - T
10 1028 799 1117 517 206 103 69 18 189 16 56 205
11 931 223 1108 518 62 93 68 5 166 20 52 192
LWL - V
12 924 297 1106 517 62 92 68 7 167 18 52 192
13 869 223 1755 803 62 87 108 5 199 -26 81 297
HFL - L
14 861 297 1752 803 62 86 107 7 200 -28 81 296
15 869 731 1126 592 208 87 69 16 172.28 1 63 231
HFL - T
16 861 799 1124 592 206 86 69 18 172.90 -1 63 231
17 764 223 1114 592 62 76 68 5 149.70 3 60 219
HFL - V
18
758 297 1112 592 62 76 68 7 150.58 1 59 219
SD-LWL-L 19
688 65 637 443 37 69 39 1 109.38 28 44 164
SD-LWL-T 20 688 217 473 349 124 69 29 5 102.72 35 37 136
SD-LWL-V 21 626 65 461 349 37 63 28 1 92.29 33 35 129
SD-HFL-L 22 522 65 639 501 37 52 39 1 92.83 12 50 185
SD-HFL-T 23 522 217 475 406 124 52 29 5 86.17 18 43 157
SD-HFL-V 24 459 65 463 406 37 46 28 1 75.74 16 41 150
A1_Fx-121+255_skew 51
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
No. of piles = 10 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
4.8
Minimum Thickness of
Pile cap = 1.80 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.631,
Pile diameter = 1.20 m 8.705 1.631, 7.18
Area of pile = 1.131 m2
-1.631,
16.0 MT
4.732 1.631, 3.21
A1_Fx-121+255_skew 52
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Calculation of loads on piles for each load combination
Comb 1
L
1 1607 35 796 434 0 161 49 1 210 111 43 158
W
L 2 1582 619 777 429 0 158 48 14 220 97 43 156
H 3 1603 35 704 435 0 160 43 1 204 116 43 158
F
L 4 1545 619 685 430 0 154 42 14 210 99 43 157
SD-LWL 5 966 0 287 294 0 97 18 0 114.19 79 29 107
SD-HFL 6 928 0 193 293 0 93 12 0 104.70 81 29 107
A1_Fx-121+255_skew 53
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Comb 2
L
1 1206 30 746 373 0 121 46 1 167 74 37 136
W
L 2 1180 537 730 369 0 118 45 12 175 61 37 134
H 3 1197 30 665 374 0 120 41 1 161 78 37 136
F
L 4 1147 537 648 370 0 115 40 12 166 63 37 135
SD-LWL 5 715 0 316 255 0 72 19 0 90.93 52 25 93
SD-HFL 6 682 0 232 254 0 68 14 0 82.41 54 25 92
Seismic
A1_Fx-121+255_skew 54
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Note:
1 The Load combination presented above is calculated in accordance with Table 3.4 of notification No. 78-Amendment to IRC 6:2017 with unfactored loads. For load
combination no. 7 - 24 (Seismic Loads combination) is taken as 1.35 times the force transmitted to it by substrucure as per clause 219.8 of IRC 6:2017.
For Deflection calculation,as per Clause No:709.3.5.2 of Amendment to IRC:78-2014, Combination -I is only considered for checking of deflections and not
2
considered in other load combinations.
3 For load combination no. 7 - 24 (Seismic Loads combination) pile capacity is increased by 35% .
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Lf = = 740.12 cm
= 7.402 m
3
= Q * (L1 + Lf) / (12[pile
Y * E head
* I) deflection of equivalent cantilever for fixed head pile]
= 0.70 cm
7.0 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
A1_Fx-121+255_skew 55
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
13 14 Design of Pile Foundation
1 14.0 Design of Pile Foundation - SLS COMBINATIONS
No. of piles = 10 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
6.3
Minimum Thickness of
Pile cap = 1.80 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.631,
Pile diameter = 1.20 m 8.705 1.631, 7.18
Area of pile = 1.131 m2
-1.631,
6.3 MT
4.732 1.631, 3.21
Unit Weight of R.C.C = 2.5 t/m3 B -1.631, 0.76 B
Self weight of Pile cap = 378 t 0, 0
1.631, -0.76
Total Length L1+Lf = 9 m
Length of pile = 17.0 m -1.631, -
Reduction factor for pile B.M= 0.85 (IS 2911 part 1, sec iv, fig 5) 3.211 1.631, -4.73
-1.631, -
7.18 1.631, -8.71
Loads on Pile
Normal A
Maximum Pile Load = 154 t. Max. horizontal load on pile = 29.00 T
Minimum Pile Load = 62 t. .
A1_Fx-121+255_skew
56
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Rare
1
1172 23 491 289 0 117 30 1 148 87 29 105
L
W 2
L 1158 413 479 286 0 116 29 9 154 77 29 104
R
a H 3
F 1163 23 432 290 0 116 26 1 143 89 29 106
r
L
e 4
1124 413 419 287 0 112 26 9 147 77 29 104
SD-LWL 5
715 0 152 196 0 72 9 0 80.85 62 20 71
SD-HFL 6
682 0 91 195 0 68 6 0 73.74 63 20 71
QP
1
Q 1036 0 156 196 0 104 10 0 113 94 20 71
L
u
W
a 2
L 1060 0 156 196 0 106 10 0 116 96 20 71
s
i 3
H
1026 0 95 195 0 103 6 0 108 97 20 71
F
_
L 4
P 1026 0 95 195 0 103 6 0 108 97 20 71
e
r SD-LWL 5
m 715 0 152 196 0 72 9 0 80.85 62 20 71
a
SD-HFL 6
n 682 0 91 195 0 68 6 0 73.74 63 20 71
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
57
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
E = Youngs Modulus of the concrete in kg/cm2 = 321100 kg/cm2
I = Moment of Inertia of the pile cross section in cm=4 1.02E+07 cm4
K1 = Modulus of subgrade reaction as per Table 1 = 0.475 kg/cm3
Q = Resultant horizontal force on pile - NORMAL = 29.0 t
= Resultant horizontal force on pile - SEISMIC = 19.6 t
= 0.46 cm
4.6 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
A1_Fx-121+255_skew
58
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Designed By: Checked By: Date
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Design of aAutment A1 (Fix) - MNB at Ch:121+255 Vishal S.Chatterjee 14-12-2018
Sno Case P ML MT HL HT
1 -1112 1579 0 434 0
2 -968 1562 0 429 0
3 -1163 1583 0 435 0
4 -986 1566 0 430 0
5 -790 1070 0 294 0
6 -810 1066 0 293 0
7 -742 1358 0 373 0
8 -613 1343 0 369 0
9 -783 1361 0 374 0
10 -629 1347 0 370 0
11 -521 927 0 255 0
12 -539 924 0 254 0
13 -237 2912 0 800 0
14 -215 2909 0 800 0
15 -584 2307 0 634 0
ULS
16 -566 2297 0 631 0
17 -669 1784 0 490 0
18 -648 1781 0 489 0
19 -195 3132 0 861 0
20 -174 3129 0 860 0
21 -543 2477 0 681 0
22 -524 2468 0 678 0
23 -627 2000 0 550 0
24 -607 1997 0 549 0
25 -660 1495 0 411 0
26 -701 1315 0 361 0
27 -694 1240 0 341 0
28 -619 1705 0 468 0
29 -660 1514 0 416 0
30 -653 1449 0 398 0
A1_Fx-121+255_skew 59
FAGUS:
Section properties
Reinforcement Details
A1_Fx-121+255_skew 60
Results:
UR
Moment Capacity 0.92 ok
Shear 0.86 ok
A1_Fx-121+255_skew 61
Design forces for Pile - SLS Case
Rare combination
Sno Case P ML MT HL HT
1 -866 1053 0 289 0
2 -772 1042 0 286 0
3 -893 1056 0 290 0
Rare
4 -775 1045 0 287 0
5 -622 714 0 196 0
6 -626 711 0 195 0
Stress
Concrete 7.1 Mpa ok
Steel 113 Mpa ok
A1_Fx-121+255_skew 62
Design forces for Pile - SLS Case
Quasi Permanent combination
Sno Case P ML MT HL HT
1 -940 714 0 196 0
2 -964 714 0 196 0
3 -968 711 0 195 0
QP
4 -968 711 0 195 0
5 -622 714 0 196 0
6 -626 711 0 195 0
A1_Fx-121+255_skew 63
LOUIS BERGER Document No.
In the design of dirtwall the total height cosidered has been calculated taking into account a
slope of 2.5% provided in the carriageway.
0.30 Ka = 0.279
3.030 g = 1.80 t/m3
2 1
Eq. Height of surcharge = 1.2 m
1.522 t/m2 0.603 t/m2
2
1 Earth Pressure due to surcharge = 0.603 t/m
2
2 Earth Pressure due to backfill of earth Rare = 1.522 t/m
ULS factor for earth pressure 1.5 SLS factor for earth pressure 1.3
ULS factor for live load surcharge 1.2 SLS factor for live load surcharge 1.0
ULS factor for live load 1.5 SLS factor for live load 1.3
QP
SLS factor for earth pressure 1
SLS factor for live load surcharge 0.8
SLS factor for live load 0
Bending moment at the base of dirtwall due to surcharge (1) = 2.77 t-m/m
Bending moment at the base of dirtwall due to earth pressure (2) = 2.93 t-m/m
1.7
10.0t 10.0t
3.03 2.79m
A1_Fx-121+255_skew 64
LOUIS BERGER Document No.
300
1000
ULS Capacity check
Section
MED (T-M) 10.14
b (mm) 1000
D (mm) 300
d (mm) 242
φ (mm) 16
s (mm) 125
Ast (mm2) 1608
Xumax (mm) 107
Xu (mm) Xu = (0.87*fyk*Ast)/(0.36*fck*b) 61
Check 1 OK
Astcal (mm2) Astcal =M/0.87*fyk*(d'-0.416 Xu) 978
Check 2 OK
Ast min As per cl 16.5.1.1 IRC-112 317
Check 3 Ok
ΔFd (T) 3.2
MED/Z + ΔFd 50.0
Check 4 OK
MRD/Z 77
Check 5 Ok
Distribution reinforcement 0.2*Ast = 321.7
Provided distibution reinforcement
2
10 φ 200 C/C 393 mm
Ok
2
Secondary transverse reinforcement 322 mm
Provided distibution reinforcement
2
10 φ 200 C/C 393 mm
Ok
A1_Fx-121+255_skew 65
LOUIS BERGER Document No.
ΔFd (T) =
Check 6 Ok ΔFd (T) 0.5*Ved*cotθ 3.2
SLS Stress check
sec 1 Section 1
Load comb Rare QP Creep coefficient φ 1.5
MED (T-M) 8.67 5.15 Mst = Mrare-MQP 4
b (mm) 1000 1000 Eceff =Ecm*(Mrare)/Mst+(1+φ)*MQP 17095
D (mm) 300 300 mqp = Es/ Ecm 6.2
d (mm) 242 242 mrare =Es/Eceff 11.7
φ (mm) 16 16
s (mm) 125 125
Ast (mm2) 1608 1608 h k
m 12 6 0 1
N. A.(x) 78 60 0.3 1
INA 6.64E+08 4.02E+08 0.8 0.65
Comp stress 10.24 7.71 3 0.65
Comp Perm. 16.80 12.60
Check 1 OK Ok
Tensile stress 250 144
Tensile Perm. 330 330
Check 2 OK Ok
A1_Fx-121+255_skew 66
LOUIS BERGER Document No.
A1_Fx-121+255_skew 67
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM Job No 4800197 4800197-GGN-DD-033
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state
of West Bengal Designed by: Checked by Date
STRUCTURE: Design of abutment cap Vishal S.Chatterjee 14-12-2018
16.0 Design of Abutment Cap
The center line of the support lies within the abument wall width
Bearing pressure under the bearing is checked for satisfying the cube root formula :-
2
fcd = 15.61 N/mm for M35 grade,
2
Transferred bearing area 1102500 mm 1182.426
Therefore abutment cap has been designed as per Clause 716.2.1 , IRC :78- 2014
2 2
Total Area of steel required (mm ) = 0.25 % in one direction 1283.9 mm
Steel provided at each face i.e top face and bottom face 12 nos. 12 dia
O.K.
2 2
Area of steel required (mm )/m @ 0.25% 562.5 mm /m
2
Provided 10 dia 6 leg stirrups 250 c/c 1885 mm
O.K.
A1_Fx-121+255_skew 68
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
17.0 DESIGN OF END RETURN WALL
1 Angle of Repose of Soil, f (in degrees) f= 30.0
2 Cohesion, C (in t/m2) C= 0.0
a = 5.600 3 Angle of Wall friction d= 20.0
gsub =
3
4 Density of Soil (submerged) , gsub (in t/m ) 1.00
5 Batter of wall with horizontal, a (in degrees) a= 90.00
6 Inclination of Backfill with horizontal, b (in degrees) b= 0.00
7 Equiv. Ht. of backfill earth for Live load surcharge (m) heb 1.2
For Coulomb's Theory Ka = 0.297
2 2 2
Ka = Sin (a+f)/ [Sin a sin (a-d) {1+ sqrt ((Sin(f+d).Sin (f-b))/(Sin (a-d).Sin(a+b)))} ]
For Rankine's Theory Ka = 0.333
'
Ka =
b = 5.700
8 Active Earth pressure Coefficient 0.297
ka = 0.279 KaH = 0.279
g = 1.80 KaV = 0.102
ULS factor for earth pressure 1.5 SLS factor for earth pressure 1
ULS factor for live load surcharge 1.2 SLS factor for live load surcharge 0.8
Grade of Concrete M 35 QP
Grade of steel 550 SLS factor for earth pressure 1
SLS factor for live load surcharge 0
Q2=ka*g*h
Q1=ka*g*SHt
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
1 5.7 5.60 0.98 0.603 1.732 1.728 1.179 1.158 -5.65 -5.64
A1_Fx-121+255_skew 69
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Ast provided (vertical) = 3141.59 mm2 Ast provided (horizontal) = 2010.62 mm2 1130.97 mm2
CHECK FOR SHEAR
A1_Fx-121+255_skew 70
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Check for Check for shear Check for maximum shear capacity
Check for shear maximum Load Comb 0.6H Load Comb At 0.6H
Load Comb Load Comb At base VED 9.04 VED 9.0
VED 16.79 VED 16.79 β 1 b 1000
β 1 b 1000 βVED 9.04 deff 315
βVED 16.79 deff 315 deff 315 z 283.5
deff 315 z 283.5 b 1000 αcw 1
b 1000 αcw 1 k 1.80 ν1 0.53
VRDmax
=αcw*b*z*v1
k k=min(1+sqrt(200/d),2) 1.80 ν1 0.53 ρ 0.0064 VRDmax *fcd/2 118
VRDmax
ρ=min((Ast/b/deff),0.02) =αcw*b*z*v1*f
ρ 0.0100 VRDmax cd/2 118 νmin 0.442 Check 7 Ok
νmin νmin=0.031k^(3/2)*fck 0.442 Check 7 Ok σcp 0 θactual 2.20
σcp 0 θactual 4.10 VRDC 17.59 θadopted 45
VRDC=(max(((0.12*k*(80*ρ
*fck)^0.33) + ΔFd (T) =
VRDC 0.15*σcp),(vmin+0.15*σcp) 20.38 θadopted 45 Check OK ΔFd (T) 0.5*Ved*cotθ 4.52
ΔFd (T) =
Check OK ΔFd (T) 0.5*Ved*cotθ 8.395
Shear R/f not required
Dia of shear r/f 10
Spacing 250 SLS Moment of return wall
No of legs 8 At bottom section At 0.6H section
fywd 400 SLS rare moment in SLS Qp Moment in SLS rare moment in SLS Qp Moment in
VRds 29 vertical dir. (Mu) tm vertical direction horizontal dir. (Mu) tm horizontal direction(Mh)
VRd 29
Check OK 15.1 10.6 10.5 6.0
A1_Fx-121+255_skew 71
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Creep coefficient φ 1 1
SLS Stress check Bottom section Horizontal Cover 75.00mm Mst = Mrare-MQP 5 5
Load comb Rare QP Rare QP ES 200000 Eceff =Ecm*(Mrare)/Mst+(1+φ)*MQP 18994 20556
MED (T-M) 15 11 11 6 Fcm M 45 mqp = Es/ Ecm 6.2 6.2
b (mm) 1000 1000 1000 1000 Ecm 32308 mrare =Es/Eceff 10.5 9.73
D (mm) 400 400 400 400
d (mm) 315 315 317 317
φ (mm) 20 20 16 16
s (mm) 100 100 100 100
Ast (mm2) 3142 3142 2011 2011
m 11 6 10 6
N. A.(x) 115 93 94 77
INA 1.83E+09 1.23E+09 1.25E+09 8.69E+08
Comp stress 9.50 8.03 7.88 5.35
Comp Perm. 16.80 12.60 16.80 12.60
Check 1 Ok Ok Ok Ok h k
Tensile stress 174 119 183 103 0 1
Tensile Perm. 300 300 300 300 0.3 1
Check 2 Ok Ok Ok Ok 0.8 0.65
3 0.65
Crack Width Check
For minimum Ast requirement for crak control
Load comb Base 0.6H
b 1000 1000
h 400 400
d 315 317
Acteff =min(h/2,(h-N.A) /3,
Acteff 2.5*(h-d))*b 102354.5 107582.4 From Table 12.2 IRC112
σst 160 160
fcteff 2.9 2.9 cl 12.3.3 IRC-112
k 0.65 0.65 Eq 12.2 IRC-112
kc 0.4 0.4
As, min As,min=k*kc*fcteff/σst 482 507
As provided 3142 2011
Check Ok Ok
A1_Fx-121+255_skew 72
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Srequired 200
Check for crack width Check Ok
Load comb
heff=min(2.5(h-d),(h- Check for maximum spacing
heff x/3),h/2) 102.354 107.582 b/w bars
b 1000 1000 Load comb
Aceff Aceff = heff*b 102354 107582 φ 20
Asprovided 3142 2011 C 75
ρpeff ρpeff =As/Aceff 0.031 0.019 Sprovided 100
k1 0.800 0.800
k2 0.500 0.500
Srmax Srmax=3.4c+0.17Φ/ρpeff 365.8 400.5
σsc 119 103
N.A 93 77
kt 0.5 0.5
αe 6 6
εm =max(((σsc-
εm (kt*(fcteff/ρpeff)*(1+αe*ρ 0.00036 0.00031
Wk 0.130 0.124
Check Ok Ok
A1_Fx-121+255_skew 73
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal
A2_Fr-121+255_skew 74
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197
DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Designed By: Checked By: Date
Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at
Vishal S.Chatterjee 17-12-2018
Ch:121+255
1. General
This design note pertains to the design of abutment . Superstructure consists of
precast PSC girder,supported on POT PTFE bearing.
The substructure consists of RCC wall type abutment on open foundation.
1 IRC : 6 2017
3 IRC : 78 2014
3. Loads
1 Dead load (Due to self weight of superstructure, substructure, foundation and backfill weight)
2 Superimposed Dead Load (SIDL) excluding wearing course due to crash barrier, footpath and railing
(if present)
3 Superimposed Dead Load (SIDL) due to wearing course
4 Carriageway live load Future widening keeping in mind
Max P case
Max Mt case
5 Footpath Live Load (FPLL) (if footpath is present)
6 Earth pressure due to backfill
7 Buoyancy in HFL case
Wind load is not considered as it is not governing
A2_Fr-121+255_skew 75
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197
DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Designed By: Checked By: Date
Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at
Vishal S.Chatterjee 17-12-2018
Ch:121+255
5. Design Philosophy
Design is done using limit state method
ULS and SLS strengths of abutment section is checked using Fagus software
Basic combination is used for checking ULS strength. Rare combination is used for checking
stress. Quasi-permanent combination is used for checking crack width.
