Project : 2S MITSUBISHI SERVICE CENTER

Owner : MINDANAO INTEGRATED COMMERCIAL ENTERPRISE CORP.


Location : KORONADAL CITY, SOUTH COTABATO PROVINCE, MINDANAO
Architect : Ar. Mary Kayo Oshin Gonzales
Subject : Bill of Quantities
Date: : 01/21/2020

BID BREAKDOWN
MATERIAL
SCOPE OF WORKS QTY UNIT
COST
LABOR COST UNIT COST TOTAL

A GENERAL REQUIREMENTS
1.0 Mobilization/Demobilization lot - -
2.0 Temporary Facilities lot - -
3.0 Temporary Power Connection, Lighting and Consumption lot - -
4.0 Temporary Water Connections lot - -
5.0 Telephone/Communications lot - -
6.0 Security Services/Safety Provision lot - -
7.0 Site Managements, Plant, Equiptment and others lot - -
8.0 General Cleaning, Sanitation and Disposal of Waste/Debris lot - -
9.0 Temporary Fence/Canopy lot - -
10.0 Others (pls. specify) lot - -
Sub -Total A -
B PERMITS/CLEARANCES
1.0 Barangay/Locational/Zoning Clearance lot - -
2.0 Building Permit (Repair/Renovation Permit) lot - -
3.0 Side Walk and Fencing permits lot - -
4.0 Occupancy Permit lot - -
5.0 Lot Survey lot - -
6.0 Material Testing lot - -
7.0 Others (pls. specify) lot - -
Sub -Total B -
C BONDS & INSURANCES
1.0 Performance Bond lot - -
2.0 Contractor's All-Risk Insurance lot - -
3.0 Guarantee/Surety Bind lot - -
4.0 Warranty Bond lot - -
Sub -Total C -
D TESTING
1.0 Concrete Testing cylinders - -
2.0 Rebar Testing sets - -
3.0 Compaction/Field Denstiy Testing sets - -
4.0 CHB testing pcs - -
5.0 Others (pls. specify) lot - -
Sub -Total D -
E SITE WORKS
1.0 Excavation - Using heavy equipment - -
1.0 Column Footing m³ - -
2.0 Cistern Tank m³ - -
3.0 Septic Tank m³ - -
4.0 Oil and Grease Separator m³ - -
5.0 Catch Basin m³ - -
6.0 Sewer Line m³ - -
7.0 Sanitary Line m³ - -
2.0 Compaction m² - -
3.0 Soil Poisoning m² - -
4.0 Back Filling lot - -
5.0 Others, to complete the work (Please specify) lot - -
Sub -Total E -
F STRUCTURAL
1.0 FOUNDATION
1.1 3000psi @ 24 days cu.m. - -
1.2 Gravel Bedding cu.m. - -
1.3 20mmØ x 6m Deformed Bars kg. - -
1.4 #16 Tie Wire kg. - -
1.5 Formworks / Bracing sqm - -
2.0 PEDESTAL
1.1 3000psi @ 24 days cu.m. - -
1.2 25mmØ x 6m Deformed Bars kg. - -
1.3 12mmØ x 6m Deformed Bars Stirrups kg. - -
1.4 #16 Tie Wire kg. - -
1.5 Formworks / Bracing sqm - -
3.0 I-BEAM COLUMNS
1.1 W14X38 kg. - -
2.1 W14X82 kg. - -
3.1 W14X90 kg. - -
4.1 W14X120 kg. - -
5.1 W14X74 kg. - -
6.1 Bracing/Scafolding lot - -
7.1 Anchor Bolts kg. - -
8.1 Base Plate kg. - -
4.0 GIRDERS/BEAMS/JOIST
1.1 W12X30 kg. - -
1.2 W12X26 kg. - -
1.3 W12X19 kg. - -
1.4 W14X82 kg. - -
1.4 2 1/2" x 2 1/2" x 5mm Angular (BEAM) kg. - -
1.5 2 1/2" x 2 1/2" x 5mm Angular (Trusses) kg. - -
1.6 Bracing/Scafolding lot - -
1.7 Base Plate lot - -
5.0 GROUND SLAB
1.1 3000psi @ 24 days cu.m. - -
1.2 12mmØ x 6m Deformed Bars kg. - -
1.3 #16 Tie Wire kg. - -
1.4 Formworks / Bracing sqm - -
1.5 Gravel Bedding cu.m. - -
6.0 STAIR
1.1 3000psi @ 28 days cu.m. - -
1.2 12mmØ x 6m Deformed Bars kg. - -
1.3 Formworks / Bracing sqm - -
1.4 #16 Tie Wire kg. - -
7.0 CAR RAMP
1.1 3000psi @ 24 days cu.m. - -
2.1 12mmØ x 6m Deformed Bars kg. - -
3.1 #16 Tie Wire kg. - -
4.1 Formworks / Bracing sqm - -
8.0 PWD RAMP
1.1 3000psi @ 24 days cu.m. - -
2.1 12mmØ x 6m Deformed Bars kg. - -
3.1 #16 Tie Wire kg. - -
4.1 Formworks / Bracing sqm - -
- -
9.0 SEPTIC TANK
1.1 3000psi @ 24 days cu.m. - -
2.1 12mmØ x 6m Deformed Bars kg. - -
3.1 #16 Tie Wire kg. - -
4.1 Formworks / Bracing sqm - -
- -
10.0 CISTERN TANK
1.1 3000psi @ 24 days cu.m. - -
2.1 12mmØ x 6m Deformed Bars kg. - -
3.1 #16 Tie Wire kg. - -
