You are on page 1of 6

ADHIVAS HOMES

www.adhivas.com
All Types of civil works, waterproofing & Painting Works

18th January, 2020

To,
The Secretary/ Chairman
Chotu singh co-op Society

Dombivli East 421201

Dear Sir,

This is with reference to our visit at your Society and further to the discussion with you,
please find below the Quotation for the necessary, Plastering Work to be carried out for curing of
your society.

We hope you will find the same up to your mark and assure you best of our services.

Thanking you,

Yours sincerely,

KundanShirsat
9175-619-619
QUOTATION FOR PLASTERING PROOFING WORK

Sr. No DESCRIPTION OF ITEM UNIT QTY. RATE AMOUNT


A Scaffolding:-
Providing and erecting scaffolding and removing the same
as an when / where required, for carrying out the External
treatment work with the help of covering hessian cloth
A.1
to protect dust and dirt (whenever required), ensure that
it remain in position for the entire work duration as
Required and directed.
B EXTERNAL CEMENT PLASTER
1) Carefully breaking and removing in existing external
plaster of walls, etc, brickwork in the vicinity including
cutting a groove first to demarcate the exact area &
citing away of the debris, cleaning etc. .

2) Providing and applying 20-25 mm thick cement plaster in


B.1 two coats with first coat in 12-15 mm thick in 1:5 C.M and Sqft 18200 59 1073800
second coat in 8-10 mm thick in C.M 1:3 finished in proper
line and level including adding Dr. Fixit Pidiproof LW+ 200
ml per 50 kg bag of cementation in both the coats of M/s
Pidilite Industries Ltd , Confirms IS : 2645-2003 and IS: 9103-
2000 standards. At all heights including necessary curing for
both

B.2 3) Carefully breaking and removing in patches the sqft 7800 54 421200
existing Internal plaster of walls, stair case etc,
brickwork in the vicinity including cutting a groove first
to demarcate the exact area & citing away of the debris,
cleaning etc.

C Polymer Treatment To RCC Members


Carefully breaking & removing the existing damaged / corroded
R.C.C. Columns, beam, slabs, chajjas, paradis, fins etc including
disposal & cating away of the debris, cleaning etc in the patches
or long stretches by means of light chisel upto 30mm depth,
upto the level of reinforcement without damaging brickwork,
C.1
plaster in the vicinity, including supplying, providing & erecting
in position the necessary scaffolding, cleaning, disposing of
debris etc complete & then providing and applying polymer
modified cementations mortar treatment upto 30 mm thk.
comprising of following operations
C.2 Reinforcement treatment coat
Chip off the loose & hollow cover concrete to expose the sound
concrete substrate. Clean the rebars by means of mechanical
abrasion to get rid of rust scale deposits & laitance etc.
complete.
Applying rust treatment compound of Dr. Fixit Rust Remover
which effectively cleans the rust off steel surfaces. Clean the
steel with water after 30 minutes.
C.5 Mortar application
Providing and applying polymer modified cement mortar in
proportion of 1(DR. Fixit Pidicrete URP):5(Cement): 15(Quartz
sand) by wt. with water, cement ratio of 0.35 including
application of bonding coat by brushing 1(Polymer): 1(Cement):
0.35 (Water) by wt. including cleaning the surface with air
mixed with water under pressure and subsequent layer up to 10
mm after hardening of polymer manufactured by M/s Pidilite
Industries Ltd.
D Crack Filling
Surface must be thoroughly cleaned, free of dust, grease etc
and washed well with water. The surface to be checked for
cracks, hollowness and loose plastered areas etc if any. All
loose plaster and cracks larger than 10 mm width to be
D.1
repaired with polymer modified mortar using Dr Fixit
Pidicrete URP. The cracks up to 5 mm to be treated with Dr
Fixit Crack-X Paste and the larger ones up to 10 mm with Dr
Fixit Crack-X Shrinkfree / Pidicrete URP.
D.1 Application
Providing & Apply one coats of Dr. Fixit Raincoat
Waterproof Coating without any dilution Maintain the
spreading rate of 3.5 -4.0 sq mtr per litre / coat application
to achieve about 120-150 microns DFT. Apply second coat of
Dr. Fixit Raincoat select Top coat to be apply with interval of
6-8 hours without any dilution. Maintain the spreading rate
of 6.5 sq mtr per litre / coat application to achieve about 60
microns DFT. Achieving total DFT of 180 to 210 microns.
Bridge hairline cracks up to 2 mm. Product having Anti
carbonation properties as per EN 1062 part 6 & Elongation of
100 % as per ASTM D 412 . With 10 years waterproofing
warranty from M/S Pidilite industries.
OR
Providing & Apply one coats of Dr. Fixit Raincoat
Waterproof Coating without any dilution Maintain the
spreading rate of 3.5 -4.0 sq mtr per litre / coat application
to achieve about 120-150 microns DFT. Apply second coat of
Dr. Fixit Raincoat Classic Top coat to be apply with interval
of 6-8 hours without any dilution. Maintain the spreading
D.1 rate of 6.5 sq mtr per litre / coat application to achieve about
60 microns DFT. Achieving total DFT of 170 to 190 microns.
Bridge hairline cracks up to 2 mm .Product having Anti
carbonation properties as per EN 1062 part 6 & Elongation of
100 % as per ASTM D 412 . With 7 years waterproofing and
10 years Paint performance warranty from M/S Pidilite
industries.
F Grill Oil Paint Black Color: Surface Preparation:
Scraping the grill. Apply one coat of primer and allow it to
F.1 dry for 2 - 3 hours. Apply one coat of Black Color Oil Paint.

G PAINTING (NTERNAL )
Scrapping the existing paint and finishes & Providing and
applying Acrylic Emulsion Paint in minimum of three coats of
approved make and shadeon Walls, Ceiling ,plywood
,gypsumboard, surfaces etc including all the necessary
G.1 surfaces preparation. The wall shall be cleaned, filled with
POP punning & applied with one coat of primer to achieve an
even surface to apply paint. As per the directions/ to the
satisfaction of the client (Makes:-AsianPaint, BergerPaint,
Nerolac or equivalent Paint)

Total ₹ 14,95,000.00

-: Terms and Conditions:-

1. Once the quotation is approved and passed, the client will give us the work-order and will release 30%
advance of the approximate estimated cost. Further payment of 25% will be released by the client after
scaffolding and breaking work completed and 25% after completion of 1St Coating and 10% on 2nd coating
the balance 10% will be released by the client on completion of the work.

Note: These calculations are based on the approximate area. The final bill will be made after taking the
physical measurement of the total area in presence of the client or a person appointed by the client and the
difference will be paid accordingly.

In case any damage occurs to the surface after completion of waterproofing work, any further repair
work to be undertaken, the charges for the same be borne by the client.

Water, electricity and storage space for the materials and equipment will be supplied by the society free
of cost.

Any other Structural damage such as columns or pillars which require different treatment will be
charged additionally. .