A2_Fr-121+255_skew 76
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
A2_Fr-121+255_skew 77
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
A2_Fr-121+255_skew 78
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
For Piles
no. of piles 10
3.06
61.096m Bearing Lvl
CTL
2.28 0.85 60.746m
0.00
0.80
1.18 0.3
GL 59.500m
Distance between bearing c/l and mid of shaft sec at bottom in long. dirn. = 0.01 m
C/l of bearing is to the right of c/l of shaft
Eccentricity Shaft c/l to fdn c/l = 0.00906308 m
1.7 Partial Safety Factors
Partial safety factor for relevant loads are presented here
(As per Annex B of IRC:6-2017)
For Loads
Ultimate Limit State (For Verification of Equilibrium) (Table 3.1, Annex B, IRC:6-2017)
Basic Comb Seismic Comb
Load Overturnin Overturning or
Resisting Resisting
g or Sliding Sliding
A2_Fr-121+255_skew 79
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
- - 0.75 -
Seismic Effect (During construction)
A2_Fr-121+255_skew 80
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
For Loads Unfactored load combinatins for verification of equilibrium as per IRC:78-2014
(For Verification of Equilibrium)
Basic Comb Seismic Comb
Load Overturnin Overturning or
Resisting Resisting
g or Sliding Sliding
Dead Load 1 1 1.00 1.0
SIDL (except surfacing) 1 1 1.00 1.0
SIDL (surfacing) 1 1 1.00 1.0
Live load and associated loads
1 0 - -
(Leading)
Live load and associated loads
1 0 1 0
(Accompanying)
Water Current - 0 1.0 -
Buoyancy 1.0 - 1.0 -
Earth Pressure 1 - 1.0 -
Live Load Surcharge 1 0 1 -
Thermal Load (Leading) 1 0 1 -
Thermal Load (Accompanying) 1 0 1 -
Seismic Effect (During service) - - 1.0 -
- - 1 -
Seismic Effect (During construction)
A2_Fr-121+255_skew 81
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
1.5 1 1.35 1 1
Backfill (adding effect)
1.35 1 1.35 1 1
Backfill (relieving effect)
Water Current 1 1 1 0 1
- - 0.75 0 0
Seismic Effect (During construction)
Unfactored Loads as per Cl. 706.1 of IRC:78-2014 has been considered for base pressure check
For Materials
Basic Seismic
Material
Comb Comb
Concrete 1.5 1.5
Reinforcing steel 1.15 1.15
SIDL
Excluding wearing course
Self weight of crash barrier = 1.0 t/m
Self weight of railing = 0 t/m
Transverse eccentricity of crash barrier (with footpath case) = 0.00 m
Transverse eccentricity of crash barrier (without footpath case) = 0.00 m
Transverse eccentricity of railing = 0.00 m
Total weight of footpath/services 0.00 t
Transverse eccentricity of footpath/services = 0.00 m
A2_Fr-121+255_skew 82
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
Designed By: Checked By: Date
West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Temperature variation = 30 oC
Factor by which seismic force is increased for design of foundation in long = 1.35 (Cl.219.8, IRC 6 2017)
Factor by which seismic force is increased for design of foundation in Trans = 1
1.12 Sign Convention
Resisting moment (about toe) Positive
Overturning moment (about toe) Negative
A2_Fr-121+255_skew 83
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 033
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
2 Load Calculation from Superstructure
A2_Fr-121+255_skew 84
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 033
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
2.3 SIDL (wearing course)
With Footpath Case
Load intensity due to wearing course = 2.2 t/m3
DL of wearing course = 80.19 t
Total reaction on abutment (SIDL excluding w/c) = 40.095 t
A2_Fr-121+255_skew 85
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 033
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
A2_Fr-121+255_skew 86
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
= 3.20E+06 t/m^2
d2 = FL3/3EI = 0.0013 mm
A2_Fr-121+255_skew
87
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-
Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Transverse direction:
Z = Zone factor = 0.36
A2_Fr-121+255_skew
88
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from 033
KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
4.0 Calculation of Earth Pressure Co-efficient & Dynamic increament : (As per IRC-6:2017)
LWL Case:
Input : gsat = 2.0 t/m3
3
Density of Earth g dry = 1.8 t/m
gsub = 1.0 t/m3
Angle of internal friction of soil f = 30 deg = 0.524 radians
Angle of friction between wall and earthfill d = 20 deg = 0.349 radians
Angle which earth face makes with the vrtical a = 0 deg = 0.000 radians
Slope of earthfill b = 0 deg = 0 radians
Live Load surcharge = 1.20 m
Horizontal Seismic Coefficient ah = 0.18
Vertical seismic coefficient av = 0.12
Slope of earthfill i = 0 deg = 0 radians
Angle of earthface of wall with vertical a' = 0 deg = 0 radians
Width of abutment in dir. normal to traffic direction = 16.0 m
Skew angle = 25 deg = 0.436 radians
F1
F2 4.810 6.610 m
Ka = cos2(f-a) = 0.297
cos2a*cos(d+a)*[1+sqrt(sin(f+d)*sin(f-b)/cos(a-b)*cos(d+a)]2
Kp = cos2(f+a) = 6.105
cos a*cos(d-a)*[1-sqrt(sin(f+d)*sin(f+b)/cos(a-b)*cos(d-a)]
2 2
Calculation of forces and moments at Bottom of foundation due to live load surcharge and
earth pressure
Foundation Bottom:
Sno. Item Pressure Width Height Force Fl Lever arm Ml Fv
2
(t/m ) (m) (m) (T) (T) (m) (Tm) (T)
1 F1 0.603 17.65 6.610 70.371 70.371 3.305 232.592 0.5H
2 F2 3.320 17.65 6.610 193.724 193.724 2.776 537.853 0.42H 70.824
A2_Fr-121+255_skew
89
Calculation of active earth pressure for dynamic increment
F1 6.610 m
F2 4.810
Abutment Base:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 4.810 51.209 51.209 2.405 123.169 H/2 0.000
2 F2 2.416 17.654 4.810 102.588 102.588 1.587 162.853 H/3 37.505
Dynamic increamnet component
1 F1 0.346 17.654 4.810 29.384 29.384 3.175 93.294 0.66H 0.000
2 F2 1.385 17.654 4.810 58.810 58.810 2.405 141.438 H/2 21.319
Foundation Bottom:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 6.610 70.371 70.371 3.305 232.592 H/2 0.000
2 F2 3.320 17.654 6.610 193.724 193.724 2.181 422.599 H/3 70.824
Dynamic increamnet component
1 F1 0.346 17.654 6.610 40.379 40.379 4.363 176.174 0.66H 0.000
2 F2 1.904 17.654 6.610 111.100 111.100 3.305 367.186 H/2 40.274
A2_Fr-121+255_skew
90
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from
KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
5.0 Calculation of Earth Pressure Co-efficient & Dynamic increament : (As per IRC-6:2017))
HFL Case:
F1
F3 4.810 6.610 m
p3 p1 59.350 (HFL)
p4 p2
F2 0.350 2.150
F4
59.000 (Top of heel)
F5
p4 1.800 57.200 (Bottom of Foundation)/LWL
p5 p2
Ka = cos2(f-a) = 0.308
cos2a*cos(d+a)*[1+sqrt(sin(f+d)*sin(f-b)/cos(a-b)*cos(d+a)]2
Above HFL
Horizontal coefficient Kh=Kacos d = 0.303 0.279
Vertical coefficient Kv=Kasin d = 0.053 0.102
Calculation of forces and moments at Bottom of foundation due to live load surcharge and
earth pressure
Foundation Bottom:
Sno. Item Pressure Width Height Force Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
1 F1 0.603 17.65 4.460 47.483 47.483 4.380 207.986 0.5H 0.000
2 F2 0.654 17.65 2.150 24.823 24.823 1.075 26.685 0.5H 0.000
3 F3 2.240 17.65 4.460 88.194 88.194 4.023 354.839 0.42H 32.243
4 F4 2.433 17.65 2.150 92.347 92.347 1.075 99.273 0.5H 33.761
5 F5 0.651 17.65 2.150 12.355 12.355 0.710 8.766 0.33H 2.161
A2_Fr-121+255_skew
91
Calculation of earth pressure for seismic case
63.810 (Top of deck slab)
p1
F3
F1 6.610 m
p3 4.810 59.350 (HFL)
p4 F2 p2
F4
59.000 (Top of heel)
F5
p4 57.200 (Bottom of foundation)
p5 p2
Abutment Base:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 4.460 47.483 47.483 2.580 122.517 H/2 0.000
2 F2 0.654 17.654 0.350 4.041 4.041 0.175 0.707 0.5H 0.000
3 F3 2.240 17.654 4.460 88.194 88.194 1.822 160.685 H/3 32.243
4 F4 2.433 17.654 0.350 15.033 15.033 0.175 2.631 0.5H 5.496
5 F5 0.106 17.654 0.350 0.327 0.327 0.116 0.038 0.33H 0.057
Foundation Bottom:
Sno. Item Pressure Width Height Force F Fl Lever arm Ml Fv
(t/m2) (m) (m) (T) (T) (m) (Tm) (T)
Static component
1 F1 0.603 17.654 4.460 47.483 47.483 4.380 207.986 H/2 0.000
2 F2 0.654 17.654 2.150 24.823 24.823 1.075 26.685 0.5H 0.000
3 F3 2.240 17.654 4.460 88.194 88.194 3.622 319.434 H/3 32.243
4 F4 2.433 17.654 2.150 92.347 92.347 1.075 99.273 0.5H 33.761
5 F5 0.651 17.654 2.150 12.355 12.355 0.710 8.766 0.33H 2.161
A2_Fr-121+255_skew
92
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197 DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Designed By: Checked By: Date
state of West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - Vishal S.Chatterjee 17-12-2018
Live Load
Max Reaction Case i/c Lane deduction factor/congetion factor Without Impact
P = 136 t eL 0.782
ML = 126 t-m
MT = 22.8 t-m
HT = 0
Max MT Case
P = 98.4 t eL 0.924796748
ML = 91 t-m
MT = 413
HT = 0
Normal Case
Fh-u(Rq+Rg) -23.9948 t
Long force 24.0 t
Fh/2+u(Rq+Rg) 23.99475 t
A2_Fr-121+255_skew 93
Document
LOUIS BERGER No.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Job No. 4800197 DD-033
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the Designed By: Checked By: Date
state of West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - Vishal S.Chatterjee 17-12-2018
Seismic Case
u (Rq) 1.36 t
Fh 0t
Trans Seismic Long Seismic
u(Rq+Rg) = 18.55475 t
Fh-u(Rq+Rg) -18.5548 t
Fh/2+u(Rq+Rg) 18.55475 t
Normal Case
Fh-u(Rq+Rg) -22.1148 t
Long force 22.11475 t
Fh/2+u(Rq+Rg) 22.1148 t
Seismic Case
u (Rq) 0.984 t
Fh 0t Remember to remove lane deduction from here
Trans Seismic Long Seismic
u(Rq+Rg) = 18.17875 t
Fh-u(Rq+Rg) -18.1788 t
Fh/2+u(Rq+Rg) 18.1788 t
A2_Fr-121+255_skew 94
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
STRUCTURE: Design of abutment & foundation for A2 (Free) -
Vishal S.Chatterjee 17-12-2018
MNB at Ch:121+255
3 Max MT case
Live Load Reaction on abutment = 19.68 t Max MT Case Reaction
A2_Fr-121+255_skew 95
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
STRUCTURE: Design of abutment & foundation for A2 (Free) -
Vishal S.Chatterjee 17-12-2018
MNB at Ch:121+255
4 Max Rxn case
Live Load Reaction on abutment = 27.20 t Max P Case Reaction
Longitudinal Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
3 lane Class A 13.09 -13.09 0.12 52.14 0.00 24.51 Max MT
1 lane 70R-W + 1 lane Class A 13.36 -13.36 0.12 54.12 0.00 25.01 Max P
Transverse Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
3 lane Class A 13.09 -13.09 0.12 173.79 0.00 81.69 Max MT
1 lane 70R-W + 1 lane Class A 13.36 -13.36 0.12 180.40 0.00 83.38 Max P
Vertical Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
3 lane Class A 43.63 -43.63 0.40 52.14 0.00 24.51 Max MT
1 lane 70R-W + 1 lane Class A 44.53 -44.53 0.40 54.12 0.00 25.01 Max P
A2_Fr-121+255_skew 96
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
STRUCTURE: Design of abutment & foundation for A2 (Free) -
Vishal S.Chatterjee 17-12-2018
MNB at Ch:121+255
Transverse Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 13.36 -13.36 0.12 180.40 0.00 83.38
SL2 13.09 -13.09 0.12 173.79 0.00 81.69
Vertical Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 44.53 -44.53 0.40 54.12 0.00 25.01
SL2 43.63 -43.63 0.40 52.14 0.00 24.51
Transverse Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 13.36 -13.36 0.1 355.1 0.00 83.38
SL2 13.09 -13.09 0.1 345.0 0.00 81.69
Vertical Seismic
Pmax Pmin ML MT HL Seismic HT Seismic
Load Case
t t t-m t-m t t
SL1 44.53 -44.53 0.4 106.5 0.00 25.01
SL2 43.63 -43.63 0.4 103.5 0.00 24.51
A2_Fr-121+255_skew 97
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197 033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
Designed By: Checked By: Date
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the
STRUCTURE: Design of abutment & foundation for A2 (Free) -
Vishal S.Chatterjee 17-12-2018
MNB at Ch:121+255
Transverse Seismic
ML due ML due
ML (about
to HL to P MT (about HL HT
Pmax Pmin footing c/l)
Load Case (about (about footing c/l) Seismic Seismic
due to HL
toe) toe)
t t t-m t-m t-m t t t
SL1 13.36 -13.36 0.0 -31.7 505.2 0.0 0.00 83.38
SL2 13.09 -13.09 0.0 -31.0 495.0 0.0 0.00 81.69
Vertical Seismic
ML due ML due
to HL to P MT (about ML (about HL HT
Pmax Pmin
Load Case (about (about footing c/l) footing c/l) Seismic Seismic
toe) toe)
t t t-m t-m t-m t t t
SL1 44.53 -44.53 0.0 -105.6 151.6 0.0 0.00 25.01
SL2 43.63 -43.63 0.0 -103.5 148.5 0.0 0.00 24.51
A2_Fr-121+255_skew 98
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Designed By: Checked By: Date
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Vishal S.Chatterjee 17-12-2018
SUMMARY:
Earth Pressure: Live Load Surcharge:
A2_Fr-121+255_skew 103
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
0.3 1.29
0.4 3.06
c 0.80 0.00
1.18
a HFL
0.90
0.35
0.80
0.00 d
0.00 1.80
1.80
1.98 1.98
4.76
C.G. Cl of Fdn
Width of abutment b = 16.00 m Width of pilecap = 16.00 m
Return Wall is on 2 side b/cos q = 17.6540467 m b/cos q = 17.65 m
Horizontal distance of abutment shaft bottom from vertical face = 0.40 m
Horizontal distance of CG of abutment shaft from vertical face = 0.40 m
Normal Case
Moments about c/l of foundation
A2_Fr-121+255_skew
104
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
"e" fro mC/L
Horizontal Lever Arm Hor.Lever Arm ML about ML about ML about
Component Weight ML of
from shaft at bottom c/l from toe toe C/L C/L
foundation
t m t-m m t-m m t-m t-m
Standard Dirt Wall Bracket 5.96 1.561 9.3 3.94 23.5 -1.84 -11.0 0.0
Dirt Wall 40.58 1.428 57.9 3.81 154.6 -1.43 -57.9 0.0
Abutment Cap
94.00 0.439 41.3 2.82 265.1 -0.44 -41.3 0.0
(uniform)
Abutment Cap
0.00 0.000 0.0 2.82 0.0 -0.04 0.0 0.0
(varying)
Abutment Shaft 31.62 0.000 0.0 2.38 75.3 0.00 0.0 0.0
Total 172.2 108.5 518.5 -110.2 0.0
Seismic Case
Weight Full Design Seismic Forces
Component
t r1 r2 r3
Dirt Wall Bracket 6.0 1.1 1.3 0.7
Dirt Wall 40.6 7.3 9.1 4.9
Abutment Cap
94.0 16.9 21.1 11.3
(uniform)
Abutment Cap
0.0 0.0 0.0 0.0
(varying)
Abutment Shaft 31.6 5.7 7.1 3.8
Foundation 378.4 68.1 85.0 45.4
θ is skew angle Put % of Exposed pile cap where seismic force to be considered 1
A2_Fr-121+255_skew
105
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
Vert. Lever
Hor.Lever Arm from Arm from
ML due to HL (about toe) ML due to V (about toe) MT
toe foundation
bottom
m m t-m t-m t-m
3.94 6.4 6.8 0.8 2.6
3.81 5.1 37.1 5.6 13.9
2.82 3.1 52.8 9.5 19.8
2.38 2.7 0.0 0.0 0.0
2.38 2.2 12.8 2.7 4.8
109.5 18.7 41.0
Vert. Lever
Hor.Lever Arm from
Arm from ML due to HL ML due to V MT
bearing c/l
shaft bottom
m m t-m t-m t-m
3.94 6.4 2.1 0.8 8.5
3.81 5.1 11.1 5.6 46.3
2.82 3.1 15.8 9.5 65.9
2.38 2.7 0.0 0.0 0.0
2.38 2.2 3.8 2.7 16.0
32.9 18.7 136.7
A2_Fr-121+255_skew
106
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
Vert. Lever
Hor.Lever Arm from
Arm from ML due to HL ML due to V MT
bearing c/l
shaft bottom
m m t-m t-m t-m
3.94 6.4 2.1 2.8 2.6
3.81 5.1 11.1 18.5 13.9
2.82 3.1 15.8 31.8 19.8
2.82 2.7 0.0 0.0 0.0
2.38 2.2 3.8 9.0 4.8
32.9 62.2 41.0
Seismic Case
Longitudinal Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 172.2 172.2 108.5 0.0 0.0 0.0
Seismic Force on
6.2 -6.2 49.8 20.1 31.0 11.6
Substr.
A2_Fr-121+255_skew
107
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 172.2 172.2 108.5 0.0 0.0 0.0
Buoyancy -4.5 -4.5 0.0 0.0 0.0 0.0
Seismic Force on
6.2 -6.2 49.8 20.1 31.0 11.6
Substr.
Transverse Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 172.2 172.2 108.5 0.0 0.0 0.0
Seismic Force on
6.2 -6.2 12.2 67.1 29.7 38.7
Substr.
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 172.2 172.2 108.5 0.0 0.0 0.0
Buoyancy -4.5 -4.5 0.0 0.0 0.0 0.0
Seismic Force on
6.2 -6.2 12.2 67.1 29.7 38.7
Substr.
Vertical Seismic
LWL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 172.2 172.2 108.5 0.0 0.0 0.0
Seismic Force on
20.7 -20.7 3.1 20.1 9.3 11.6
Substr.
HFL
Pmax Pmin ML MT HL HT
Component
t t t-m t-m t t
Weight of Substr. 172.2 172.2 108.5 0.0 0.0 0.0
Buoyancy -4.5 -4.5 0.0 0.0 0.0 0.0
Seismic Force on
20.7 -20.7 3.1 20.1 9.3 11.6
Substr.