4.1 Formworks / Bracing sqm - -
- -
11.0 OIL GREASE SEPARATOR
1.1 3000psi @ 24 days cu.m. - -
2.1 12mmØ x 6m Deformed Bars kg. - -
3.1 #16 Tie Wire kg. - -
4.1 Formworks / Bracing sqm - -
- -
Sub -Total F -
G ARCHITECTURAL WORKS
1.0 MASONRY WORKS
1.1 4" thk CHB wall laying complete w/ Rebars 146.13 sqm - -
1.2 100mm Double Wall 84.90 sqm - -
1.3 6" thk CHB wall laying complete w/ Rebars 907.14 sqm - -
1.4 8" thk CHB wall laying complete w/ Rebars 427.46 sqm - -
(stiffener columns and lintel beams every 3000mm) - -
(min. 20mm plaster level) - -
1.3 Plastering 2,961.46 sqm - -
2.0 DOORS AND WINDOWS
2.1 Doors - -
D-1 2000 x 2400mm Glass Door 1.00 pcs - -
D-2 900 x 2100mm Glass Door 3.00 pcs - -
D-3 800 x 2100mm Glass Door 1.00 pcs - -
D-4 800 x 2100mm Glass Door w/ 1700mm glass window 1.00 pcs - -
D-5 800 x 2100mm Glass Door w/ 2000mm glass window 1.00 pcs - -
D-6 700mm x 2100mm Solid door 1.00 pcs - -
800mm x 2100mm Solid door 1.00 pcs - -
D-7 800mm x 2100mm Solid door w/ louvre 1.00 pcs - -
900mm x 2100mm Solid door w/ louvre 1.00 pcs - -
D-8 3000 x 2800 Steel louvre door 1.00 pcs - -
D-9 700 x 2100mm Panel Door 1.00 pcs - -
D-10 900 x 2100mm steel door 4.00 pcs - -
D-11 1600 x 2100mm steel door 5.00 pcs - -
D-12 6900 x 4650mm roll up door 1.00 pcs - -
D-13 5050 x 4000mm roll up door 2.00 pcs - -
D-14 4450 x 6000mm roll up door 1.00 pcs - -
Toilet Partitions 1.00 lot - -
2.2 Windows - -
W-1 18750 x 6000mm Façade glass 1.00 pcs - -
W-2 3290 x 1600mm fixed window 2.00 pcs - -
W-3 2000 x 1600mm fixed window 1.00 pcs - -
W-4 1500 x 1100mm counter window 1.00 pcs - -
W-5 4500 x 1100mm sliding w/ fixed window 1.00 pcs - -
3.0 FINISHES - FLOORING
3.1 600 x 600 Grey Tiles 125.91 pcs - -
3.2 600X600 White ceramic tiles 64.52 - -
3.3 600 x 600 Dark Grey Tiles 12.12 sqm - -
3.4 176 x 1230 AF3090 Wood Planks 60.17 sqm - -
3.5 Smooth Concrete Finish 639.40 sqm - -
3.6 Epoxy Paint - Light Gray RAL 7035 938.70 sqm - -
4.0 FINISHES - CEILING
4.1 12mm Thk Gypsum Board 118.00 sqm - -
4.2 12mm Thk Gypsum Board MR 22.76 sqm - -
4.3 4.50mm thk Fiber Cement Board "Hardieflex" 165.67 sqm - -
5.0 FINISHES - WALL
5.1 Interior Walls - Painting sqm - -
Office Area 1,125.90 sqm - -
Service Area 4,696.86 sqm - -
5.2 Wall tiles 68.25 sqm - -
5.3 Ceiling - -
Showroom - Jet Black RAL 9005 332.10 sqm - -
OTHERS 389.28 sqm - -
6.0 EXTERIOR FINISHES
6.1 Painting Works 3,607.44 sqm - -
6.2 ACP - Squirrel Gray 7000 51.59 sqm - -
7.0 FURNISHING
7.1 Service Adviser Counter 4.00 pcs - -
7.2 Service Cabinet 3.00 pcs - -
7.3 Browsing Counter 1.00 pcs - -
7.4 Bar Counter 1.00 pcs - -
7.5 Laptop Counter 1.00 pcs - -
7.6 Genuine Parts - Display Cabinet 1.00 pcs - -
7.7 OTHERS - -
8.0 ROOFING & INSULATION
Material Cost 1.00 lot - -
8.1 Rib type (Long Span Gray) - -
8.2 Ga.24 PPGI Flashing and other bended - -
8.3 Double foil, double bubble Insulation - -
8.4 Ga.24 S.S Gutter - -
8.5 C-Purlins 50x175x50x4mm - -
8.6 Sog Rod 12mm - -
8.7 Cross Bracing 25mm - -
Sub -Total G -
H PLUMBING (Submit Separate Breakdown)
Submit Separate Breakdown
INCL ROUGH-IN OF HOT & COLD PPR "VESBO" WATER LINE ,TAPPING TO MAIN
MWAS MAIN LINE, STUB-OUTS, PRESSURE TESTING; SOIL AND WASTE LINE
INCLUSIVE OF TAPPING TO MAIN STREET SEWER, WATER TESTING; DRAINAGE
SYSTEM PVC "ATLANTA SERIES 1000" DOWNSPOUTS .VENTS, GROUND
CONCRETE PIPES, LEACHING PERFORATED PIPES, SEWER AND CISTERN PIPING
SYSTEM. PLUMBING, INSTALLATION OF OSM BATHROOM/KITCHEN FIXTURES 1.00 lot
SPECS: WATER MAJOR – SUPER SCHED 40 PPR, DISTRIBUTION PIPE – SUPER
SCHED 40 PPR,

