Professional Documents
Culture Documents
The NC program can be changed without switching the operation mode of the PLC. The function
will operate according to the XMC O/S version, so please make sure you are using the latest version
of XMC O/S.
[Steps]
1. Create a new XMC-type project with the menu [Project] - [New Project].
2. Connect to the XMC module via the project menu [Online] – [Connect] and select
[Online] – [Change Mode] - [Run] to switch the PLC status to Run Mode.
3. Menu [Online] - [Write] allows you to write NC programs to the PLC without switching
modes.
4. Refer to Error Code and Description below for errors related to downloading NC
programs during run.
3) Changed the media default value of the XGL-EFMF(B) and XGL-EFMHB communication
module to "100M/FX/FULL".
4) Improves Status Monitor Items of XMC
Enhancements have been made to keep items edited by Edit Monitor Item on the Status Monitor
when the project is reopened.
For the XGK (XGB) project, the input/output addresses are separately displayed.
6) Add XGB-XBCXS CPU Module Type
XGB-XBCXS model has been added. Refer to the XGB-XBCXS manual for details of the model.
2. Error Correction
1) Fixed an error that XG5000 will close when clicking Preview in XMC model project printing.