Trapezoidal Part
Volume = 0.0 m3
Weight = 0t
3
Total Volume of foundation = 151.3 m
Total Weight of foundation = 378.36 t
A2_Fr-121+255_skew
108
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
Calculation for Return Wall
ML about
Hor.Lever Arm from toe
Weight ML about toe e about c/l of C/L of
Portion in L-L dirn.
foundation foundation
t m t-m m t-m
a 8.5 4.36 37.2 -2.0 -16.9 -1.76717728
b 2.3 3.37 7.8 -1.0 -2.3
c 0.0 3.57 0.0 -1.2 0.0
d 0.0 4.10 0.0 -1.7 0.0
Total 10.9 45.0 -19.2
Submerged height of return wall in HFL case upto foundation top level = 0.35 m
Submerged volume of return wall = 0.61 m3
Buoyancy force on return wall = -0.61 t
Longitudinal moment due to buoyancy force on return wall about toe = -2.5 t-m
Transverse moment due to buoyancy about centerline of footing = -4.774549 t-m
Longitudinal moment due to buoyancy force on return wall about C/L of foundation = 1 t-m
A2_Fr-121+255_skew
109
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
LWL
ML about
Hor.Lever Arm from toe
Weight ML about toe e about c/l of C/L of
Portion in L-L dirn.
foundation foundation
t m t-m m t-m
a 116.7 4.36 508.8 -2.0 -231.0
b 31.8 3.37 107.3 -1.0 -31.5
c 0.00 3.57 0.0 -1.2 0.0
d 0.00 4.10 0.0 -1.7 0.0
Total 148.5 616.1 -262.5
HFL
ML about
Hor.Lever Arm from toe
Weight ML about toe e about c/l of C/L of
Portion in L-L dirn.
foundation foundation
t m t-m m t-m
a 112.0 4.36 488.2 -2.0 -221.6
b 26.3 3.37 88.7 -1.0 -26.0
c 0.00 3.57 0.0 -1.2 0.0
d 0.00 4.10 0.0 -1.7 0.0
Total 138.3 576.9 -247.7
Normal Case
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) Pmax Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 172.2 172.2 0.0 518.5 0.0 0.0 0.0 172.2 172.2 0 0 -110.2 0.0
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.36 378.36 0 0 0.0 0
Return Wall Wt. 10.9 10.9 0.0 45.0 84.7 0.0 0.0 10.9 10.9 0 0 -19.2 0
Backfill Wt. 148.5 148.5 0.0 616.1 0.0 0.0 0.0 148.5 148.5 0 0 -262.5 0
A2_Fr-121+255_skew
110
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
Seismic Case
Longitudinal Seismic
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) Pmax Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 172.2 172.2 0.0 518.5 0.0 0.0 0.0 172.2 172.2 0.0 0.0 -110.2 0.0
Seismic Force on
6.2 -6.2 -109.5 -18.7 41.0 31.0 11.6 19.8 -19.8 99.1 37.1 167 64
Substr.
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Return Wall Wt. 10.9 10.9 0.0 45.0 84.7 0.0 0.0 10.9 10.9 0.0 0.0 -19.2 0.0
Backfill Wt. 148.5 148.5 0.0 616.1 0.0 0.0 0.0 148.5 148.5 0.0 0.0 -262.5 0.0
Transverse Seismic
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) P Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 172.2 172.2 0.0 518.5 0.0 0.0 0.0 172.2 172.2 0.0 0.0 -110.2 0.0
Seismic Force on
6.2 -6.2 -32.9 -18.7 41.0 29.7 38.7
Substr. 19.8 -19.8 29.7 123.7 47 213
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Return Wall Wt. 10.9 10.9 0.0 45.0 84.7 0.0 0.0 10.9 10.9 0.0 0.0 -19.2 0.0
Backfill Wt. 148.5 148.5 0.0 616.1 0.0 0.0 0.0 148.5 148.5 0.0 0.0 -262.5 0.0
A2_Fr-121+255_skew
111
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM
113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterje 17-12-2018
HFL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) P Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 172.2 172.2 0.0 518.5 0.0 0.0 0.0 172.2 172.2 0.0 0.0 -110.2 0.0
Seismic Force on
6.2 -6.2 -32.9 -18.7 41.0 29.7 38.7
Substr. 19.8 -19.8 29.7 123.7 47.3 213.2
Buoyancy on substr. -4.5 -4.5 0.0 -10.67 0.0 0.0 0.0 -4.5 -4.5 0.0 0.0 0.0 0.0
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Buoyancy on fdn. -151.34 -151.34 0 -360.40 0 0 0 -151.3 -151.3 0.0 0.0 0.0 0.0
Return Wall Wt. 10.9 10.9 0.0 45.0 84.7 0.0 0.0 10.9 10.9 0.0 0.0 -19.2 0.0
Buoyancy on Return
-0.6 -0.6 0.0 -2.5 -4.8 0.0 0.0
wall. -0.6 -0.6 0.0 0.0 1.1 0.0
Backfill Wt. 148.5 148.5 0.0 616.1 0.0 0.0 0.0 138.3 138.3 0.0 0.0 -247.7 0.0
Vertical Seismic
LWL C/L of foundation
ML due to P
Pmax Pmin ML due to HL (about toe) MT HL HT
Component (about toe) P Pmin HL HT ML Mt
t t t-m t-m t-m t t t t t t t-m t-m
Weight of Substr. 172.2 172.2 0.0 518.5 0.0 0.0 0.0 172.2 172.2 0.0 0.0 -110.2 0.0
Seismic Force on
20.7 -20.7 -32.9 -62.2 41.0 9.3 11.6
Substr. 66.1 -66.1 29.7 37.1 38 64
Weight of fdn 378.4 378.4 0.0 901.0 0.0 0.0 0.0 378.4 378.4 0.0 0.0 0.0 0.0
Return Wall Wt. 10.9 10.9 0.0 45.0 84.7 0.0 0.0 10.9 10.9 0.0 0.0 -19.2 0.0
Backfill Wt. 148.5 148.5 0.0 616.1 0.0 0.0 0.0 148.5 148.5 0.0 0.0 -262.5 0.0
A2_Fr-121+255_skew
112
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D
from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
T-T
As'
ML
L-L
0.8
MT
As
17.65m sk
Provision of Reinforcement
T direction
2
Compression Face 176 No. 12 mm dia bar AsL' = 19905.1 mm
2
Tension Face 176 No. 16 mm dia bar AsL = 35386.9 mm
0 No. 20 mm
Spacing in Tansverse direction = 100 mm < 200.0 OK
L direction
2
Compression Face 5 No. 16 mm dia bar AsL' = 1005.3 mm
2
Tension Face 5 No. 16 mm dia bar AsL = 1005.3 mm
ULS and SLS strengths of abutment section is checked using AdSec 8.2 (FAGUS software).
The output summary is attached in Appendix 1.
Under ULS, moment capacity of the section is checked.
kN kN-m kN-m
1 Max P Case 0.0 342.0 8738.7
2 Min P Case 0.0 151.0 4457.5 2531.51925
3 Max ML Case 0.0 342.0 8738.7 2284.232523
4 Min ML Case 0.0 0.0 4446.2
A2_Fr-121+255_skew
113
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D
from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Summary of Critical Load Cases from Rare Combination
P ML MT
t t-m t-m
Max P Case 652.7 593.7 22.8
Summary of Critical Load Cases from Quasi-permanent Combination (for crack width check)
P ML MT
t t-m t-m
Max P Case 524.1 319.0 0.0
Distribution Reinforcement
Distribution reinforcement = 0.25 % of gross area Cl. 710.3.4, IRC:78-2014
Distribution reinforcement per meter height = 2000 mm2/m
2
Distribution reinforcement per meter height on each face = 1000 mm /m
2
Ast,provided per meter height = 1256.6 mm /m OK
Minimum area of horizontal reinf. per meter = 25 % of Area of vertical reinf. or 0.001Ac whichever is greater
2
= 800.00 mm /m Cl. 16.3.2, IRC:112-2011
2
Total area of horizontal reinf. provided per meter = 2513.3 mm /m OK
A2_Fr-121+255_skew
114
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D
from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
2
Area of confined core ACC = 11377630.4 mm
ωw,req = 0.0083
For rectangular sections
Minimum confining reinforcement
ωwd.c ≥ max(ωw,req ; 0.12)
ωwd.c ≥ 0.12
Provide spacing SL = 80 mm
OK
For rectangular section in one direction
Volumetric ratio of hoop reinforcement relative to concrete core
2
Area of hoop bar Asp = 6911.5 mm
ρw = Asw
SL.b
= 0.005
Therefore confining reinforcement will be provided over a length of = 800.00 mm above founding top level
A2_Fr-121+255_skew
115
Document
LOUIS BERGER No.
4800197-GGN-
Job No. 4800197 DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-
31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Abutment design
FAGUS
SECTION PROPERTIES
RESULTS
116
UR :
STRESS RESULTS
CRACK CHECK
117
LOUIS BERGER Document No.
Material property
Grade of reinforcement = 550
fyk = 550 Mpa
Modulus of elasticity Es = 200000 Mpa
Grade of concrete = M35
fck = 35
fcm = 45
Ecm = 32308 Mpa
Fyd = 440 Mpa
Clear cover = 75 mm
Ecm for short tem loading = 32308 Mpa
Ecm for long term loading = 16154 Mpa
fcteff = 2.77 Mpa
fcd = 15.61 Mpa
Creep factor φ = 1
εcu2 = 0.0035 mm
A2_Fr-121+255_skew 118
LOUIS BERGER Document No.
800
1000
ULS Capacity check
Section Sec 1 Sec 2
MED (T-M) 49 0.1
b (mm) 1000 1000
D (mm) 800 800
d (mm) 717 719
φ1 (mm) 16 12
s1 (mm) 100 100
φ2 (mm) 0 0
s2 (mm) 150 150
Ast (mm2) 2011 1131
Xumax (mm) 318 319
Xu (mm) Xu = (0.87*fyk*Ast)/(0.36*fck) 76 43
Check 1 OK OK
Astcal (mm2) Astcal =M/0.87*fyk*(d'-0.416 Xu) 1503 2
Check 2 OK OK
Ast min As per cl 16.5.1.1 IRC-112 939 942
Check 3 Ok Ok
ΔFd (T) 7.17 0.00
MED/Z + ΔFd 79.1 0.1
MRD (T-M) MRD = 0.87*fyk*Ast*(d-0.416 Xu) 65.93 37.94
Check 4 OK OK
MRD/Z 96 54
Check 5 Ok Ok 0.822188
Distribution reinforcement 0.2*Ast = 402.1
Provided distibution reinforcement
12 φ 100 C/C 1131.0 mm2
Ok
Secondary transverse reinforcement 402 mm2
Provided distibution reinforcement
12 φ 100 C/C 1131 mm2
Ok
A2_Fr-121+255_skew 119
LOUIS BERGER Document No.
A2_Fr-121+255_skew 120
LOUIS BERGER Document No.
A2_Fr-121+255_skew 121
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
13 Design of Pile Foundation
13.1 Design of Pile Foundation - Base Pressure
No. of piles = 10 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
4.8
Minimum Thickness of
Pile cap = 1.80 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.631, 8.71
Pile diameter = 1.20 m 1.631, 7.18
Area of pile = 1.131 m2
-1.631, 4.73 MT
16 1.631, 3.21
3
Unit Weight of R.C.C = 2.5 t/m B B
-1.631, 0.76
Self weight of Pile cap = 378 t
1.631, -0.76
Total Length L1+Lf = 11 m
Length of pile = 17.0 m -1.631, -
Reduction factor for pile B.M= 0.87 (IS 2911 part 1, sec iv, fig 5) 3.21 1.631, -4.73
-1.631, -
Loads on Pile 7.18 1.631, -8.71
Normal Seismic A
Maximum Pile Load = 153 t. OK 175 OK Max. horizontal load on pile = 28.92 T OK
A2_Fr-121+255_skew 122
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Calculation of loads on piles for each load combination
Comb 1
1
1190 23 476 288 0 119 29 1 149 89 29 134
L
W 2
L 1152 413 469 286 0 115 29 9 153 77 29 134
H 3
F 1023 23 419 289 0 102 26 1 129 76 29 135
L
4
986 413 412 287 0 99 25 9 133 64 29 134
SD-LWL 5
710 0 146 194 0 71 9 0 79.94 62 19 90
SD-HFL 6
543 0 87 193 0 54 5 0 59.65 49 19 90
A2_Fr-121+255_skew 123
Document No.
LOUIS BERGER
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Seismic
7
1030 220 1054 554 62 103 65 5 173 33 56 260
LWL - L
8
1023 294 1053 554 62 102 65 7 173 31 56 260
9 1030 723 893 461 207 103 55 16 174 32 50 236
LWL - T
10 1023 791 891 460 205 102 55 18 175 30 50 235
11 926 220 881 461 62 93 54 5 151 34 46 217
LWL - V
12 919 295 879 460 62 92 54 7 152 31 46 217
13 863 220 1061 628 62 86 65 5 156 16 63 295
HFL - L
14 856 294 1060 628 62 86 65 7 157 14 63 295
15 863 723 900 535 207 86 55 16 157.67 15 57 268
HFL - T
16 856 791 898 534 205 86 55 18 158.38 13 57 267
17 759 220 888 535 62 76 54 5 135.24 17 54 251
HFL - V
18
753 295 886 534 62 75 54 7 136.20 14 54 251
SD-LWL-L 19
683 64 623 439 37 68 38 1 107.95 29 44 205
SD-LWL-T 20 683 213 462 345 124 68 28 5 101.39 35 37 171
SD-LWL-V 21 621 64 449 345 37 62 28 1 91.05 33 35 162
SD-HFL-L 22 516 64 626 496 37 52 38 1 91.44 12 50 232
SD-HFL-T 23 516 213 464 402 124 52 28 5 84.88 18 42 196
SD-HFL-V 24 454 64 452 402 37 45 28 1 74.54 16 40 189
A2_Fr-121+255_skew 124
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
No. of piles = 10 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
4.8
Minimum Thickness of
Pile cap = 1.80 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.631,
Pile diameter = 1.20 m 8.705 1.631, 7.18
Area of pile = 1.131 m2
-1.631,
16.0 MT
4.732 1.631, 3.21
A2_Fr-121+255_skew 125
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Calculation of loads on piles for each load combination
Comb 1
L
1 1599 34 703 411 0 160 43 1 204 116 41 192
W
L 2 1575 620 692 408 0 158 42 14 214 101 41 191
H 3 1595 34 613 412 0 159 38 1 198 121 41 192
F
L 4 1538 620 602 409 0 154 37 14 205 103 41 191
SD-LWL 5 958 0 278 291 0 96 17 0 112.87 79 29 136
SD-HFL 6 921 0 185 289 0 92 11 0 103.48 81 29 135
A2_Fr-121+255_skew 126
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Comb 2
L
1 1200 30 666 353 0 120 41 1 162 79 35 165
W
L 2 1176 537 656 351 0 118 40 12 170 65 35 164
H 3 1191 30 586 354 0 119 36 1 156 82 35 165
F
L 4 1142 537 576 352 0 114 35 12 161 67 35 164
SD-LWL 5 710 0 307 252 0 71 19 0 89.84 52 25 118
SD-HFL 6 676 0 225 251 0 68 14 0 81.41 54 25 117
Seismic
A2_Fr-121+255_skew 127
Document
LOUIS BERGER No.
4800197-GGN-DD-
Job No. 4800197
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to 033
KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Note:
1 The Load combination presented above is calculated in accordance with Table 3.4 of notification No. 78-Amendment to IRC 6:2017 with unfactored loads. For load
combination no. 7 - 24 (Seismic Loads combination) is taken as 1.35 times the force transmitted to it by substrucure as per clause 219.8 of IRC 6:2017.
For Deflection calculation,as per Clause No:709.3.5.2 of Amendment to IRC:78-2014, Combination -I is only considered for checking of deflections and not
2
considered in other load combinations.
3 For load combination no. 7 - 24 (Seismic Loads combination) pile capacity is increased by 35% .
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Lf = = 752.04 cm
= 7.521 m
3
= Q * (L1 + Lf) / (12[pile
Y * E head
* I) deflection of equivalent cantilever for fixed head pile]
= 1.30 cm
13.0 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
A2_Fr-121+255_skew 128
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
13 14 Design of Pile Foundation
1 14.0 Design of Pile Foundation - SLS COMBINATIONS
No. of piles = 10 A ML
Eccentricity between
Column and C.G of Pile = 0.00 m
6.3
Minimum Thickness of
Pile cap = 1.80 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.631,
Pile diameter = 1.20 m 8.705 1.631, 7.18
Area of pile = 1.131 m2
-1.631,
6.3 MT
4.732 1.631, 3.21
Unit Weight of R.C.C = 2.5 t/m 3 B -1.631, 0.76 B
Self weight of Pile cap = 378 t 1.631, -0.76
Total Length L1+Lf = 11 m
Length of pile = 17.0 m -1.631, -
Reduction factor for pile B.M = 0.82 (IS 2911 part 1, sec iv, fig 5) 3.211 1.631, -4.73
-1.631, -
7.18 1.631, -8.71
Loads on Pile
Normal Seismic A
Maximum Pile Load = 150 t. 0 Max. horizontal load on pile = 27.47 T OK
Minimum Pile Load = 62 t. 0 .
A2_Fr-121+255_skew
129
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed By: Checked By: Date
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at Ch:121+255 Vishal S.Chatterjee 17-12-2018
Rare
1
1166 23 430 274 0 117 26 1 143 90 27 121
L
W 2
L 1153 413 422 272 0 115 26 9 150 80 27 120
R
a H 3
F 1157 23 372 275 0 116 23 1 139 92 27 121
r
L
e 4
1119 413 364 273 0 112 22 9 143 80 27 120
SD-LWL 5
710 0 146 194 0 71 9 0 79.94 62 19 85
SD-HFL 6
676 0 86 193 0 68 5 0 72.89 62 19 85
QP
Q 1
L 1030 0 149 194 0 103 9 0 112 94 19 85
u
a W
2
s L 1054 0 149 194 0 105 9 0 115 96 19 85
i
H 3
1021 0 89 193 0 102 5 0 108 97 19 85
F
_
L 4
P
1021 0 89 193 0 102 5 0 108 97 19 85
e
r SD-LWL 5
m 710 0 146 194 0 71 9 0 79.94 62 19 85
a
SD-HFL 6
n 676 0 86 193 0 68 5 0 72.89 62 19 85
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
= 0.87 cm
8.7 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
A2_Fr-121+255_skew
130
Document No.
LOUIS BERGER
Job No. 4800197 4800197-GGN-DD-033
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Designed By: Checked By: Date
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
STRUCTURE: Design of abutment & foundation for A2 (Free) - MNB at
Vishal S.Chatterjee 17-12-2018
Ch:121+255
Sno Case P ML MT HL HT
1 -1160 1919 0 411 0
2 -1013 1905 0 408 0
3 -1211 1924 0 412 0
4 -1031 1911 0 409 0
5 -788 1356 0 291 0
6 -807 1351 0 289 0
7 -785 1650 0 353 0
8 -653 1638 0 351 0
9 -825 1654 0 354 0
10 -669 1642 0 352 0
11 -521 1176 0 252 0
12 -538 1171 0 251 0
13 -858 2554 0 547 0
14 -836 2551 0 546 0
15 -779 2679 0 574 0
ULS
16 -760 2667 0 571 0
17 -861 1922 0 412 0
18 -840 1919 0 411 0
19 -816 2830 0 606 0
20 -794 2827 0 606 0
21 -737 2880 0 617 0
22 -718 2868 0 614 0
23 -819 2193 0 470 0
24 -798 2190 0 469 0
25 -660 1899 0 407 0
26 -701 1669 0 358 0
27 -694 1573 0 337 0
28 -619 2165 0 464 0
29 -659 1921 0 412 0
30 -652 1839 0 394 0
A2_Fr-121+255_skew 131
FAGUS:
Section properties
Reinforcement Details
A2_Fr-121+255_skew 132
Results:
UR
Moment Capacity 0.9 ok
Shear 0.85 ok
A2_Fr-121+255_skew 133
Design forces for Pile - SLS Case
Rare combination
Sno Case P ML MT HL HT
1 -897 1206 0 274 0
2 -802 1198 0 272 0
3 -924 1209 0 275 0
Rare
4 -804 1201 0 273 0
5 -620 853 0 194 0
6 -623 849 0 193 0
Stress
Concrete 8.3 Mpa ok
Steel 158 Mpa ok
A2_Fr-121+255_skew 134
Design forces for Pile - SLS Case
Quasi Permanent combination
Sno Case P ML MT HL HT
1 -939 853 0 194 0
2 -963 853 0 194 0
3 -966 849 0 193 0
QP
4 -966 849 0 193 0
5 -620 853 0 194 0
6 -623 849 0 193 0
A2_Fr-121+255_skew 135
LOUIS BERGER Document No.
In the design of dirtwall the total height cosidered has been calculated taking into account a
slope of 2.5% provided in the carriageway.
0.30 Ka = 0.279
3.065 g = 1.80 t/m3
2 1
Eq. Height of surcharge = 1.2 m
1.539 t/m2 0.603 t/m2
2
1 Earth Pressure due to surcharge = 0.603 t/m
2
2 Earth Pressure due to backfill of earth Rare = 1.539 t/m
ULS factor for earth pressure 1.5 SLS factor for earth pressure 1.3
ULS factor for live load surcharge 1.2 SLS factor for live load surcharge 1.0
ULS factor for live load 1.5 SLS factor for live load 1.3
QP
SLS factor for earth pressure 1
SLS factor for live load surcharge 0.8
SLS factor for live load 0
Bending moment at the base of dirtwall due to surcharge (1) = 2.83 t-m/m
Bending moment at the base of dirtwall due to earth pressure (2) = 3.04 t-m/m
1.7
10.0t 10.0t
3.06 2.79m
A2_Fr-121+255_skew 136
LOUIS BERGER Document No.
300
1000
ULS Capacity check
Section
MED (T-M) 10.38
b (mm) 1000
D (mm) 300
d (mm) 242
φ (mm) 16
s (mm) 125
Ast (mm2) 1608
Xumax (mm) 107
Xu (mm) Xu = (0.87*fyk*Ast)/(0.36*fck*b) 61
Check 1 OK
Astcal (mm2) Astcal =M/0.87*fyk*(d'-0.416 Xu) 1002
Check 2 OK
Ast min As per cl 16.5.1.1 IRC-112 317
Check 3 Ok
ΔFd (T) 3.3
MED/Z + ΔFd 51.2
Check 4 OK
MRD/Z 77
Check 5 Ok
Distribution reinforcement 0.2*Ast = 321.7
Provided distibution reinforcement
2
10 φ 100 C/C 785 mm
Ok
2
Secondary transverse reinforcement 322 mm
Provided distibution reinforcement
2
10 φ 100 C/C 785 mm
Ok
A2_Fr-121+255_skew 137
LOUIS BERGER Document No.
ΔFd (T) =
Check 6 Ok ΔFd (T) 0.5*Ved*cotθ 3.3
SLS Stress check
sec 1 Section 1
Load comb Rare QP Creep coefficient φ 1.5
MED (T-M) 8.89 5.30 Mst = Mrare-MQP 4
b (mm) 1000 1000 Eceff =Ecm*(Mrare)/Mst+(1+φ)*MQP 17052
D (mm) 300 300 mqp = Es/ Ecm 6.2
d (mm) 242 242 mrare =Es/Eceff 11.7
φ (mm) 16 16
s (mm) 125 125
Ast (mm2) 1608 1608 h k
m 12 6 0 1
N. A.(x) 79 60 0.3 1
INA 6.66E+08 4.02E+08 0.8 0.65
Comp stress 10.49 7.94 3 0.65
Comp Perm. 16.80 12.60
Check 1 OK Ok
Tensile stress 256 148
Tensile Perm. 330 330
Check 2 OK Ok
A2_Fr-121+255_skew 138
LOUIS BERGER Document No.
A2_Fr-121+255_skew 139
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM Job No 4800197 4800197-GGN-DD-033
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state
of West Bengal Designed by: Checked by Date
STRUCTURE: Design of abutment cap Vishal S.Chatterjee 17-12-2018
16.0 Design of Abutment Cap
The center line of the support lies within the abument wall width
Bearing pressure under the bearing is checked for satisfying the cube root formula :-
2
fcd = 15.61 N/mm for M35 grade,
2
Transferred bearing area 1102500 mm 1177.894
Therefore abutment cap has been designed as per Clause 716.2.1 , IRC :78- 2014
2 2
Total Area of steel required (mm ) = 0.25 % in one direction 1281.3 mm
Steel provided at each face i.e top face and bottom face 12 nos. 12 dia
O.K.
2 2
Area of steel required (mm )/m @ 0.25% 562.5 mm /m
2
Provided 10 dia 6 leg stirrups 200 c/c 2356 mm
O.K.
A2_Fr-121+255_skew 140
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
17.0 DESIGN OF END RETURN WALL
1 Angle of Repose of Soil, f (in degrees) f= 30.0
2 Cohesion, C (in t/m2) C= 0.0
a = 5.600 3 Angle of Wall friction d= 20.0
gsub =
3
4 Density of Soil (submerged) , gsub (in t/m ) 1.00
5 Batter of wall with horizontal, a (in degrees) a= 90.00
6 Inclination of Backfill with horizontal, b (in degrees) b= 0.00
7 Equiv. Ht. of backfill earth for Live load surcharge (m) heb 1.2
For Coulomb's Theory Ka = 0.297
2 2 2
Ka = Sin (a+f)/ [Sin a sin (a-d) {1+ sqrt ((Sin(f+d).Sin (f-b))/(Sin (a-d).Sin(a+b)))} ]
For Rankine's Theory Ka = 0.333
'
Ka =
b = 5.700
8 Active Earth pressure Coefficient 0.297
ka = 0.279 KaH = 0.279
g = 1.80 KaV = 0.102
ULS factor for earth pressure 1.5 SLS factor for earth pressure 1
ULS factor for live load surcharge 1.2 SLS factor for live load surcharge 0.8
Grade of Concrete M 35 QP
Grade of steel 550 SLS factor for earth pressure 1
SLS factor for live load surcharge 0
Q2=ka*g*h
Q1=ka*g*SHt
The end return wall has been designed as a plate fixed on its two faces i.e. at the base and on one of its vertical sides.
( Refer Table 26 of Formula of Stress & Strain by Roark & Young ).
1 5.7 5.60 0.98 0.603 1.732 1.728 1.179 1.158 -5.65 -5.64
A2_Fr-121+255_skew 141
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Ast provided (vertical) = 3141.59 mm2 Ast provided (horizontal) = 2010.62 mm2 1130.97 mm2
CHECK FOR SHEAR
A2_Fr-121+255_skew 142
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Check for Check for shear Check for maximum shear capacity
Check for shear maximum Load Comb 0.6H Load Comb At 0.6H
Load Comb Load Comb At base VED 9.04 VED 9.0
VED 16.79 VED 16.79 β 1 b 1000
β 1 b 1000 βVED 9.04 deff 315
βVED 16.79 deff 315 deff 315 z 283.5
deff 315 z 283.5 b 1000 αcw 1
b 1000 αcw 1 k 1.80 ν1 0.53
VRDmax
=αcw*b*z*v1
k k=min(1+sqrt(200/d),2) 1.80 ν1 0.53 ρ 0.0064 VRDmax *fcd/2 118
VRDmax
ρ=min((Ast/b/deff),0.02) =αcw*b*z*v1*f
ρ 0.0100 VRDmax cd/2 118 νmin 0.442 Check 7 Ok
νmin νmin=0.031k^(3/2)*fck 0.442 Check 7 Ok σcp 0 θactual 2.20
σcp 0 θactual 4.10 VRDC 17.59 θadopted 45
VRDC=(max(((0.12*k*(80*ρ
*fck)^0.33) + ΔFd (T) =
VRDC 0.15*σcp),(vmin+0.15*σcp) 20.38 θadopted 45 Check OK ΔFd (T) 0.5*Ved*cotθ 4.52
ΔFd (T) =
Check OK ΔFd (T) 0.5*Ved*cotθ 8.395
Shear R/f not required
Dia of shear r/f 10
Spacing 250 SLS Moment of return wall
No of legs 8 At bottom section At 0.6H section
fywd 440 SLS rare moment in SLS Qp Moment in SLS rare moment in SLS Qp Moment in
VRds 31 vertical dir. (Mu) tm vertical direction horizontal dir. (Mu) tm horizontal direction(Mh)
VRd 31
Check OK 15.1 10.6 10.5 6.0
A2_Fr-121+255_skew 143
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Creep coefficient φ 1 1
SLS Stress check Bottom section Horizontal Cover 75.00mm Mst = Mrare-MQP 5 5
Load comb Rare QP Rare QP ES 200000 Eceff =Ecm*(Mrare)/Mst+(1+φ)*MQP 18994 20556
MED (T-M) 15 11 11 6 Fcm M 45 mqp = Es/ Ecm 6.2 6.2
b (mm) 1000 1000 1000 1000 Ecm 32308 mrare =Es/Eceff 10.5 9.73
D (mm) 400 400 400 400
d (mm) 315 315 317 317
φ (mm) 20 20 16 16
s (mm) 100 100 100 100
Ast (mm2) 3142 3142 2011 2011
m 11 6 10 6
N. A.(x) 115 93 94 77
INA 1.83E+09 1.23E+09 1.25E+09 8.69E+08
Comp stress 9.50 8.03 7.88 5.35
Comp Perm. 16.80 12.60 16.80 12.60
Check 1 Ok Ok Ok Ok h k
Tensile stress 174 119 183 103 0 1
Tensile Perm. 300 300 300 300 0.3 1
Check 2 Ok Ok Ok Ok 0.8 0.65
3 0.65
Crack Width Check
For minimum Ast requirement for crak control
Load comb Base 0.6H
b 1000 1000
h 400 400
d 315 317
Acteff =min(h/2,(h-N.A) /3,
Acteff 2.5*(h-d))*b 102354.5 107582.4 From Table 12.2 IRC112
σst 160 160
fcteff 2.9 2.9 cl 12.3.3 IRC-112
k 0.65 0.65 Eq 12.2 IRC-112
kc 0.4 0.4
As, min As,min=k*kc*fcteff/σst 482 507
As provided 3142 2011
Check Ok Ok
A2_Fr-121+255_skew 144
LOUIS BERGER Document No.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package- Job No 4800197 4800197-GGN-DD-033
II A) Ghoshpukur-Salsalabari section in the state of West Bengal Designed by: Checked by Date
STRUCTURE: Design of Return wall Vishal S.Chatterjee 08-06-2018
Srequired 200
Check for crack width Check Ok
Load comb
heff=min(2.5(h-d),(h- Check for maximum spacing
heff x/3),h/2) 102.354 107.582 b/w bars
b 1000 1000 Load comb
Aceff Aceff = heff*b 102354 107582 φ 20
Asprovided 3142 2011 C 75
ρpeff ρpeff =As/Aceff 0.031 0.019 Sprovided 100
k1 0.800 0.800
k2 0.500 0.500
Srmax Srmax=3.4c+0.17Φ/ρpeff 365.8 400.5
σsc 119 103
N.A 93 77
kt 0.5 0.5
αe 6 6
εm =max(((σsc-
εm (kt*(fcteff/ρpeff)*(1+αe*ρ 0.00036 0.00031
Wk 0.130 0.124
Check Ok Ok
A2_Fr-121+255_skew 145
DESIGN OF PILE CAP ABUTMENT
146
INPUT AND
LOAD CALCULATIONS
147
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
6998 mm
perimeter
148
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the
State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
ULS CONDITION
No. of piles = 10
SECTION MODULUS
PILE 1 2 3 4 5
ZT 44.7 100.1 1.00E+09 100.1 44.7
ZL 16.31 16.31 16.31 16.31 16.31
149
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the
State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
SUMMARY OF FORCES FOR DESIGN OF PILE CAP IN LONGITUDINAL DIRECTION:
150
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the
State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
Transverse direction:-
Since there is no bending in trasnverse direction so there will be minimum reinforcement in trasnverse direction
151
LOUIS BERGER Document no.
SLS CONDITION
No. of piles = 10
SECTION MODULUS
PILE 1 2 3 4 5
ZT 44.7466 100.087 1E+09 100.087 44.7466
ZL 16.31 16.31 16.31 16.31 16.31
CRACK WIDTH
V = 1058 t
Max Load on a Pile= 115 t
Downward Weight due to pile cap = 165.85 t
Lever arm = 1.13 m
Moment due to S.W. & Cushion = 187 tm
Net B.M = 592 t-m
152
ULS CHECK
153
LOUIS BERGER Document no.
Load/m
= 110.46 t/m
ULS Moment = 149.89 tm/m
Material Specification:
STRENGTH CHECK
MATERIAL DATA
3 Grade of Steel 550
4 Characteristic strength of reinf. (fyk) Mpa 550
5 Partial factor for steel (Уs) 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200
8 Grade of Concrete 35
9 Charecterstic comp. strength (fck) Mpa 35
10 α 0.67
11 Concrete material factor (Уm) 1.50
12 Design value for Concrete comp. strength (fcd = αfck/Уm) Mpa 15.63
Geometric Data
13 Width of slab(b) mm 1000
14 depth of Member mm 1800
15 Clear Cover mm 75
16 Dia of reinforcement mm 20
17 Spacing of bars mm 110
18 Dia of reinforcement mm 0
19 Spacing of bars mm 110
20 Area of reinforcement mm² 2855
21 Reinforcement (Ast/bd) 0.0017
22 Hence Pt= (100*Ast/bd) % 0.17
23 Dia of Shear Reinforcement links mm 0
24 Spacing of reinforcement in other direction mm 220
25 number of legs Nos. 4 (links per meter)
26 Reinforcement(%)
Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 1695
32 Depth of NA from comp. flange (x) mm 109
33 λ 0.80
34 η 1.00
35 Depth of stress Block (λx) mm 87
36 Stress on stress Block (η fcd) MPa 15.63
37 Total comp. force (Fc = λxηfcdb) KN 1365
38 Total tension Force (Fs = fyd At) KN 1365
39 Diff (Fc-Fs) KN 0
40 Depth of Lever arm (z) = d-λx/2 mm 1651
41 Moment of resistance (Fc*z) KN-m 2254
42 UR for pure bending 0.65
43 Status O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 848
58 2d = mm 3390
59 αv = m 1.357
60 β= 0.401
61 Design Shear force,Ved = kN 434
62 K = 1+sqrt(200/d)<=2 1.344
63 σcp MPa 0.000
64 ρ1=At/(bd)<=0.02 0.002
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.286
66 Concrete Shear Capacity Vrd.c =
KN 456
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 484
69 [Vmin+(0.15σcp)]bwd
70 Status (if 0 = reinf. Not reqd;or 1 = reinf reqd) 0
Status O.K
156
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning of 4800197-GGN-DD-
Job No 4800197
033
NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha 14-12-2018
Design of Pile Cap for A1 fix at Ch: 121+255
DESIGN FOR PUNCHING SHEAR IN PILE CAP AS PER IRC : 112 - 2011
3
Density of concrete 25 KN/m
3
Density of soil 18 KN/m
Characteristic Strength, fck 35 Mpa
Design Strength of concrete, fcd 15.63 Mpa
Net Applied Force, Ved 2508 KN
Net downward force within the control perimeter, DVEd 263.9 KN
Overall depth of pile cap 1800 mm
Effective Depth of Pile Cap, d 1699.0 mm
Reinforcement Ratio, rl 0.0007
Distance between the edge of pile to the edge of pier 648 < 2d
VEd,red = VEd - DVEd 2243.72 KN
n = 0.6 x [1-fck/310] 0.532
Maximum Punching Shear Resistance , nRd.max = 0.5 x n x fcd 4.16 Mpa
0.5
K = 1 + (200/d) 1.34 ≤2
1.5 0.5
nmin = 0.031 x K x (fck) 0.285 Mpa
Distance of control perimeter from column periphery, a 648.0 mm
2xd/a 5.24
Perimeter along control line, p 7000.00 mm
2
Area enclosed by control line 3.62 m
nEd,red = VEd,red /(bd) 0.189 MPa
nmin x 2d/a 1.497 MPa
0.333
nRd = 0.12 x K x (80.r1.fck) x (2d/a) 1.497 MPa
HENCE, OK
157
SLS CHECK
158
LOUIS BERGER Document no.
4800197-GGN-DD-
Detailed Engineering in Connection with Rehabilitation and Up-Gradation Job No 4800197 033
to Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-
A) of Ghoshpukur-Salsalabari section in the State of West Bengal on EPC
mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
Load Data
1 Moment KN-m 7915
Material Data
2 Grade of Steel Fe 550
3 Charecterstic strength of reinforcement (fyk) 500
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 434.78
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200
7 Grade of Concrete M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35
9 α Cl 6.4.2.8,IRC 112 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50
Design value for concrete compressive strength (fcd=
11 αfck/γm) Cl 6.4.2.8,IRC 112 MPa 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32
Geometric Data
13 Width of Slab/Beam (b) mm 16200
14 Total depth of Slab/Beam (D) mm 1800
15 Cover to Reinforcement mm 75
16 Dia of Reinforcement (φ) in first layer mm 20
18 Effective depth of beam/Slab (d) mm 1715
19 Spacing of Reinforcement (s) or mm 110
20 Number of Bar (n) Nos 147
21 Area of Reinforcement (At) mm2 46181
22 Reinforcement (%) 0.158
Stress Check
23 Concrete Cross Sectional Area (AC) mm2 29160000
24 Perimeter in contact with atmosphere (u) mm 36000
25 Notional Size (=2AC/u) mm 1620
26 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.50
27 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112MPa 12800
28 Modular ratio (m) 1.56
29 Allowable stress in Steel Cl 12.2.2,IRC 112MPa 300
30 Allowable stress in Concrete Cl 12.2.2,IRC 112MPa 16.80
31 Position of nuetral axis from comp. face (x) mm 119.2
32 MOA of Compression area mm2 1.15E+08
2
33 MOA of Tension area mm 1.15E+08
2
34 Diff. mm 0
4
35 MOI of cracked section mm 1.93E+11
36 Stress in tension reinf. MPa 102.304
UR 0.34
37 Status O.K.
38 Stress in concrete MPa 4.892
UR 0.29
39 Status O.K.
159
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
Load Data
1 Moment KN-m 5812
Material Data
2 Grade of Steel Fe 550
3 Charecterstic strength of reinforcement (fyk) Table 18.1,IRC 112 MPa 500
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 434.78
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200
7 Grade of Concrete M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35
9 α Cl 6.4.2.8,IRC 112 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50
11 Design value for concrete compressive strength (fcd= αfck/γm)
Cl 6.4.2.8,IRC 112 MPa 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32
Geometric Data
13 Width of Slab/Beam (b) mm 16200
14 Total depth of Slab/Beam (D) mm 1800
15 Cover to Reinforcement mm 75
16 Dia of Reinforcement (φ) in first layer mm 20
17 Effective depth of beam/Slab (d) mm 1715
18 Spacing of Reinforcement (s) or mm 110
19 Number of Bar (n) Nos 147
20 Area of Reinforcement (At) mm2 46181
21 Reinforcement (%) 0.158
Stress Check
22 Concrete Cross Sectional Area (AC) mm2 29160000
23 Perimeter in contact with atmosphere (u) mm 36000
24 Notional Size (=2AC/u) mm 1620
25 Age at Loading days 28
26 Relative humidity Table 6.9 , IRC %
112 12800
27 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.6
28 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112
MPa 12487.8
29 Modular ratio (m) 16.016
30 Allowable stress in Steel Cl 12.2.2,IRC 112
MPa 400.0
31 Allowable stress in Concrete Cl 12.2.2,IRC 112
MPa 12.60
32 Position of nuetral axis from comp. face (x) mm 352.7
33 MOA of Compression area mm2 1.01E+09
34 MOA of Tension area mm2 1.01E+09
35 Diff. mm2 0.000
36 MOI of cracked section mm4 1.61E+12
160
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pile Cap for A1 fix at Ch: 121+255 14-12-2018
CALCULATION FOR CRACK WIDTH FOR BENDING As per 12.3.4 of IRC 112-2011
41 Wk = Sr,max (esm-ecm)
42 ae = Es/Ecm 6.25
43 depth hc,eff mm 212.5
44 Eff area of conc in tension surrounding reinf Ac,eff mm2 3442500
45 Rr,eff 0.0134
46 fctm Mpa 2.800
47 fct,eff Mpa 2.800
48 kt 1.500
49 (esm-ecm)= {ssc - kt(fct,eff/Rr,eff)(1+aeRr,eff)}/Es -0.0013
50 0.6*ssc/Ec 0.0002
51 (esm-ecm) 0.0002
52 K1 0.80
53 K2 0.50
54 Minimum clear cover c 75.00
55 Srmax = 3.4c+0.425k1k2f/Rreff 508
56 Wk = Sr,max (esm-ecm) 0.120
Allowable crack width 0.300
UR 0.40
Status O.K.