INCLUSIONS: PUMPS (SUPPLIER:EASTMAN OR EQUAL FOR APPROVAL OF


OSENADS) - BOOSTER PUMP

OSM : PLUMBING FIXTURES


Sub -Total H -
I ELECTRICAL (Submit Separate Breakdown)
Power and Lighting System

INCLUDES LIGHT & POWER SYSTEM, METER CENTER, FEEDERS AND


SUBFEEDERS, ENTRANCE POINT, CONDUITS, PANELBOARDS & ECB ,
BOXES, FIRE ALARM SYSTEM AND EQUIPTMENTS,Fire alarm control panel,
Smoke detector, , STANDBY GENERATOR LINE(SINGLE CONDUIT PER ROOM 1.00 lot
ONLY, ATS AUTOMATIC TRANSFER SWITCH, PENTHOUSE FULL LOAD) FIRE
ALARM SYSTEM, MATV/CABLE TV, TELEPHONE AND ENTRY PHONE
SYSTEM, GROUNDING, WIRING DEVICES (PANASONIC "AVESCO" ,
TOSHIBA). “ELECTRICAL CONDUITS- ATLANTA”
INCLUSIONS: PANEL BOARDS, METER CENTER, SWITCHES, LIGHTING FIXTURES
(BRAND FOR APPROVAL OF OSENADS)

Sub -Total I -
J MECHANICAL (Submit Separate Breakdown)
1.0 Exhaust Fans
2.0 Others, to complete the work (Please specify)

OSM : AIRCONDITION UNITS W/INSTALLATION


Sub -Total J -
K FIRE PROTECTION (Submit Separate Breakdown)
INCL ROUGH-IN ,TAPPING TO PUMPS, INCLUSIVE OF VALVES, OTHER
PARTS, HANGERS, SPRINKLER HEADS, CONTROL PANELS, COVER, ETC.
TESTING AND COMMISIONING.
1.00 lot -
INCLUSIONS: PUMPS (SUPPLIER:EASTMAN OR EQUAL FOR APPROVAL OF
OSENADS) - JOCKEY PUMP AND FIRE PUMP

Sub -Total K -
L FURNITURES (Submit Separate Breakdown)
1.0 Sales Reception Counter set/s
2.0 Service Reception Counters set/s
3.0 Service Back Cabinet set/s
4.0 Laptop Counter set/s
5.0 Bar Counter set/s
6.0 Brochure Stand set/s

Sub -Total L -
MATERIAL & LABOR COST -
12% VALUE ADDED TAX -
TOTAL CONSTRUCTION COST -

Prepared by:

Submitted by:

Contractor's name: