Calculation of fee amount to be charged from road users as per fee rule 2008 and amendments from Km.654.

204 TO 700.544 of NH 16

Total length 46.34 Km at Nathavalasa (at Km 656.704) For the year 2020-21

HCM/ EME / Oversized (7 or


Description Car LCV Truck/ Bus MAV (3 axles) Monthly Pass
MAV (4-6 axles) more axles)

1 Base rates A 0.65 1.05 2.2 2.4 3.45 4.2 150


2 Fixed increase (12*3%) B= A * 36% 0.234 0.378 0.792 0.864 1.242 1.512 54
3 Revised base rates C= A+B 0.884 1.428 2.992 3.264 4.692 5.712 204
4 WPI as on 06.01.07 (All Commodities) D 208.7 208.7 208.7 208.7 208.7 208.7 208.7
5 WPI for Dec, 2018 (119.7x 1.873X1.641=367.909) E 367.909 367.909 367.909 367.909 367.909 367.909 367.909
STRECH 6 40% of increase in WPI (As % of revised base rates) F=(E-D)/D*0.4 0.3051 0.3051 0.3051 0.3051 0.3051 0.3051 0.3051
EFFECTED 7 Increase in base rates due to change in WPI G=C* F 0.2697 0.4357 0.9130 0.9960 1.4317 1.7430 62.2494
BY 75% 8 Revised base rates (Cummulative) H=C+G 1.1537 1.8637 3.9050 4.2600 6.1237 7.4550 266.2494
9 Road Length without Structures I 28.7760 28.7760 28.7760 28.7760 28.7760 28.7760
10 Length of Structures J 0.6046 0.6046 0.6046 0.6046 0.6046 0.6046
11 10 Time for Structure Length K = 10*J 6.0460 6.0460 6.0460 6.0460 6.0460 6.0460
12 Tollable Road Length in Kms (FOR 75% FEE RATES) L=K+I 34.822 34.822 34.822 34.822 34.822 34.822
13 Fee for the road stretch (FOR 75% FEE RATES) M = L *H * 75% 30.132 48.675 101.985 111.256 159.931 194.698 266.2494

14 Base rates 1 0.65 1.05 2.2 2.4 3.45 4.2 150


15 Fixed increase (13*3%) 2=1*39% 0.2535 0.4095 0.858 0.936 1.3455 1.638 58.5
16 Revised base rates 3= 1+2 0.9035 1.4595 3.058 3.336 4.7955 5.838 208.5
STRECH 17 WPI as on 06.01.07 (All Commodities) 4 208.7 208.7 208.7 208.7 208.7 208.7 208.7
NOT 18 WPI for Dec, 2019 (123 x 1.873X1.641=378.052) 5 378.052 378.052 378.052 378.052 378.052 378.052 378.052
EFFECTED 19 40% of increase in WPI (As % of revised base rates) 6=(5-4)/4*0.4 0.3246 0.3246 0.3246 0.3246 0.3246 0.3246 0.3246
i.e . 100% 20 Increase in base rates due to change in WPI 7=3*6 0.2933 0.4737 0.9926 1.0828 1.5565 1.8949 67.6759
21 Revised base rates (Cummulative) 8=3+7 1.1968 1.9332 4.0506 4.4188 6.3520 7.7329 276.1759
22 Tollable Road Length in Kms (FOR 100% FEE RATES) 9 17.564 17.564 17.564 17.564 17.564 17.564
23 Fee for the road stretch (FOR 100% FEE RATES) 10=8*9*100% 21.020 33.955 71.144 77.612 111.567 135.821
24 Fee for the whole section 11=J+10 51.152 82.630 173.129 188.868 271.498 330.519
25 Rounded off fee for single trip 12 50 85 175 190 270 330 275
26 Prerounded fee for return trip 13 = 11 * 1.50 76.728 123.945 259.694 283.302 407.247 495.779
27 Rounded off fee for return trips 14 75 125 260 285 405 495
28 Prerounded fee for monthly pass for 50 trips 15= 11* 50 * 2/3 1705.059 2754.326 5770.970 6295.603 9049.930 11017.306
Rounded off fee for monthly pass valid for 50 single
29 16 1705 2755 5770 6295 9050 11015
trips
Discounted Fee for the commercial vehicles registered
30 17 = 11* 0.5 25.576 41.315 86.565 94.434 135.749 165.260
within the district
Rounded off Fee for the commercial vehicles registered
31 18 25 40 85 95 135 165
within the district