161
Detailed Engineering Consultancy Services for Rehabiliation and
Upgradation by Four-Laning of NH-31D from KM 113.20 to KM
154.854 (Package-II A) Ghoshpukur-Salsalabari section in the state of
West Bengal
Pier_ModSkew_121+255 162
Content
Annex _I Confinement RF
Pier_ModSkew_121+255 163
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
1 Inputs:
16.00 Traffic
Direction
FRL 0.00%
+63.410
24.3m span 24.3 m span
2.20 3m
5.80
4.267
GL 56.14
55.64
2.30
1.80
53.84
= 25.00 deg
Skew Angle
Finished Road Level (FRL) at the centre of Pier = 63.41 m
Super Structure
Pier_ModSkew_121+255
164
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Design height of pier = 5.20 m
Dimension of Pier along traffic = sq dim 1.80 m
Dimension of Pier across traffic = Square Dim = Skw 6.4* cos q 5.80 m LWL (RL) = +56.14
Scour level HFL = +54.19 m Scour level HFL-S = 54.71
HFL (RL) = +59.35 m Scour level LWL-S = 55.22
Max depth of scour = 5.16 m from HFL
Foundation
Pile - Diameter = 1.2 m
No of Pile = 6.0 Nos
Pile cap/Footing -Along Traffic Direction = 5.1 m
Pile cap /Footing -Across Traffic Direction = 8.7 m
Pile cap - Depth = 1.8 m
Min Thickness of soil above pile cap = 0.5 m
Materials
Unit weight of PSC = 25 kN/m3
Unit weight of RCC = 25 kN/m3
Unit weight of Wearing course = 22 kN/m3
Unit weight of Soil fill = 18 kN/m3
Grade of Concrete for Pier = 35 N/mm²
Grade of Concrete for Piles (or Open Foundation) = 35 N/mm²
Grade of Steel used = 500 N/mm²
Load Calculation
1.1 Dead Load
1.1.1 SuperStructure
Load from Span 1
Total Weight = (360.2)×25.0 DL Extra Factor 1
Reaction on Bearing(Outer bearing) = 2795 kN
Total SIDL
Reaction (Outer Bearing) = 644 kN
Reaction (Inner Bearing) = 644 kN
Total reaction = 1288 kN
Pier_ModSkew_121+255
165
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Free bearing
u(Rg+Rq) 257 kN 189
Pier_ModSkew_121+255
166
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
1.4 Seismic force
Calculation of Seismic coefficients
Z Sa
2 g
Ah
R
I
Importance factor , I = 1.20
Zone Factor, Z (for Zone v) = 0.36
Response reduction factor, R Long- direction = 3.00
Response reduction factor, R Trans - direction = 3.00
Fundamental natural period
D
T 2 (Annexure D , IRC:6-2017)
1000 F
D= Appropriate dead load of the superstructure and live load in kN
F = Horizontal force in kN required to be applied at the centre of mass of the superstructure for one mm
horizontal deflection at the top of the pier for the earthquake in the transverse direction
and the force to be applied at the top of the bearings for the earthquake in the longitudinal direction
1.4.1 Calculation of Stiffness
Pier
Dimension of Pier - Longitudinal direction = 1.80 m
Dimension of Pier - Transverse direction = 6.40 m
Pier - design height = 5.20 m
Grade of concrete = M 35
4
M.I in longitudinal direction IL (0.75 Cracked MOI) = 2.333 m =(6.40×1.80^3)/12
M.I in transverse direction IT (0.75 Cracked MOI) 4
= 29.491 m =(1.80×6.40^3)/12
Modulus of elasticity of concrete E = 32000 N/mm2 (IRC:112-2011 Table 6.5)
Stiffness in trans direction K1T = 3EI/H
3
=6×32000×1000×29.491/((5.55^2)×((3×(1.61))+(2
= 7713023 kN/m
×5.55)))
3
Stiffness - Longitudinal (3EIL/L ) K1L = 1309995 kN/m =3×32000×1000×2.333/(5.55)^3
Height taken for the calculation (H) upto bearing top = 5.55 m
(H of shortest pier in the group)
Piles
Total Stiffness
Stiffness " k " = 1/(1/k1+1/k2)
Stiffness in Longitudinal direction "KL" = =1/(1/1309995+1/578813)
= 401440 kN/m
= 401.44 kN/mm 1309.995459
Stiffness in transverse direction "KT" = 1/(1/7713023+1/578813)
= 538409 kN/m
= 538.41 kN/mm 7713.022718
Pier_ModSkew_121+255
167
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
1.4.2 Calculation of Seismic coefficient in the Longitudinal direction
D = 6878 kN
T = 0.145 (eq-1)
Sa/g = 2.500 2.50 for square pier link with this
= 2.500 for wall type pier full Sa/g considered
Horizontal accelaration longitudinal " AhL " = (Sa/g)*(Z/2)/(R/I)
= 0.180 =(0.36/2)×(2.500)/(3.00/1.20)
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017
T = 0.062 (eq-1)
Sa/g = 2.500
Horizontal acceleration Transverse " AhT " = (Sa/g)*(Z/2)/(R/I)
= 0.180 (=(0.36/2)×2.500/(3.00/1.20))
Vertical acceleration " Av " = 0.120 as per clause 219.3 of IRC:6-2017
Pier_ModSkew_121+255
168
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
= 113 kN
Longitudinal wind load (FL) = 28 kN
Pier_ModSkew_121+255
169
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
h/b = 0.73
d/b = 0.281
Drag Coefficient (CD) = 1.30
2
Exposed area of substructure (A1) = 10 m
2
Wind pressure (Pz) = 551.8 N/m
Transverse wind load (FT) Pz x A1 x G x CD = 14 kN
h/b = 2.61
d/b = 3.556
Drag Coefficient (CD) 1.361111111 = 0.80
2
Exposed area of substructure (A1) = 77.0 m
2
Wind pressure (Pz) = 551.8 N/m
Longitudinal wind load (FL) = 68 kN
2
Intensity of pressure due to water P = 52KV
Constant K depends on the shape - For pier & footings K = 0.66
Intensity of pressure =52×0.66×4.24^2 = 617.8 kg/m2
=617.76×9.81/1000 = 6.1 kN/m2
Variation of force due to water current over pier
Variation of velocity with depth (at HFL -S) (at HFL -N)
2
(at HFL) 6.06 6.06 kN/m
HFL
5.2 3.71
1.22 1.71 kN/m2 Pier bottom
0.00 4.64 0.00 kN/m2 Pile bottom
SCOUR LEVEL
Pier_ModSkew_121+255
170
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Lateral
Resolved Pressure intensities at Cos q Calculation Trans force Sin q Calculation Long. force
intensity
Bottom of footing level 0.0 0.940 =0.0×0.940 0.00 0.342 =0.0×0.342 0.00
Pier_ModSkew_121+255
171
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Buoyancy : LWL
q
Mx Long
Hx
P Horizontal Force (kN) Resolved H Force (kN) Lever arm (m) Resolved Moment (kN-m)
S.No Description of Load
(kN) HT HL Hz(HT') Hx (HL') eT eL Mz (M'T) Mx(M'L)
1 D.L (Superstructure ) 5590 0 0 0 0 0 0 0 0
D.S.S 0
2 S.I.D.L- Fixed 486 0 0 0 0 0 0 0 0
S.I.D.L- variable 802 0 0 0 0 0 0 0 0
3 Live Load
L.L (Case 1-Max P) 2118 0 0 0 0 0.00 0.00 2185 178
L.L (Case 2-Max ML) 1702 0 0 0 0 0.00 0.00 285 1577
L.L (Case 3 - Max MT) 1378 0 0 0 0 0.00 0.00 5635 37
4 Longitudinal Forces (additional vertical force is neglected)
4.1 Normal Condition 0 0 641 271 581 0.35 0.35 95 203
4.2 During Seismic Condition 0 0 0 0 0 0 0.35 0 0
5.1 Seismic Force (Transverse) 0 0
5.1.1 Superstructure (DL) -671 1006 0 912 425 1.82 0.35 1657 149
5.1.2 Superstructure (SIDL) -155 232 0 210 98 2.60 0.35 546 34
5.1.3 Superstructure (LL) 0 0
L.L (-Max P) -51 76 0 69 32 3.850 0.35 266 11
L.L ( Max ML) -41 61 0 56 26 3.850 0.35 214 9
L.L (- Max MT) -33 50 0 45 21 3.850 0.35 173 7
5.1.4 Substructure 0 0
5.2 Seismic Force (Longitudinal) 0 0
5.2.1 Superstructure (DL) -671 0 1006 425 912 0.35 0.35 149 319
5.2.2 Superstructure (SIDL) -155 0 232 98 210 0.35 0.35 34 74
5.2.3 Substructure 0 0 0 0 0 0 0 0 0
6 Centrifugal Force 0 0
Max P 0 111 0 101 47 3.85 0.4 388 16
Max ML 0 89 0 81 38 3.85 0.4 312 13
Max MT 0 72 0 66 31 3.85 0.4 252 11
7 Wind Load 0 0
On superstructure -349 113 28 91 73 1.45 0.35 131 26
Pier_ModSkew_121+255
172
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Live load max reaction case 0 98 24 78 64 4.15 0.35 325 22
Live load max longitudinal case 0 0 0 0 0 4.15 0.35 0 0
Live load max Transverse case 0 98 24 78 64 4.15 0.35 325 22
8 Buoyancy 0 0 0 0 0 0 0 0 0
9 Water Current 0 0 0 0 0 0 0 0 0
Pier_ModSkew_121+255
173
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
1.52 Load Combination at the Top of Pier cap for ULS condition
7 Group III (Case-1) Seismic Transverse 8631 1857 920 4134 363
Refer Annexure
8 Group III (Case-2) Seismic Transverse 8579 1834 909 3740 583
9 Group III (Case-3) Seismic Transverse 8566 1816 901 4643 335
1.53 Load Combination at the Top of Pier cap for SLS condition
14.56 3.70
3.31
W1
0.850
0.950
W2 Traffic Direction
2.90
W3
6.40 1.80
0.50
1.8 m
Pier_ModSkew_121+255
174
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Load of Pier
W2 Area of flared portion (top) = 53.89 m2 Pedestal :
Area of flared portion (bot.) = 23.68 m2 Width = 1.100 m
Height of flared portion = 0.95 m Length = 1.100 m
3
Volume of flared portion = 35.9 m P (KN) e (m) from Pier Base
CG of the flared portion from top of straight
= 0.54 m 896.89 3.94
portion of pier
W3 Width = 6.40 m
Breadth = 1.80 m
Area of c/s of straight portion = 11.520 m2
Total Height of straight portion = 3.40 m =5.20-0.95-0.85
3
Volume of straight portion = 39.168 m P (KN) e (m) from Pier Base
979.2 1.7
W1 Pier Cap
Length of pier cap = 14.56 m
Width of pier cap = 3.7 m
Avg.Thickness of pier cap = 0.85 m P (KN) e (m) from Pier Base
3
Volume of pier cap = 45.80563093 m 1145.140773 4.775
P Horizontal Force (kN) Resolved H Force (kN) Lever arm (m) Resolved Moment (kN-m)
S.No Description of Load
(kN)
HT HL Hz(HT') Hx (HL') eT eL Mz (M'T) Mx(M'L)
1 D.L (Super + Substructure ) 8611 0 0 0 0 0 0
D.S.S 0 0 0 0 0 0 0
2 S.I.D.L- Fixed 486 0 0 0 0 0 0
S.I.D.L- variable 802 0 0 0 0 0 0
3 Live Load
L.L (Case 1- Max P) 2118 0 0 0 0 2185 178
L.L (Case 2 - Max ML) 1702 0 0 0 0 285 1577
L.L (Case 3 - MT) 1378 0 0 0 0 5635 37
4 Longitudinal Forces (additional vertical force is neglected)
4.1 Normal Condition 0 270.91521 581 5.55 5.55 1504 3224
4.2 During Seismic Condition 0 0 0 0 5.55 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -671 1006 0 912 425 7.02 5.55 6399 2360
5.1.2 Superstructure (SIDL) -155 232 0 210 98 7.80 5.55 1639 544
5.1.3 Superstructure (LL)
L.L (Case 1-Max P) -51 76 0 69 32 9.05 5.55 625 179
L.L (Case 2 - Max ML) -41 61 0 56 26 9.05 5.55 503 144
L.L (Case 3 - Max MT) -33 50 0 45 21 9.05 5.55 407 116
5.1.4 Substructure -363 544 0 544 0 3.53 3.53 1919 0
5.2 Seismic Force (Longitudinal)
5.2.1 Superstructure (DL) -671 0 1006 425 912 5.55 5.55 2360 5061
5.2.2 Superstructure (SIDL) -155 0 232 98 210 5.55 5.55 544 1166
5.2.3 Substructure -363 0 544 0 544 3.53 3.53 0 1919
6 Centrifugal Force
Max P 0 111 0 101 47 9.05 5.55 912 261
Max ML 0 89 0 81 38 9.05 5.55 733 210
Max MT 0 72 0 66 31 9.05 5.55 593 170
7 Wind Load
On superstructure -349 113 28 91 73 6.65 5.55 602 407
Live load max reaction case 0 98 24 78 64 8.70 5.55 682 353
Live load max longitudinal case 0 0 24 10 22 8.70 5.55 90 123
Live load max transverse case 0 98 24 78 64 8.70 5.55 682 353
On substructure 0 14 68 16 68 2.60 2.60 41 176
8 Vehicle Collision Load
Longitudinal - Main Component 0 0 0 0 0 0 2.0 0 0
Transverse - Main Component 0 0 0 0 0 3.50 0 0 0
Longitudinal - Residual Component 0 0 0 0 0 0 2.0 0 0
Transverse - Residual Component 0 0 0 0 0 3.50 0 0 0
8 Construction Load
8.1 L.G. Case 1 (Max 'P') 0 0 0.00 0 0 5.20 5.20 0 0
8.2 L.G. Case 2 (Max 'ML') 0 0 0 0 0 5.20 5.20 0 0
8.3 L.G. Case 3 (Max 'MT') 0 0 0 0 0 5.20 5.20 0 0
8.4 Dead Load of Superstructure 0 0 0 0 0 0.00 0.00 0 0
8.5 Dead Load of Substructure 3021 0 0 0 0 0.00 0.00 0 0
8.6 Seismic Load Superstructure 0 0 0 0 0 6.51 6.51 0 0
8.7 Seismic Load Substructure 0 0 0 0 0 3.53 3.53 0 0
Pier_ModSkew_121+255
175
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
8 Water current
LWL Normal/Seismic
HFL Normal 24 31.5 9 39 2.20 2.20 19 85
HFL-seismic 23 29.5 8 36 2.26 2.26 19 82
9 Buyoyancy
LWL Normal/Seismic -58
HFL Normal -471
HFL-seismic -471
10 Hydrodynamic
LWL Seismic 1 1 0 1 0 0 0 0
HFL Seismic 12.16 12.16 6 16 1.59 1.59 9 26
1.56 Seismic Force Combination Resolved H Force (kN) Resolved Moment (kN-m)
S.No Combination P Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -372 1892 1055 11454 5527
1.2 (0.3L+T+0.3V) Max. P 372 1892 1055 11454 5527
1.3 (0.3L+T-0.3V) Max ML -369 1878 1049 11331 5492
1.4 (0.3L+T+0.3V) Max ML 369 1878 1049 11331 5492
1.5 (0.3L+T-0.3V) Max MT -366 1868 1044 11235 5464
1.6 (0.3L+T+0.3V) Max MT 366 1868 1044 11235 5464
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -356 1044 1832 6079 9072
2.2 (L+0.3T+0.3V) Max. P 356 1044 1832 6079 9072
2.3 (L+0.3T-0.3V) Max ML -356 1040 1831 6042 9061
2.4 (L+0.3T+0.3V) Max ML 356 1040 1831 6042 9061
2.5 (L+0.3T-0.3V) Max MT -356 1036 1829 6013 9053
2.6 (L+0.3T+0.3V) Max MT 356 1036 1829 6013 9053
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -1239 677 666 4046 3369
3.2 (0.3L+0.3T+V) Max. P 1239 677 666 4046 3369
3.3 (0.3L+0.3T-V) Max ML -1229 673 664 4009 3358
3.4 (0.3L+0.3T+V) Max ML 1229 673 664 4009 3358
3.5 (0.3L+0.3T-V) Max MT -1221 670 663 3980 3350
3.6 (0.3L+0.3T+V) Max MT 1221 670 663 3980 3350
LWL - Case
Moment Resultant
P Resolved H Force (kN) Resolved Moment (kN-m) kNm
S.No Load Combination Remark
(kN)
Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
1 Group I (Case-1 service-Rare) 11536 462 741 4776 4137 6319
2 Group I (Case-2 service-Rare) 11203 406 709 2757 5078 5778
3 Group I (Case-3 service-Rare) 11082 441 731 7904 3972 8846
4 Group II (Case-1 wind load-Rare) 10973 448 669 4310 3618 5627
5 Group II (Case-2 wind load-Rare) 10723 368 622 2000 3815 4308
6 Group II (Case-3 wind load-Rare) 10632 432 661 6186 3112 6925
7 Group III (Case-1 Service-Frequent) 11147 356 566 3648 3150 4820
8 Group III (Case-2 Service-Frequent) 10898 310 540 2105 3844 4382 Refer Annexure
9 Group III (Case-3 Service-Frequent) 10807 340 559 5994 3026 6715
10 Group IV (Case 1 Wind Load-Frequent) 10181 181 247 1591 1277 2040
11 Group IV (Case 2 Wind Load-Frequent) 10114 137 220 903 1355 1628
12 Group IV (Case 3 Wind Load-Frequent) 10090 177 245 2217 1244 2542
Pier_ModSkew_121+255
176
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
HFL - Case
5 Group II(Case-2) Wind Load 14719 561 948 3764 6412 7435
6 Group II(Case-3) Wind Load 14579 656 1007 10162 5326 11473
7 Group III (Case-1A) Seismic Transverse(-V) 13409 2909 1670 17977 9005 20106
Refer Annexure
8 Group III (Case-1B) Seismic Transverse(+V) 14523 2909 1670 17977 9005 20106
9 Group III (Case-2A) Seismic Transverse (-V) 13347 2885 1659 17460 9168 19721
11 Group III (Case-3A) Seismic Transverse(-V) 13326 2868 1651 18275 8879 20317
12 Group III (Case-3B) Seismic Transverse(+V) 14425 2868 1651 18275 8879 20317
18 Group V (Case-1A) Seismic Vertical(-V) 12108 1087 1087 6865 5768 8967
18 Group V (Case-1B) Seismic Vertical(+V) 15824 1087 1087 6865 5768 8967
18 Group V (Case-2A) Seismic Vertical(-V) 12056 1077 1083 6477 5968 8808
18 Group V (Case-2B) Seismic Vertical(+V) 15743 1077 1083 6477 5968 8808
18 Group V (Case-3A) Seismic Vertical(-V) 12044 1071 1080 7392 5707 9339
18 Group V (Case-3B) Seismic Vertical(+V) 15707 1071 1080 7392 5707 9339
