You are on page 1of 8

Water

User Water Requirement Storm water


Zone Functions Sub-functions Characteristics
Type No.of user Staff Reqirement Allotment Total Surface

Domestic Flushing Domestic Flushing


Litres Per seat Litres Per seat L L

Blockbuster 1 Structure 1 Stage Artist/students 5 30 15 150 75

Theatre 1 Seating Audience 120 5 10 600 1200

Backstage Mutli-purpose: Seminar Artist 10 30 15 300 150


hall, Drama learning
Storage centre Artist

Make-up room Artist

Restroom Artist

Basement

Parallel movie screening Projection Room Audience 50 5 10 250 500

Lobby

Seating Customized seating Audience


Multi- lingual Movie
Seating Customized seating Audience 120 5 10 600 1200 450
Theatre
Projection Room Audience

Lobby

Toilets

Seating Customized seating Audience

Museum 40 4 6 160 240 300

Gallery 1 40 4 6 160 240

Gallery 2 40 4 6 160 240

Gallery 3 40 4 6 160 240

2540 4085 6625 750

Blockbuster 2 Structure 2 Restaurant 70 55 15 3850 1050

Kids screening Virtual library 20

Kids play area

VR gaming zone 20 25 20 500 400

Merchandise 20 25 20 500 400

Animated Movie screening Projection Room Audience

Lobby

Toilets

Food court

Seating Customized seating Audience 70 5 10 350 700

Sports screening Projection Room Audience 70 5 10 350 700 450

Lobby

Toilets

Seating Customized seating Audience

Bar 20 10 15 200 300

By choice screening Projection Room Audience 20 5 10 100 200

Lobby

5850 3750 9600 450

Production House Structure 3 500

Studio 2

Stage Artist 10 1

Seating Audience 50 1 5 10 250 500

Backstage Artist 20 2 30 15 600 300

Spill out

Lab Technical staff 20

Studio 1 100 30 15 3000 1500

Spill out

Lab

Conference room 10

Waiting area 5

Courtyard Artist

Storage Artist 2

Make-up room Artist 5

Photoshoot studio Artist 5

Stay Artist 5

Restroom 1 Artist

Attached Toilet Staff

Admin Crew

3850 2300 6150 500

Institute Structure 4 Multi-purpose Hall 200

Set Design Studio 30 25 20 750 600

Animation Studio 30 25 20 750 600

Cinematography Studio 30 25 20 750 600

Content writing Studio 30 25 20 750 600

Digital library

Library

Café

Admin

3000 2400 5400 200


Underground & Overhead water tank collection

Over head Water Tank Calculations

Domestic Flushing Total Contingency(35%) Final Volume Breadth Height B*H Length

Structure 1 2540 4085 6625 2319 8944 8.9 2.0 1.8 3.6 2.5

Structure 2 5850 3750 9600 3360 12960 13.0 2.0 1.8 3.6 3.6

Structure 3 3850 2300 6150 2153 8303 8.3 2.0 1.8 3.6 2.3

Structure 4 3000 2400 5400 1890 7290 7.3 2.0 1.8 3.6 2.0

Domestic Flushing Total Contingency(35%) Final Volume Breadth Height B*H Length

Structure 1 & 3 6390 6485 12875 4506 16234 16 3 1.8 5.4 3.0

Structure 2 & 4 8850 6050 14900 5215 21263 21 3 1.8 5.4 3.9

Under ground water Tank

Structure 1 & 3 9585 9728 19313 6759 24351 24 3 1.8 5.4 4.5

Structure 2 & 4 13275 9075 22350 7823 31894 32 3 1.8 5.4 5.9
Location of Underground water head tank

UGWT

UGWT

Ground floor plan


Storm water roof top collection tank

Storm water collection

Total collection from rooftop Rainwater Available in m3


Roof topSurface area Avg. no of Days of rainfall Avg. rainfall (m) (L)

Structure 1 750 144000 144

Structure 2 450 86400 86.4


80 2.4
Structure 3 500 96000 96

Structure 4 200 38400 38.4

Storing water for 20 days


Total collection from
Volume Breadth Height B*H Length
Roof topSurface area Days of rainfall Avg. rainfall (m) rooftop
Structure 1 750 36000 36 3 2.4 7.2 5

Structure 2 450 21600 21.6 2 2.4 4.8 4.5


20 2.4
Structure 3 500 24000 24 2 2.4 4.8 5

Structure 4 200 9600 9.6 2 2.4 4.8 2


Rooftop storm water collection tank

SWT
SWT

SWT

SWT

Ground floor plan


Borewell Location

Ground floor plan


Surface recharge

Ground floor plan

You might also like