Pier_ModSkew_121+255
177
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
HFL- Case
Resolved H Force (kN) Resolved Moment (kN-m) Moment Resultant
P kNm
S.No Load Combination Remark
(kN) Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
4 Group II(Case-1) Wind Load 15039 690 1057 6584 5602 8645
5 Group II(Case-2) Wind Load 14657 570 987 3784 6497 7518
6 Group II(Case-3) Wind Load 14517 665 1046 10181 5412 11530
7 Group III (Case-1A) Seismic Transverse(-V) 12995 2922 1711 18005 9095 20171 Refer annex
8 Group III (Case-1B) Seismic Transverse(+V) 14110 2922 1711 18005 9095 20171
9 Group III (Case-2A) Seismic Transverse (-V) 12933 2899 1700 17488 9258 19787
12 Group III (Case-3B) Seismic Transverse(+V) 14011 2882 1692 18302 8969 20382
19 Group V (Case-1A) Seismic Vertical(-V) 11694 1096 1128 6886 5859 9041
20 Group V (Case-1B) Seismic Vertical(+V) 15411 1096 1128 6886 5859 9041
21 Group V (Case-2A) Seismic Vertical(-V) 11643 1087 1124 6498 6058 8884
22 Group V (Case-2B) Seismic Vertical(+V) 15329 1087 1124 6498 6058 8884
23 Group V (Case-3A) Seismic Vertical(-V) 11630 1081 1121 7414 5797 9411
24 Group V (Case-3B) Seismic Vertical(+V) 15293 1081 1121 7414 5797 9411
10.44066571 44
1.60 Summary of Load at pile cap bottom Footing 80
Depth of pile cap /Open foundation = 1.80 W1 1997 e1 0.900
Height from Piercap Top = 7.00 m W2 0 e2 1.800
Dead load of the Pier at this level = 3021 kN Soil W3 296 e3 2.05
Dead load of the pile cap = 1997 kN W= 2292 e= 1.048
0.000
2.30
0.5 e3
Wt of soil 296 KN e2
Wt of water from GL to HFL acting on Footing 1053 KN e1
buyoyancy on soil 164 KN
Pier_ModSkew_121+255
178
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Pier +Piercap 3021 e11 = 5.330
Total weight to be used for seismic in foundation 1597 KN Sub+Fdn 5314 3.8489
(Only for exposed pile cap, Zero in case of embedded Open foundation or pile cap)
P Horizontal Force (kN) Resolved H Force (kN) Lever arm (m) Resolved Moment (kN-m)
S.No Description of Load
(kN)
HT HL Hz(HT') Hx (HL') eT eL Mz (M'T) Mx(M'L)
1 D.L (Super + Substructure ) 10904 0 0 0 0 0 0 0 0
D.S.S 0 0 0 0 0 0 0 0 0
2 S.I.D.L- Fixed 486 0 0 0 0 0 0 0 0
S.I.D.L- variable 802 0 0 0 0 0 0 0 0
3 Live Load
L.L (Case 1-Max P) 2118 0 0 0 0 0 0 2185 178
L.L (Case 2 - Max ML) 1702 0 0 0 0 0 0 285 1577
L.L (Case 3 - Max MT) 1378 0 0 0 0 0 0 5635 37
4 Longitudinal Forces (additional vertical force is neglected) *** HL in trans seismic is not shown here. Cell H679 linked separately in Annex tables
4.1 Normal Condition 0 0 0 271 581 7 7.35 1991 4270
4.3 During Seismic Condition 0 0 0 0 0 0 7.35 0 0
5.1 Seismic Force (Transverse)
5.1.1 Superstructure (DL) -671 1006 0 912 425 8.82 7.35 8040 3126
5.1.2 Superstructure (SIDL) -155 232 0 210 98 9.60 7.35 2017 720
5.1.3 Superstructure (LL)
L.L (Case 1-Max P) -51 76 0 69 32 10.85 7.35 750 237
L.L (Case 2 - Max ML) -41 61 0 56 26 10.85 7.35 603 190
L.L (Case 3 - Max MT) -33 50 0 45 21 10.85 7.35 488 154
5.1.4 Substructure + Foundation -554 831 0 831 0 3.85 3.85 3200 0
5.2 Seismic Force (Longitudianal)
5.2.1 Superstructure (DL) -671 0 1006 425 912 7.35 7.35 3126 6703
5.2.2 Superstructure (SIDL) -155 0 232 98 210 7.35 7.35 720 1544
5.2.3 Substructure + Foundation -554 0 831 0 831 3.85 3.85 0 3200
6 Centrifugal Force
Max P 0 111 0 101 47 10.85 7.35 1093 345
Max ML 0 89 0 81 38 10.85 7.35 879 278
Max MT 0 72 0 66 31 10.85 7.35 711 225
7 Wind Load
On superstructure -349 113 28 91 73 8.45 7.35 765 539
Live load max reaction case 0 98 24 78 64 10.50 7.35 823 467
Live load max longitudinal case 0 0 24 10 22 10.50 7.35 109 163
Live load max transverse case 0 97.90 24 78 64 10.50 7.35 823 467
On substructure 0 14 68 16 68 4.40 4.40 69 298
8 Construction Load
8.1 L.G. Case 1 (Max 'P') 0 0 0 0 0 7.00 7.00 0 0
8.2 L.G. Case 2 (Max 'ML') 0 0 0 0 0 7.00 7.00 0 0
8.3 L.G. Case 3 (Max 'MT') 0 0 0 0 0 7.00 7.00 0 0
8.4 Dead Load of the Superstructure 0 0 0 0 0 0 0 0 0
8.5 Dead Load of the Substructure 5018 0 0 0 0 0 0 0 0
8.6 Seismic Load of Superstructure 0 0 0 0 0 8.31 0.00 0 0
8.7 Seismic Load of Substructure 0 0 0 0 0 5.33 0.00 0 0
8 Water current
LWL Normal/Seismic
HFL Normal 32 36 13 46 3.35 3.65 45 168
HFL-seismic 28 33 12 42 3.53 3.78 41 157
9 Buyoyancy
LWL Normal/Seismic -1021
HFL Normal -1434
HFL-seismic -1434
10 Hydrodynamic
LWL Seismic 21 60 6 64 0.62 0.62 4 40
HFL Seismic 27 66 3 71 1.18 0.90 4 64
Pier_ModSkew_121+255
179
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
1.61 Seismic Force Combination Resolved H Force (kN) Resolved Moment (kN-m)
S.No Combination P Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
1 Seismic - Transverse
1.1 (0.3L+T-0.3V) Max. P -429 2179 1141 15160 7517
1.2 (0.3L+T+0.3V) Max. P 429 2179 1141 15160 7517
1.3 (0.3L+T-0.3V) Max ML -426 2166 1135 15013 7470
1.4 (0.3L+T+0.3V) Max ML 426 2166 1135 15013 7470
1.5 (0.3L+T-0.3V) Max MT -424 2155 1130 14899 7434
1.6 (0.3L+T+0.3V) Max MT 424 2155 1130 14899 7434
2 Seismic - Longitudinal
2.1 (L+0.3T-0.3V) Max. P -414 1130 2120 8048 12671
2.2 (L+0.3T+0.3V) Max. P 414 1130 2120 8048 12671
2.3 (L+0.3T-0.3V) Max ML -414 1126 2118 8004 12658
2.4 (L+0.3T+0.3V) Max ML 414 1126 2118 8004 12658
2.5 (L+0.3T-0.3V) Max MT -414 1123 2117 7969 12647
2.6 (L+0.3T+0.3V) Max MT 414 1123 2117 7969 12647
3 Seismic - Vertical
3.1 (0.3L+0.3T-V) Max. P -1430 764 753 5356 4659
3.2 (0.3L+0.3T+V) Max. P 1430 764 753 5356 4659
3.3 (0.3L+0.3T-V) Max ML -1420 760 751 5312 4645
3.4 (0.3L+0.3T+V) Max ML 1420 760 751 5312 4645
3.5 (0.3L+0.3T-V) Max MT -1413 756 749 5277 4634
3.6 (0.3L+0.3T+V) Max MT 1413 756 749 5277 4634
Pier_ModSkew_121+255
180
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
1.62 Summary of Load at pile cap bottom at SLS condition
LWL - Case
Moment Resultant
Resolved H Force (kN) Resolved Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
10 Group IV (Case 1 Wind Load-Frequent) 12328 181 247 1917 1721 2576
11 Group IV (Case 2 Wind Load-Frequent) 12262 137 220 1150 1751 2095
12 Group IV (Case 3 Wind Load-Frequent) 12238 177 245 2535 1684 3043
HFL - Case
Moment Resultant
Resolved H Force (kN) Resolved Moment (kN-m)
P kNm
S.No Load Combination Remark
(kN)
Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
4 Group II (Case-1 wind load-Rare) 14112 462 715 5162 4989 7179
5 Group II (Case-2 wind load-Rare) 13863 382 668 3179 5484 6339
6 Group II (Case-3 wind load-Rare) 13772 445 707 7479 4852 8915
7 Group III (Case-1 Service-Frequent) 14287 369 612 4334 4337 6131 Remark
8 Group III (Case-2 Service-Frequent) 14037 324 586 2708 4984 5672
9 Group III (Case-3 Service-Frequent) 13946 353 605 6651 4200 7866
10 Group IV (Case 1 Wind Load-Frequent) 13320 195 293 1962 1889 2723
11 Group IV (Case 2 Wind Load-Frequent) 13253 151 266 1195 1919 2261
12 Group IV (Case 3 Wind Load-Frequent) 13229 190 291 2580 1852 3176
Pier_ModSkew_121+255
181
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
4 Group II(Case-1) Wind Load 12516 536 823 6271 5993 8674
5 Group II(Case-2) Wind Load 12184 452 774 3864 6754 7782
6 Group II(Case-3) Wind Load 12062 536 823 9594 5884 11255
7 Group III (Case-1A) Seismic Transverse(-V) 10931 3235 1966 22707 14513 26948
8 Group III (Case-1B) Seismic Transverse(+V) 12089 3235 1966 22986 13170 26492 Refer Annexure
9 Group III (Case-2A) Seismic Transverse (-V) 10868 3214 1956 22449 13320 26103
11 Group III (Case-3A) Seismic Transverse(-V) 10847 3197 1948 23236 13017 26634
12 Group III (Case-3B) Seismic Transverse(+V) 11991 3197 1948 23236 13017 26634
19 Group V (Case-1A) Seismic Vertical(-V) 9579 1092 1136 8075 7068 10731
20 Group V (Case-1B) Seismic Vertical(+V) 13441 1092 1136 8075 7068 10731
21 Group V (Case-2A) Seismic Vertical(-V) 9526 1084 1132 7677 7262 10567
22 Group V (Case-2B) Seismic Vertical(+V) 13361 1084 1132 7677 7262 10567
23 Group V (Case-3A) Seismic Vertical(-V) 9512 1084 1141 8626 7083 11162
24 Group V (Case-3B) Seismic Vertical(+V) 13326 1084 1141 8626 7083 11162
HFL- Case
Moment Resultant
Resolved H Force (kN) Resolved Moment (kN-m) kNm
P
S.No Load Combination Remark
(kN)
Hz(HT') Hx (HL') Mz (M'T) Mx(M'L)
4 Group II(Case-1) Wind Load 13156 550 869 6316 6162 8823
5 Group II(Case-2) Wind Load 12824 466 821 3910 6922 7950
6 Group II(Case-3) Wind Load 12702 550 869 9639 6052 11382
7 Group III (Case-1A) Seismic Transverse(-V) 11570 3244 2010 22748 13334 26368
Pier_ModSkew_121+255
182
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
8 Group III (Case-1B) Seismic Transverse(+V) 12729 3244 2010 23027 13334 26610
9 Group III (Case-2A) Seismic Transverse (-V) 11508 3223 2000 22490 13485 26223
11 Group III (Case-3A) Seismic Transverse(-V) 11487 3206 1992 23277 13182 26751
12 Group III (Case-3B) Seismic Transverse(+V) 12631 3206 1992 23277 13182 26751
19 Group V (Case-1A) Seismic Vertical(-V) 10219 1103 1180 8116 7233 10871
20 Group V (Case-1B) Seismic Vertical(+V) 14081 1103 1180 8116 7233 10871
21 Group V (Case-2A) Seismic Vertical(-V) 10166 1094 1175 7718 7427 10711
22 Group V (Case-2B) Seismic Vertical(+V) 14001 1094 1175 7718 7427 10711
23 Group V (Case-3A) Seismic Vertical(-V) 10152 1094 1185 8667 7248 11298
24 Group V (Case-3B) Seismic Vertical(+V) 13966 1094 1185 8667 7248 11298
LWL- CASE
4 Group II(Case-1) Wind Load 18051 526 842 6327 6049 8754
5 Group II(Case-2) Wind Load 17669 561 948 4774 8118 9417
6 Group II(Case-3) Wind Load 17529 656 1007 11343 7138 13403
7 Group III (Case-1A) Seismic Transverse(-V) 15229 4490 2418 31627 15902 35399
8 Group III (Case-1B) Seismic Transverse(+V) 16967 4490 2418 31627 15902 35399
9 Group III (Case-2A) Seismic Transverse (-V) 15168 4459 2403 30990 16021 34886
Group III (Case-2B) Seismic Transverse
10 16894 4459 2403 30990 16021 34886
(+V)
11 Group III (Case-3A) Seismic Transverse(-V) 15149 4437 2393 31714 15698 35386
12 Group III (Case-3B) Seismic Transverse(+V) 16865 4437 2393 31714 15698 35386
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 15260 2306 4364 16822 25783 30786
V)
Group IV (Case-1B) Seismic
14 16936 2306 4364 16822 25783 30786
Longitudinal(+V)
Group IV (Case-2A) Seismic Longitudinal(-
15 15193 2295 4359 16394 25968 30710
V)
Group IV (Case-2B) Seismic
16 16869 2295 4359 16394 25968 30710
Longitudinal(+V)
Group IV (Case-3A) Seismic Longitudinal(-
17 15169 2287 4355 17281 25696 30967
V)
Group IV (Case-3B) Seismic
18 16845 2287 4355 17281 25696 30967
Longitudinal(+V)
19 Group V (Case-1A) Seismic Vertical(-V) 13201 1619 1630 11769 10384 15695
20 Group V (Case-1B) Seismic Vertical(+V) 18994 1619 1630 11769 10384 15695
21 Group V (Case-2A) Seismic Vertical(-V) 13155 1607 1625 11341 10568 15502
22 Group V (Case-2B) Seismic Vertical(+V) 18908 1607 1625 11341 10568 15502
23 Group V (Case-3A) Seismic Vertical(-V) 13146 1600 1622 12228 10297 15986
24 Group V (Case-3B) Seismic Vertical(+V) 18868 1600 1622 12228 10297 15986
Pier_ModSkew_121+255
183
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning of NH-31D from KM 113.20 to KM 154.854
Job No. 4800197 DD-33
(Package-II A) Ghoshpukur-Salsalabari section in the state of West Bengal
Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
HFL - CASE
4 Group II(Case-1) Wind Load 19412 540 888 6372 6217 8903
5 Group II(Case-2) Wind Load 19029 574 994 4819 8286 9585
6 Group II(Case-3) Wind Load 18889 670 1053 11389 7307 13531
7 Group III (Case-1A) Seismic Transverse(-V) 16237 4499 2462 31668 16067 35510
8 Group III (Case-1B) Seismic Transverse(+V) 17975 4499 2462 31668 16067 35510
9 Group III (Case-2A) Seismic Transverse (-V) 16177 4468 2447 31031 16185 34999
11 Group III (Case-3A) Seismic Transverse(-V) 16157 4446 2437 31755 15862 35497
12 Group III (Case-3B) Seismic Transverse(+V) 17874 4446 2437 31755 15862 35497
Refer Annexure
Group IV (Case-1A) Seismic Longitudinal(-
13 16268 2317 4413 16863 25965 30960
V)
20 Group V (Case-1B) Seismic Vertical(+V) 20003 1629 1674 11810 10548 15835
21 Group V (Case-2A) Seismic Vertical(-V) 14163 1618 1669 11382 10733 15645
22 Group V (Case-2B) Seismic Vertical(+V) 19916 1618 1669 11382 10733 15645
23 Group V (Case-3A) Seismic Vertical(-V) 14155 1610 1665 12269 10461 16124
24 Group V (Case-3B) Seismic Vertical(+V) 19876 1610 1665 12269 10461 16124
Pier_ModSkew_121+255
184
LOUIS BERGER Document no.
8.7
1.80 5.1
Design of Pier
185
LOUIS BERGER Document no.
Long Seismic
Element H r H/r Ce We Ah F
(m) (m) (t) (long) (kN)
Pier Shaft 0.5 0.900 0.556 0.39 1.272 0.18 0.876
Pile Cap 1.453 4.350 0.334 0.39 87.649 0.18 60.360
5.1
1.8 8.7
Element H r H/r Ce We Ah F
(m) (m) (t) (trans) (kN)
Pier Shaft 0.5 0.900 0.556 0.39 1.272 0.18 0.876
Pile Cap 1.453 2.550 0.570 0.39 30.955 0.18 21.317
Design of Pier
186
LOUIS BERGER Document no.
8.7
1.80 5.1
Pier_ModSkew_121+255
187
LOUIS BERGER Document no.
5.1
1.8 8.7
Element H r H/r Ce We Ah F M
(m) (m) (t) (trans) (kN) (kN-m)
Pier Shaft 3.707 0.900 4.119 0.73 9.433 0.18 12.160 19.320
Pile Cap 1.453 2.550 0.570 0.39 39.115 0.18 26.937 46.190 1.181432
Pier_ModSkew_121+255
188
LOUIS BERGER Document no.
Pier Section
Reinforcement Details
Pier_ModSkew_121+255
189
LOUIS BERGER Document no.
UR 0.44 OK
Pier_ModSkew_121+255
190
LOUIS BERGER Document no.
Limit
Stress in concrete 2.6 Mpa 16.8 Mpa ok
Stress in Steel 10 Mpa 400 Mpa ok
Pier_ModSkew_121+255
191
LOUIS BERGER Document no.
As QP moments are less than cracking moments of section, therforcesection remains uncracked
Limit
Crack width 0 mm 0.3 mm OK
section is uncracked
Vertical Reinforcement
Transverse Reinforcement
Spacing Dia
Provided in Drawing 150 mm OK 12 mm OK
spacing of transverse RF should not be more than dia should not be less than
192 mm 8 mm
1800 mm 4 mm
200 mm
Pier_ModSkew_121+255
192
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning 4800197-GGN-DD-33
of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in Job No. 4800197
the state of West Bengal Date
No. of piles = 6 A ML
Eccentricity between Column
and C.G of Pile group = 0.00 m
5.1
Minimum Thickness of Pile
cap = 1.8 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m -1.8, 3.6 1.8, 3.6
Pile diameter = 1.2 m
Area of pile = 1.131 m2
Pier Size = 1.8 X 5.80 8.7 MT
Loads on Pile
-1.8, -3.6 1.8, -3.6
Normal-LWL Seismic & WInd - LWL
Maximum Pile Load = 301 t. OK 483 OK A
Minimum Pile Load = 112 t. OK -110 OK Max. horizontal load on pile ULS = 17 T OK
Normal-HFL Seismic - HFL .
Maximum Pile Load = 314 OK 495.53 OK
Minimum Pile Load = 121 OK -92 OK
Calculation of loads on piles for each load combination
ML x 1.8 ML ML = Moment along longitudinal direction
Load due to ML = =
1 x 19.4 10.8 MT = Moment along transverse direction
MT x 3.6 MT (REFER ANNEXURE VI)
Load due to MT = =
1 x 51.8 14.4 Normal Seismic
Type of Load case Sr no Pile capacity from soil investigation report = 530 t 662.5 t
Normal Load case 1 to 3 Maximum uplift Capacity of Pile = 100 t 125 t
Wind Load case 4 to 6 Lateral pile capacity from soil investigation report = 40 t
Seismic Transverse 7 to 12
Seismic Longitudinal 13 to 18
Seismic Vertical 19 to 24 ( self wt of pile excluded)
LWL -Case
1
1287 461 469 62 35 214 43 32 290 139 12 36
N
o 2
1253 292 575 61 34 209 53 20 282 135 12 35
r
m
a 3
l 1241 763 448 61 32 207 42 53 301 112 11 35
4
1252 627 599 82 54 209 55 44 308 110 16 50
W 5
i 1218 386 675 77 45 203 63 27 292 114 15 45
n
6
d 1206 959 588 82 54 201 54 67 322 80 16 50
7 1093 2271 1451 197 324 182 134 158 474 -110 63 191
8 1209 2299 1317 197 324 201 122 160 483 -80 63 191
9 1087 2245 1332 196 321 181 123 156 460 -98 63 190
10 1202 2245 1332 196 321 200 123 156 480 -79 63 190
11 1085 2324 1302 195 320 181 121 161 463 -101 62 189
12 1199 2324 1302 195 320 200 121 161 482 -82 62 189
S 13 1095 1139 1723 293 154 183 160 79 421.15 -56 55 168
e 14 1207 1139 1723 293 154 201 160 79 439.78 -37 55 168
i
s 15 1088 1099 1742 293 153 181 161 76 419.08 -56 55 167
m 16 1200 1099 1742 293 153 200 161 76 437.70 -38 55 167
i
c 17 1086 1190 1716 293 153 181 159 83 422.54 -61 55 167
18 1198 1190 1716 293 153 200 159 83 441.17 -42 55 167
19 958 807 707 114 109 160 65 56 281.17 38 26 80
20 1344 807 707 114 109 224 65 56 345.54 102 26 80
21 953 768 726 113 108 159 67 53 279.32 38 26 79
22 1336 768 726 113 108 223 67 53 343.24 102 26 79
23 951 863 708 114 108 159 66 60 284.02 33 26 80
24 1333 863 708 114 108 222 66 60 347.59 97 26 80
Pier_ModSkew_121+255
193
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four-Laning 4800197-GGN-DD-33
of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari section in Job No. 4800197
the state of West Bengal Date
HFL Case
1
N 1351 466 486 66 37 225 45 32 302.41 148 13 38
o
r 2
1317 297 592 66 35 220 55 21 294.98 144 12 38
m
a 3
l 1305 768 465 65 34 218 43 53 313.90 121 12 37
4 1316 632 616 87 55 219 57 44 320.18 118 17 52
W 5
i 1282 391 692 82 47 214 64 27 304.97 122 16 48
n
6
d 1270 964 605 87 55 212 56 67 334.68 89 17 52
7 1157 2275 1333 201 324 193 123 158 474.28 -89 64 193
8 1273 2303 1333 201 324 212 123 160 495.53 -71 64 193
9 1151 2249 1348 200 322 192 125 156 472.84 -89 63 192
10 1266 2249 1348 200 322 211 125 156 492.02 -70 63 192
11 1149 2328 1318 199 321 191 122 162 475.15 -92 63 191
12 1263 2328 1318 199 321 211 122 162 494.22 -73 63 191
13 1159 1143 1741 298 155 193 161 79 433.79 -47 56 170
S
e 14 1271 1143 1741 298 155 212 161 79 452.41 -29 56 170
i 15 1152 1103 1761 298 155 192 163 77 431.71 -48 56 170
s
m 16 1264 1103 1761 298 155 211 163 77 450.34 -29 56 170
i 17 1150 1194 1734 298 154 192 161 83 435.18 -52 56 169
c
18 1262 1194 1734 298 154 210 161 83 453.80 -33 56 169
19 1022 812 723 118 110 170 67 56 293.64 47 27 82
20 1408 812 723 118 110 235 67 56 358.01 111 27 82
21 1017 772 743 118 109 169 69 54 291.79 47 27 81
22 1400 772 743 118 109 233 69 54 355.71 111 27 81
23 1015 867 725 118 109 169 67 60 296.50 42 27 82
24 1397 867 725 118 109 233 67 60 360.07 105 27 82
Pier_ModSkew_121+255
194
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-33
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No. 4800197
Salsalabari section in the state of West Bengal Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
Minimum Thickness of
3.6 3.6 0.85
Pile cap = 1.8 m
Thickness of pile cap = 1.8 m
Pile offset from edge = 0.15 m
Pile diameter = 1.2 m
Area of pile = 1.131 m2
Pier Size = 1.8 X 5.80
0 0
Loads on Pile
Normal HFL
Maximum Pile Load = 329 t. 348
Minimum Pile Load = 112 t. 126 .
Calculation of loads on piles for each load combination Max. horizontal load on pile = 15.33 T
LWL - Case
Pier_ModSkew_121+255
195
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-33
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur- Job No. 4800197
Salsalabari section in the state of West Bengal Date
Designed by: Checked by
Design of Pier P1 for MJB at Ch: 121+255 14-12-2018
Vishal Siddhartha
HFL - Case
Vertical Load due Load due BM for pile
Load Max. Resultant
load P MT (T-m) ML (T-m) HL (T) HT (T) P/n (T) to ML -P1 to MT -P1 Min. load (T) =H(L1+Lf)/2
no. load (T) H (T)
(T) (T-m) (T-m) (T-m)
..1 Calculation of depth of fixity and maximum moment in pile for Maximum scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Lf = 2 * 3.7 = 7.4 m
= 7.4 m
3
= Q * (L1 + Lf) / (12[pile
Y * E head
* I) deflection of equivalent cantilever for fixed head pile]
= 0.0016 m
1.6 mm
MF = Q * (L1 + Lf) / 2 [Fixed end moment of equivalent cantilever for fixed head pile ]
Pier_ModSkew_121+255
196
LOUIS BERGER Document no.
Pile Desgin-SLS
Pile design
SLS - Stress check
stress Limit
Compressive stress -2.7 Mpa 16.8 Mpa OK
Stress in steel 12.3 Mpa 400 Mpa OK
Result of critical case - SLS rare
Limit
Crack width 0 mm 0.3 mm OK
section is uncracked
Pier_ModSkew_121+255
197
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-33
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No. 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pile 14-12-2018
Vishal Siddhartha
Design of Pile Foundation-ULS
5.1
No. of piles = 6
Eccentricity between Column
0
and C.G of Pile group = m
3.6 3.6 0.85
Minimum Thickness of Pile
cap = 1.8 m
Thickness of pile cap = 1.8 m OK
Pile offset from edge = 0.15 m
Pile diameter = 1.2 m
0 0
Area of pile = 1.131 m2 8.7
Pier Size = 1.8 X 5.80
18 1684 1728 2570 436 229 281 238 120 639 -77 82 249
19 1320 1177 1038 163 162 220 96 82 398 42 38 116
20 1899 1177 1038 163 162 317 96 82 494 139 38 116
21 1315 1134 1057 163 161 219 98 79 396 43 38 116
22 1891 1134 1057 163 161 315 98 79 492 139 38 116
23 1315 1223 1030 162 160 219 95 85 399 39 38 115
24 1887 1223 1030 162 160 314 95 85 495 134 38 115
Pier_ModSkew_121+255
198
LOUIS BERGER Document no.
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by Four- 4800197-GGN-DD-33
Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A) Ghoshpukur-Salsalabari Job No. 4800197
section in the state of West Bengal
Date
Designed by: Checked by
Design of Pile 14-12-2018
Vishal Siddhartha
HFL - Case
1 2021 846 838 116 71 337 78 59 473 201 23 69
2 1971 528 970 111 62 329 90 37 455 202 21 64
3 1953 1298 807 114 66 326 75 90 490 161 22 67
4 1941 637 622 89 54 324 58 44 425 222 17 53
5 1903 482 829 99 57 317 77 33 427 207 19 58
Load case No:7 to 24 seismic load combination is taken as 1.35 times the forces transmitted to it by substructure as per Cl.219.8 of IRC : 6-2017.
Calculation of depth of fixity and maximum moment in pile for HFL scour
The depth of fixity and bending moments in the pile have been worked out as per
IS 2911 Part 1/ sec2 Appendix C (clause 5.5.2). The pile is considered to be in submerged soil of medium sand type
as per the soil report. Fixed head condition of piles is applicable because of pile cap at the top.
Max scour
dia = Diameter of the pile = 1.200 m
T = (E * I / K1)^0.2
where
E = 2 = 32000000 kn/m^2
Youngs Modulus of the concrete in kg/cm
I = Moment of Inertia of the pile cross section in =cm 4 0.1017876 m^4
K1 = Modulus of subgrade reaction as per Table 1= 4900 kn/m^3
Q = Resultant horizontal force on pile - =
NORMAL CASE (MAX) 22.6 t
= Resultant horizontal force on pile - =
SEISMIC 85.5 t
Pier_ModSkew_121+255
199
LOUIS BERGER Document no.
4800197-GGN-DD-33
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No. 4800197 Date
Reinforcement details
Cross - section Main steel Shear RF
no. of bar 21 no. of bar 21 dia 16 mm
dia 25 dia 25 mm spacing 150 mm
Total Asr 10308.35089 Total Asr 10308.35 mm^2
Pier_ModSkew_121+255
200
LOUIS BERGER Document no.
4800197-GGN-DD-33
Detailed Engineering Consultancy Services for Rehabiliation and Upgradation by
Four-Laning of NH-31D from KM 113.20 to KM 154.854 (Package-II A)
Ghoshpukur-Salsalabari section in the state of West Bengal Job No. 4800197 Date
Section check
UR 0.92 OK
Pier_ModSkew_121+255
201
Annexure - I
General
Ductile detailing shall be carried out for bridges located in zones III,IV and V of
seismic zone map of IRC:6
5650.369837 mm
B core dimension (along trans dimension)
1650 mm
D core dimension (along longitudinal dimension)
Dia. Of stirrup along B f = 12 mm
no. of legs along width (along trans dimension) = 27
Area of the stirupps and ties Asp = 3054 mm2
Dia. Of stirrup along D f = 10 mm
no. of legs along Depth (along long dimension) = 10
Area of the stirupps and ties Asp = 785 mm2
2
Confined area = 9323110.231 mm
100 mm
Spacing of hoops or ties SL =
O.K
Confinement RF
202
DESIGN OF PIER CAP
203
INPUT AND
LOAD CALCULATIONS
204
LOUIS BERGER Document no.
13.2
0.662 3.310 3.310 3.31013 3.31013 0.662027
0.681 P1 P3 P3 P1
P1
1.269
3.9
1.269
A2
P2 P4 P4 P2
0.681
205
LOUIS BERGER Document no.
Case-2: For maximum torsional moment case (One Span Dislodged case)
LL Reaction on P1 = 0.00 t
Reaction on P1 due to transverse moment = ± 0.00 t
ALWAYS PUT P2/P4 AS MAX REACTION SIDE BEARINGS ** Ref CWLL analysis page for total LL
Total reaction on P1+P3 = 0.00 t Reaction. It is distributed among 10 bearings
Total reaction on P2+P4= 264.00 t of one side span only
From the above it is clear that maximum Transverse moment case is governing.
206
SUMMARY OF FORCES
AND MOMENTS
207
LOUIS BERGER Document no.
622.733 1598.828
Summary of forces and moments at face of pedastal Only P1+P2 FOR THIS CASE
P1/P2 for Max. P & Max. Mt case
Factored Factored
Loads Load Factor Shear Moment
Shear Moment
T T-m T T-m
Dead load 1.35 107.400 42.96 144.990 57.996
Dead load of Pier cap upto
9.810 13.244 5.297
pedastal face 1.35 3.92
SIDL 1.35 39.600 15.84 53.460 21.384
SIDL - Wearing course 1.75 16.200 6.48 28.350 11.340
LL 1.5 103.050 41.22 154.575 61.830
210
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pier Cap at Ch. 121+255 17-12-2018
Material Specification:
STRENGTH CHECK
MATERIAL DATA
3 Grade of Steel 550
4 Characteristic strength of reinf. (fyk) Mpa 550
5 Partial factor for steel (Уs) 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200
8 Grade of Concrete 35
9 Charecterstic comp. strength (fck) Mpa 35
10 α 0.67
11 Concrete material factor (Уm) 1.50
Design value for Concrete comp. strength (fcd =
12 Mpa 15.63
αfck/Уm)
Geometric Data
13 Width of slab(b) mm 3900
14 depth of Member mm 1700
15 Clear Cover mm 50
16 Dia of reinforcement mm 25
17 Number of bars Nos. 34
18 Dia of reinforcement mm 25
19 Number of bars Nos. 34
20 Area of reinforcement mm² 33379
21 Reinforcement (Ast/bd) 0.0053
22 Hence Pt= (100*Ast/bd) % 0.53
23 Dia of Shear Reinforcement mm 12
24 Spacing of reinforcement mm 150
25 number of legs Nos. 14 These legs excludes outer stirrup for torsion
26 Reinforcement(%)
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pier Cap at Ch. 121+255 17-12-2018
Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 1601
32 Depth of NA from comp. flange (x) mm 327
33 λ 0.80
34 η 1.00
35 Depth of stress Block (λx) mm 262
36 Stress on stress Block (η fcd) MPa 15.63
37 Total comp. force (Fc = λxηfcdb) KN 15964
38 Total tension Force (Fs = fyd At) KN 15964
39 Diff (Fc-Fs) KN 0
40 Depth of Lever arm (z) = d-λx/2 mm 1470
41 Moment of resistance (Fc*z) KN-m 23460
42 UR for pure bending 0.68
43 Status O.K.
44 Effective As long for only Bending mm² 22748
45 DFtd KN 3113.67
46 As long for additional tensile RF from Shear force mm² 6507
47 UR for combined shear + bending 0.88
48 Status O.K.
49 Max. strain on concrete in comp. 0.0035
50 Max. strain on reinf. in tension 0.0044
51 Max. depth of NA From Comp. Flange mm 710
52 Status (under/Reinf, Over Reinf or Bal) U/R
53 fctm MPa 2.80
54 Min. reinforcement mm² 8262
55 Status O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 800
58 2d = mm 3201
59 αv = m 2.768
60 β= 0.865
61 Design Shear force,Ved = kN 5385
62 K = 1+sqrt(200/d)<=2 1.353
63 σcp MPa 0.000
64 ρ1=At/(bd)<=0.02 0.005
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.289
66 Concrete Shear Capacity Vrd.c =
KN 2476
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 1803
69 [Vmin+(0.15σcp)]bwd
70 Status (if 0 = reinf. Not reqd;or 1 = reinf reqd) 1.
71 Design shear force (Ved) KN 5385
72 Design yield strength. of shear reinf. (fywd=fyd) MPa 478.26
73 Cotθ 1.00
74 Required area of Shear reinforcement (Aws) mm²/mm 1172
75 Nos 14
76 Provided area of Shear reinforcement (Aws) mm²/mm 1583
77 shear capacity w/ vertical shear renf.(Vrd,s) KN 7272
78 αcw 1.00
79 V1 0.53
80 Max. shear Capcity w/ vertical shear renf. (VRd,max) KN 23373
81 Final shear Capcity (VRd) KN 7272
82 UR for only shear= 0.74
83 Status O.K.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pier Cap at Ch. 121+255 17-12-2018
Ithis will slightly enhance Bending UR, but again in the span dislodged case, the Bending UR itself will
139
be very low. Hence, Torsion is not governing & provided RF is suffi ent to cater for.
140
141 For other faces, Provided Bar Dia mm 12
142 Spacing mm 150
143 AsL / sL provided (mm2/mm). 0.754
OK
214
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
STRESS CHECK
2 MATERIAL DATA
3 Grade of Steel 550
4 Characteristic strength of reinf. (fyk) Mpa 550
5 Partial factor for steel (Уs) 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.3
7 Modulus of Elasticity of Steel (Es) Gpa 200
8 Grade of Concrete 35
9 Charecterstic comp. strength (fck) Mpa 35
10 α 0.67
11 Concrete material factor (Уm) 1.50
12 Design value for Concrete comp. strength (fcd = Mpa 15.63
13 Modulus of Elasticity of Concrete (Ecm) GPa 32
14 Geometric Data
15 Width of slab(b) mm 3900
16 Total depth of slab mm 1700
17 Clear Cover mm 50
18 Dia of reinforcement mm 25
19 Spacing of reinforcement mm 34
20 Dia of reinforcement mm 25
21 Spacing of reinforcement mm 34
22 Area of reinforcement mm² 33379
23 Reinforcement (%) 0.01
24 Dia of Shear Reinforcement mm 12
25 Spacing of reinforcement mm 150
26 number of legs Nos. 14
27 Reinforcement(%) 0
28 Effective depth of section (d = D-c-φ/2) mm 1638
29 Stress Check
30 Concrete Cross Sectional Area (Ac) mm² 6630000
31 Perimeter in contact with atmosphere (u) mm 11200
32 Notional size (=2Ac/u) mm 1184
33 Age of loading Days 28
34 Relative humidity % 80
35 Final creep co-efficent of 28 days (φ) 1.50
36 Effective modulus of Elasticity of Concrete Mpa 12800
37 Modular ratio 15.63
38 Allowable stress in steel Mpa 330
39 Allowable stress in Concrete Mpa 16.80
40 K=sqrt{2*pt*m+(pt*m)2-pt*m 0.334
41 Postion of NA axis from compression flange (x) mm 546
42 MOA of Compression area mm² 5.82E+08
43 MOA of Tension Area mm² 5.82E+08
44 Diff. mm² 0.00E+00
45 MOI of Cracked Section mm4 8.33E+11
46 Stress in tension reinforcement σst MPa 233
UR 0.71
47 Status O.K.
48 Stress in concrete Mpa 7.44
UR 0.44
49 Status O.K.
2 MATERIAL DATA
3 Grade of Steel 550
4 Characteristic strength of reinf. (fyk) Mpa 550
5 Partial factor for steel (Уs) 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200
8 Grade of Concrete 35
9 Charecterstic comp. strength (fck) Mpa 35
10 α 0.67
11 Concrete material factor (Уm) 1.50
12 Design value for Concrete comp. strength (fcd = Mpa 15.63
13 Modulus of Elasticity of Concrete (Ecm) GPa 32
14 Geometric Data
15 Width of slab(b) mm 3900
16 Total depth of slab mm 1700
17 Clear Cover mm 50
18 Dia of reinforcement mm 25
19 Number of bars mm 34
20 Dia of reinforcement mm 25
21 Number of bars mm 34
22 Area of reinforcement mm² 33379
23 Reinforcement (Ast/bd) 0.0053
Hence Pt= (100*Ast/bd) % 0.53
24 Dia of Shear Reinforcement mm 12
25 Spacing of reinforcement mm 150
26 number of legs Nos. 14
27 Reinforcement(%) 0
28 Effective depth of section (d = D-c-φ/2) mm 1638
29 Whether the section is Cracked or not?
30 Uncracked MOI of the gross section mm^4 1.6E+12
31 Stress At extreme fibers MPa 3.89
32 fctm MPa 2.80
33 Status Cracked
29 Stress Check
Crack
30 Status check
reqd.
30 Concrete Cross Sectional Area (Ac) mm² 6630000
31 Perimeter in contact with atmosphere (u) mm 11200
32 Notional size (=2Ac/u) mm 1184
33 Age of loading Days 28
34 Relative humidity % 80
35 Final creep co-efficent of 28 days (φ) 1.50
36 Effective modulus of Elasticity of Concrete Mpa 12800
37 Modular ratio 15.63
38 Allowable stress in steel Mpa 330
39 Allowable stress in Concrete Mpa 16.8
40 K=sqrt{2*pt*m+(pt*m)2-pt*m 0.334
41 Postion of NA axis from compression flange (x) mm 546
42 MOA of Compression area mm² 5.82E+08
43 MOA of Tension Area mm² 5.82E+08
50 Crack Check
51 αe = Es/Ecm 6.25
52 depth hc eff mm 156
53 Eff area of conc in tension surrounding reinf Ac, eff mm² 609375
54 ρp eff 0.0548
55 fctm MPa 2.80
56 kt 0.50
57 (ϵsm-ϵcm) = 0.00058
58 0.6σsc/Ec 0.00045
59 k1 0.80
60 k2 0.50
61 min. clear cover mm 50
62 Sr. max 247.59
63 Wk = Sr, max (ϵsm-ϵcm) mm 0.144
64 Allowable crack width mm 0.30
UR 0.48
65 Status O.K.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the
State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pier Cap- Corbel at Ch. 121+255 17-12-2018
DESIGN OF PIER CAP
The Pier Cap is designed as a bracket. Details of maximum bearing reactions for various load
cases are given below.
For designing the bracket, ultimate loads are considered and as the normal case is governing, this is
only presented.
MATERIAL PROPERTIES
Concrete Grade (Cube strength) fck 35 Mpa
Steel Grade fsy 500 Mpa
Strength reduction factor f 0.85
Friction Factor m 1.4
S/d = 1.072 OK
a = 247
Design of Corbel
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the
State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal Siddhartha
Design of Pier Cap- Corbel at Ch. 121+255 17-12-2018
Tor L in
Design of Corbel
DESIGN OF PILE CAP FOR PIER PILE CAP
218
DESIGN OF PILE CAP FOR PIER PILE CAP
219
DESIGN OF PILE CAP FOR PIER PILE CAP Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in
the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
220
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
ULS CONDITION
221
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
No. of piles = 6
SECTION MODULUS
PILE 1 2 3
ZT 14.4 1.00E+22 14.4
ZL 10.8 10.8 10.8
Group I (Case-1)
446 388 329 1163
Group I (Case-2)
428 392 355 1175
Group I (Case-3)
463 374 284 1121
222
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
223
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 4800197-GGN-DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km. 154+854
(Package-2-A) of Ghoshpukur-Salsalabari section in the State of West
Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
ULS CONDITION
Group V (Case-2B) Seismic Vertical(+V) 506 428 349 1284
HFL
Group V (Case-3A) Seismic Vertical(-V) 415 330 245 991 CASE
Transverse direction:-
Since there is no bending in trasnverse direction so there will be minimum reinforcement in trasnverse direction
224
LOUIS BERGER Document no.
SLS CONDITION
No. of piles = 6
SECTION MODULUS
PILE 1 2 3
ZT 14.4 1E+22 14.4
ZL 10.8 10.8 10.8
225
LOUIS BERGER Document no.
CRACK WIDTH
V = 1308 t
Max Load on a Pile= 218 t
Downward Weight due to pile cap = 64.60 t
Lever arm = 0.90 m
Moment due to S.W. & Cushion = 58 tm
Net B.M = 531 t-m
226
ULS CHECK
227
LOUIS BERGER Document no.
Material Specification:
STRENGTH CHECK
MATERIAL DATA
3 Grade of Steel 550
4 Characteristic strength of reinf. (fyk) Mpa 550
5 Partial factor for steel (Уs) 1.15
6 Design value for tensile strength (fyd = fyk/Уs) Mpa 478.26
7 Modulus of Elasticity of Steel (Es) Gpa 200
8 Grade of Concrete 35
9 Charecterstic comp. strength (fck) Mpa 35
10 α 0.67
11 Concrete material factor (Уm) 1.50
Design value for Concrete comp. strength (fcd =
12 Mpa 15.63
αfck/Уm)
Geometric Data
13 Width of slab(b) mm 1000
14 depth of Member mm 1800
15 Clear Cover mm 75
16 Dia of reinforcement mm 25
17 Spacing of bars mm 100
18 Dia of reinforcement mm 0
19 Spacing of bars mm 100
20 Area of reinforcement mm² 4906
21 Reinforcement (Ast/bd) 0.0029
22 Hence Pt= (100*Ast/bd) % 0.29
23 Dia of Shear Reinforcement links mm 10
24 Spacing of reinforcement in other direction mm 280
25 number of legs Nos. 5 (links per meter)
26 Reinforcement(% )
228
As per Clause 16.5.1.1 of IRC:112-2014, Min. & Max Main Reinforcement.
Strength of section
31 Eff. depth of section (d = D-c-φ/2) mm 1678
32 Depth of NA from comp. flange (x) mm 188
33 λ 0.80
34 η 1.00
35 Depth of stress Block (λx) mm 150
36 Stress on stress Block (η fcd) MPa 15.63
37 Total comp. force (Fc = λxηfcdb) KN 2347
38 Total tension Force (Fs = fyd At) KN 2347
39 Diff (Fc-Fs) KN 0
40 Depth of Lever arm (z) = d-λx/2 mm 1602
41 Moment of resistance (Fc*z) KN-m 3760
42 UR for pure bending 0.76
43 Status O.K.
Shear Resistance
56 Shear reduction factor, β = αv/2d
57 0.5d = mm 839
58 2d = mm 3355
59 αv = m 0.900
60 β= 0.262
61 Design Shear force,Ved = kN 837
62 K = 1+sqrt(200/d)<=2 1.345
63 σcp MPa 0.000
64 ρ1=At/(bd)<=0.02 0.003
65 Vmin = 0.031*k^(3/2).fck^(1/2) KN 0.286
66 Concrete Shear Capacity Vrd.c =
KN 542
67 [0.12.K(80p1fck)^0.33+(0.15σcp)]bwd
68 Min. Concrete Shear Capacity Vrd.cmin =
KN 480
69 [Vmin+(0.15σcp)]bwd
70 Status (if 0 = reinf. Not reqd;or 1 = reinf reqd) 1.
71 Design shear force (Ved) KN 837
72 Design yield strength. of shear reinf. (fywd=fyd) MPa 478.26
73 Cotθ 1.00
74 Required area of Shear reinforcement (Aws) mm²/mm 325
75 Nos 5
76 Provided area of Shear reinforcement (Aws) mm²/mm 393
77 shear capacity w/ vertical shear renf.(Vrd,s) KN 1013
78 αcw 1.00
79 V1 0.53
80 Max. shear Capcity w/ vertical shear renf. (VRd,max) KN 6281
81 Final shear Capcity (VRd) KN 1013
82 UR for only shear= 0.83
83 Status O.K.
229
PUNCHING SHEAR CHECK
230
LOUIS BERGER Document no.
Detailed Engineering in Connection with Rehabilitation and Up-Gradation to Four Laning of 4800197-GGN-DD-
Job No 4800197
033
NH-31D from Km. 113+200 to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee 14-12-2018
Design of Pile Cap for Pier at Ch: 121+255
DESIGN FOR PUNCHING SHEAR IN PILE CAP AS PER IRC : 112 - 2011
3
Density of concrete 25 KN/m
3
Density of soil 18 KN/m
Characteristic Strength, fck 35 Mpa
Design Strength of concrete, fcd 15.63 Mpa
Net Applied Force, Ved 6328 KN
Net downward force within the control perimeter, DVEd 287.2 KN
Overall depth of pile cap 1800 mm
Effective Depth of Pile Cap, d 1697.0 mm
Reinforcement Ratio, rl 0.0012
Distance between the edge of pile to the edge of pier 0.559 < 2d
VEd,red = VEd - DVEd 6040.52 KN
n = 0.6 x [1-fck/310] 0.532
Maximum Punching Shear Resistance , nRd.max = 0.5 x n x fcd 4.16 Mpa
0.5
K = 1 + (200/d) 1.34 ≤2
1.5 0.5
nmin = 0.031 x K x (fck) 0.286 Mpa
Distance of control perimeter from column periphery, a 0.6 mm
2xd/a 6071.56
Perimeter along control line, p 3616.00 mm
2
Area enclosed by control line 3.94 m
nEd,red = VEd,red /(bd) 0.984 MPa
nmin x 2d/a 1733.626 MPa
0.333
nRd = 0.12 x K x (80.r1.fck) x (2d/a) 1733.626 MPa
HENCE, OK
231
SLS CHECK
232
LOUIS BERGER Document no.
4800197-GGN-DD-
Detailed Engineering in Connection with Rehabilitation and Up-Gradation Job No 4800197 033
to Four Laning of NH-31D from Km. 113+200 to km. 154+854 (Package-2-
A) of Ghoshpukur-Salsalabari section in the State of West Bengal on EPC
mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
Load Data
1 Moment KN-m 7313
Material Data
2 Grade of Steel Fe 500
3 Charecterstic strength of reinforcement (fyk) 500
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 434.78
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200
7 Grade of Concrete M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35
9 α Cl 6.4.2.8,IRC 112 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50
Design value for concrete compressive strength (fcd=
11 αfck/γm) Cl 6.4.2.8,IRC 112 MPa 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32
Geometric Data
13 Width of Slab/Beam (b) mm 9000
14 Total depth of Slab/Beam (D) mm 1800
15 Cover to Reinforcement mm 75
16 Dia of Reinforcement (φ) in first layer mm 20
18 Effective depth of beam/Slab (d) mm 1715
19 Spacing of Reinforcement (s) or mm 120
20 Number of Bar (n) Nos 75
21 Area of Reinforcement (At) mm2 23562
22 Reinforcement (%) 0.145
Stress Check
23 Concrete Cross Sectional Area (AC) mm2 16200000
24 Perimeter in contact with atmosphere (u) mm 21600
25 Notional Size (=2AC/u) mm 1500
26 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 1.50
27 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112MPa 12800
28 Modular ratio (m) 15.63
29 Allowable stress in Steel Cl 12.2.2,IRC 112MPa 300
30 Allowable stress in Concrete Cl 12.2.2,IRC 112MPa 16.80
31 Position of nuetral axis from comp. face (x) mm 335.9
32 MOA of Compression area mm2 5.08E+08
2
33 MOA of Tension area mm 5.08E+08
2
34 Diff. mm 0
4
35 MOI of cracked section mm 8.14E+11
36 Stress in tension reinf. MPa 193.626
UR 0.65
37 Status O.K.
38 Stress in concrete MPa 3.018
UR 0.18
39 Status O.K.
233
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
Load Data
1 Moment KN-m 5206
Material Data
2 Grade of Steel Fe 500
3 Charecterstic strength of reinforcement (fyk) Table 18.1,IRC 112 MPa 500
4 Partial factor for steel (γs) Cl 6.2.2,IRC 112 1.15
5 Design value for tensile strength (fyd=fyk/γs) Cl 6.2.2,IRC 112 MPa 434.78
6 Modulus of Elasticity of Steel (ES) Cl 6.2.2,IRC 112 GPa 200
7 Grade of Concrete M35
8 Charecterstic compressive strength (fck) Table 6.5,IRC 112 MPa 35
9 α Cl 6.4.2.8,IRC 112 0.67
10 Concrete material factor (γm) Cl 6.4.2.8,IRC 112 1.50
11 Design value for concrete compressive strength (fcd= αfck/γm)
Cl 6.4.2.8,IRC 112 MPa 15.63
12 Modulus of Elasticity of Concrete (Ecm) Table 6.5,IRC 112 GPa 32
Geometric Data
13 Width of Slab/Beam (b) mm 9000
14 Total depth of Slab/Beam (D) mm 1800
15 Cover to Reinforcement mm 75
16 Dia of Reinforcement (φ) in first layer mm 20
17 Effective depth of beam/Slab (d) mm 1715
18 Spacing of Reinforcement (s) or mm 120
19 Number of Bar (n) Nos 75
20 Area of Reinforcement (At) mm2 23562
21 Reinforcement (%) 0.145
Stress Check
22 Concrete Cross Sectional Area (AC) mm2 16200000
23 Perimeter in contact with atmosphere (u) mm 21600
24 Notional Size (=2AC/u) mm 1500
25 Age at Loading days 28
26 Relative humidity Table 6.9 , IRC %
112 12800
27 Final Creep Co-efficient (φ) Table 6.9 ,IRC 112 15.6
28 Effective Modulus of Elasticity of Concrete (Eeff) Cl 6.4.2.5,IRC 112
MPa 1924.8
29 Modular ratio (m) 103.906
30 Allowable stress in Steel Cl 12.2.2,IRC 112
MPa 400.0
31 Allowable stress in Concrete Cl 12.2.2,IRC 112
MPa 12.60
32 Position of nuetral axis from comp. face (x) mm 731.5
33 MOA of Compression area mm2 2.41E+09
34 MOA of Tension area mm2 2.41E+09
35 Diff. mm2 0.000
36 MOI of cracked section mm4 3.54E+12
234
LOUIS BERGER Document no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Up- Job No 4800197 DD-033
Gradation to Four Laning of NH-31D from Km. 113+200 to km.
154+854 (Package-2-A) of Ghoshpukur-Salsalabari section in the State
of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Pile Cap for Pier at Ch: 121+255 14-12-2018
CALCULATION FOR CRACK WIDTH FOR BENDING As per 12.3.4 of IRC 112-2011
41 Wk = Sr,max (esm-ecm)
42 ae = Es/Ecm 6.25
43 depth hc,eff mm 212.5
44 Eff area of conc in tension surrounding reinf Ac,eff mm2 1912500
45 Rr,eff 0.0123
46 fctm Mpa 2.800
47 fct,eff Mpa 2.800
48 kt 1.500
49 (esm-ecm)= {ssc - kt(fct,eff/Rr,eff)(1+aeRr,eff)}/Es -0.0011
50 0.6*ssc/Ec 0.0005
51 (esm-ecm) 0.0005
52 K1 0.80
53 K2 0.50
54 Minimum clear cover c 75.00
55 Srmax = 3.4c+0.425k1k2f/Rreff 531
56 Wk = Sr,max (esm-ecm) 0.239
57 Allowable crack width 0.300
58 UR 0.80
59 Status O.K.
235
LOUIS BERGER Document no.
substructure
hc
Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 688.9 Ton = 124.0 Tons
Force to be resisted by each reaction block = 24.8 Tons for 5.0 blocks
Factored load for seismic 1.5 times = 1.5 37.2 Tons
Height of the Reaction Block 1000 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 850 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 850 mm including dirtwall
236
LOUIS BERGER Document no.
At = Hu 175 mm2
.85*fy
Fed 37 ton > Vrd,c 52.9 ton Vert Stirrups Not reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 428 mm2
237
LOUIS BERGER Document no.
substructure
hc
Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 688.9 Ton = 124.0 Tons
Force to be resisted by each reaction block = 24.8 Tons for 5.0 blocks
Factored load for seismic 1.5 times = 1.5 37.2 Tons
Height of the Reaction Block 1000 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 850 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 1000 mm
238
LOUIS BERGER Document no.
At = Hu 175 mm2
.85*fy
Fed 37 ton > Vrd,c 63.1 ton Vert Stirrups Not reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 428 mm2
239
LOUIS BERGER Document no.
substructure
h
Seismic Coeff
Zone 5
Z factor 0.36
R factor 3 for reaction blocks as per cl 219.5.5 Table 9 of IRC:6-2014
(for blocks designed as primary resisting members )
Importance 1.2 for Bridge
Sa/g = 2.5
ah = 0.18
Hence, Seismic force = 0.18 X 722.3 Ton = 130.0 Tons
Force to be resisted by each reaction block = 65.0 Tons for 2.0 blocks
Factored load for seismic 1.5 times = 1.5 97.5 Tons
Height of the Reaction Block 842 mm
Width of the reaction Block (dirn perpendicular to seismic dirn) b 900 mm
Depth of the reaction Block (dirn parallel to seismic dirn) h 1400 mm
240
LOUIS BERGER Document no.
At = Hu 459 mm2
.85*fy
241
LOUIS BERGER Document no.
substructure
hc
242
LOUIS BERGER Document no.
At = Hu 1318 mm2
.85*fy
Fed 280 ton > Vrd,c 106.4 ton Vert Stirrups reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 3218 mm2
243
LOUIS BERGER Document no.
substructure
h
244
LOUIS BERGER Document no.
At = Hu 706 mm2
.85*fy
Fed 150 ton > Vrd,c 106.4 ton Vert Stirrups reqd
Av (vert stirrrup) >= 0.5*F Ed /(fyd) = 1724 mm2
245
DESIGN OF TEST PILES
246
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Job No 4800197 DD-033
Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Test Piles for MNB at Ch. 121+255 17-12-2018
Deflection of pile group at pile top level for fixed head condition
Deflection, y = 10.18 mm
L1 = 3.7 m
L1/T 1.01
Lf/T = 1.85 (From Fig (4), IS: 2911(Part-1/Sec 2) -2010 - Free head pile)
Lf = 6.79 m
y= 10.18 mm
For the test pile, the pile section is checked for adequacy of the section under following load cases:
1) Safe Load
2) Ultimate Load
Under safe load case, the pile section is designed as per Servicibility limit state - stress theory with
permissible stresses conforming to IRC code. Under ultimate load case, the section is checked under
Ultimate limit state theory as per IRC. Following loads have been considered for the checking of pile
247
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Job No 4800197 DD-033
Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Test Piles for MNB at Ch. 121+255 17-12-2018
sections under various load combinations:
Mmax = m * Mf
= m * Q * (L1 + Lf) {Refer Appendix C, IS:2911 (Part 1/ Sec2) - 2010}
m = Reduction Factor = 0.48
Where:
LOAD CASE
Q= 9 t
Mmax = 0.48 x 9 x 10.487369376473445
= T-m
Q= 22.5 t
Mmax = 0.48 x 22.5 x 10.4873693764734
113.264 T-m
=
It is proposed to provide following reinforcement (Grade Fe500 having minimum elongation of 14.5% &
conforming to IS: 1786) in the test pile:
STRESSES IN PILE SECTION UNDER SAFE LOAD (P=0, Mmax = 45.3054357063649 t-m)
Design is based on Servicibilty limit state - stress theory in conformity with IRC code. Stresses
in the pile section have been checked using an in-house software(FAGUS) and the results are shown below:
248
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Job No 4800197 DD-033
Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Test Piles for MNB at Ch. 121+255 17-12-2018
Results:
2 2
Stress in concrete = 2.4 N/mm < 16.8 N/mm Hence OK
2 2
Stress in steel = 30 N/mm < 300 N/mm Hence OK
Design is based on Ultimate limit state method in conformity with IRC code. Capacity of the pile
section has been checked using the FAGUS software and the results are as shown below :
Pu = 0 N
Mu = 113.264 t-m
fck = 35 Mpa
D= 1200 mm (Dia of pile)
d' = 99 mm (Eff. Cover to reinforcement)
% reinf provided = 0.61 %
249
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Job No 4800197 DD-033
Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Test Piles for MNB at Ch. 121+255 17-12-2018
REINFORCEMENT DETAILS
250
Document
LOUIS BERGER no.
4800197-GGN-
Detailed Engineering in Connection with Rehabilitation and Job No 4800197 DD-033
Up-Gradation to Four Laning of NH-31D from Km. 113+200
to km. 154+854 (Package-2-A) of Ghoshpukur-Salsalabari
section in the State of West Bengal on EPC mode Designed by: Checked by: Date
Vishal S.Chatterjee
Design of Test Piles for MNB at Ch. 124+946 17-12-2018
PIER PILES
It is proposed to provide following reinforcement (Grade Fe500 having minimum elongation of 14.5% &
conforming to IS: 1786) in the test pile:
Same test pile as used in lateral load test shall be used. Hence, reinforcement proposed is Pt =0.43%
Under vertical load compression in concrete governs
Vu = 993 t
2
A= 1.1310 m (for 1200mm dia pile section)
2 2
c = Vu/A = 877.56 t/m < 1680 t/m for M35.
Hence OK
251